I applied via Approached by Company and was interviewed in Mar 2024. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jan 2020. There was 1 interview round.
I applied via Walk-in and was interviewed in Aug 2023. There was 1 interview round.
Reactor mechanical seal assembly work involves installing, maintaining, and troubleshooting mechanical seals in reactor systems.
Understanding the components of a mechanical seal assembly
Properly installing and aligning the mechanical seal
Performing routine maintenance on the seal to prevent leaks
Troubleshooting issues such as leaks or malfunctions
Following safety protocols when working with reactor systems
Dial gauge alignment work involves ensuring the accuracy of measurements by adjusting the position of the gauge.
Ensure the dial gauge is securely mounted to a stable surface
Use a calibration standard to check the accuracy of the gauge
Adjust the position of the gauge by loosening the mounting screws and realigning as needed
Verify the accuracy of the gauge after realignment
Possible causes of vacuum pump vacuum problem and troubleshooting steps
Check for leaks in the vacuum system
Inspect the vacuum pump for any damage or wear
Ensure the pump is properly lubricated
Check the vacuum pump's inlet filter for clogs
Verify that the pump is receiving adequate power supply
I applied via Walk-in and was interviewed in Dec 2020. There was 1 interview round.
Glass line reactor mechanical seal fitting parameters are critical for ensuring proper functioning and preventing leaks.
The fitting parameters depend on the type of mechanical seal being used.
Factors such as seal face material, seal face loading, and seal face geometry must be considered.
Proper installation and alignment of the mechanical seal is also important.
Regular maintenance and monitoring of the seal is necessar...
I applied via Naukri.com and was interviewed in Sep 2019. There were 3 interview rounds.
posted on 12 Jan 2021
Preventive maintenance of water seal involves regular inspection, cleaning, and replacement of worn-out parts.
Inspect water seal regularly for signs of wear and tear
Clean water seal and surrounding area to prevent buildup of debris
Replace worn-out parts such as gaskets and O-rings
Ensure proper lubrication of moving parts
Monitor water levels and pressure to prevent leaks
Train operators on proper use and maintenance of w
Gearboxes are selected based on torque, speed, power, and application requirements.
Determine the required torque and speed for the application
Select a gearbox with a suitable gear ratio to achieve the desired output speed and torque
Consider the power requirements and ensure the gearbox can handle the load
Choose a gearbox with the appropriate mounting and shaft configuration for the application
Examples of gearboxes incl
I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 4 interview rounds.
based on 1 interview
Interview experience
Assistant Manager
608
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
579
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive
525
salaries
| ₹0 L/yr - ₹0 L/yr |
Plant Operator
338
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
321
salaries
| ₹0 L/yr - ₹0 L/yr |
Vinati Organics
Atul
Navin Fluorine International
Solvay Specialities