Filter interviews by
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 2 interview rounds.
Safety and SOC of plant are crucial for efficient operations and employee well-being.
Implementing comprehensive safety protocols and procedures to minimize accidents and injuries.
Ensuring compliance with relevant safety regulations and standards.
Regularly conducting safety audits and inspections to identify and address potential hazards.
Providing appropriate safety training and education to all employees.
Establishing a...
Top trending discussions
I appeared for an interview in Sep 2024, where I was asked the following questions.
Experienced executive with a strong background in strategic planning, team leadership, and operational excellence across various industries.
Led a team of 50 in a tech startup, increasing revenue by 30% within two years through innovative product development.
Implemented a new supply chain strategy in a manufacturing firm, reducing costs by 15% and improving delivery times by 20%.
Spearheaded a corporate restructuring ini...
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 2 interview rounds.
Types of packing in distillation column include structured packing, random packing, and trays.
Structured packing provides high efficiency due to its specific design and surface area
Random packing consists of randomly placed materials like ceramic saddles or metal rings
Trays are horizontal plates with holes for vapor and liquid to interact, such as sieve trays or bubble cap trays
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Referral and was interviewed before Sep 2021. There were 4 interview rounds.
General attributes ,Basic knowledge,English,maths
I applied via Recruitment Consultant and was interviewed in Apr 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.
LOTO stands for Lockout/Tagout, a permit system used to control hazardous energy sources during maintenance or servicing of equipment.
LOTO involves locking out energy sources to prevent accidental startup of machinery.
Tagout involves placing a tag on the energy isolation device to indicate it should not be operated.
Permit system requires a written procedure and authorization before work can begin.
Examples of energy sou...
I applied via Naukri.com and was interviewed in Sep 2024. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
607
salaries
| ₹4.5 L/yr - ₹12.8 L/yr |
Deputy Manager
584
salaries
| ₹6.7 L/yr - ₹16 L/yr |
Executive
515
salaries
| ₹2.4 L/yr - ₹7.7 L/yr |
Senior Executive
344
salaries
| ₹3.3 L/yr - ₹10.3 L/yr |
Plant Operator
344
salaries
| ₹1.6 L/yr - ₹5.2 L/yr |
UPL
Coromandel International
PI Industries
Deccan Fine Chemicals