Site Engineer
100+ Site Engineer Interview Questions and Answers for Freshers
Q1. What Are Some of the Biggest Challenges Civil Engineers Face?
Civil engineers face challenges such as managing project budgets, dealing with environmental concerns, and ensuring structural integrity.
Managing project budgets and ensuring cost-effective solutions
Dealing with environmental concerns and implementing sustainable practices
Ensuring structural integrity and safety of buildings and infrastructure
Managing complex construction schedules and coordinating multiple stakeholders
Adapting to changing regulations and codes
Addressing comm...read more
Q2. What's the initial and final setting time of a ideal cement mix
The initial and final setting time of an ideal cement mix refers to the time it takes for the cement to begin to harden and fully harden, respectively.
The initial setting time is the time it takes for the cement to lose its plasticity and become rigid enough to resist certain pressures.
The final setting time is the time it takes for the cement to fully harden and achieve its maximum strength.
The initial setting time is typically around 30 minutes, while the final setting time...read more
Q3. How to find the weight of reinforcement of 16mm dia and 3m length of bars
Weight of 16mm dia and 3m length of bars reinforcement calculation
Calculate the cross-sectional area of the bar using the formula A = πr^2
Multiply the cross-sectional area by the length of the bar to get the volume
Multiply the volume by the density of the reinforcement steel, which is typically 7850 kg/m^3
The final result will be the weight of the reinforcement bar in kg
Q4. What will be strength of cube after3 days, 7 days, 14days and 28days?
The strength of cube increases with time. Generally, it reaches 70-80% of its final strength after 7 days and 100% after 28 days.
The strength of cube is measured in terms of compressive strength.
After 3 days, the cube will have gained around 40-50% of its final strength.
After 7 days, the cube will have gained around 70-80% of its final strength.
After 14 days, the cube will have gained around 90% of its final strength.
After 28 days, the cube will have gained 100% of its final ...read more
Q5. What kind of concrete is used on the wall of MIVAN Shuttering?
Mivan Shuttering walls typically use high-strength concrete with a minimum grade of M25.
High-strength concrete is used for Mivan Shuttering walls
Minimum grade of M25 is recommended
The concrete mix should be designed for easy flow and filling of the shuttering system
Q6. What materials are added before applying new concrete to old concrete( bonding chemical)?
Before applying new concrete to old concrete, bonding chemicals such as bonding agents, primers, or bonding adhesives are added.
Bonding agents help in improving the adhesion between old and new concrete surfaces.
Primers are used to prepare the surface and enhance the bond strength.
Bonding adhesives provide a strong bond between the old and new concrete.
Examples include epoxy-based bonding agents, acrylic bonding agents, and polyurethane bonding adhesives.
Share interview questions and help millions of jobseekers 🌟
Q7. What is meant by pipe schedule ? What is the filler wire for Ar welding ?
Pipe schedule refers to the thickness of the pipe wall. Filler wire for Ar welding is usually made of tungsten.
Pipe schedule is a standardized system used to specify the thickness of the pipe wall.
It is denoted by a number followed by the letter 'S', such as Schedule 40 or Schedule 80.
The higher the schedule number, the thicker the pipe wall.
Filler wire for Ar welding is usually made of tungsten, which has a high melting point and is resistant to corrosion.
Tungsten is often u...read more
Q8. Types of tiles and how to find difference between them
Different types of tiles and how to distinguish them
Ceramic tiles are made of clay and have a glazed or unglazed finish
Porcelain tiles are denser and more durable than ceramic tiles
Natural stone tiles include marble, granite, and slate
Glass tiles are translucent and come in a variety of colors and finishes
To distinguish between tiles, look at their composition, finish, and texture
Site Engineer Jobs
Q9. How many time we pour the concrete in slump cone test and whats size?
Concrete is poured three times in the slump cone test, with the size of the cone being 12 inches in height, 8 inches in diameter at the top, and 12 inches in diameter at the bottom.
Concrete is poured three times in the slump cone test to ensure consistency in the results.
The size of the slump cone used in the test is typically 12 inches in height, 8 inches in diameter at the top, and 12 inches in diameter at the bottom.
The concrete is poured into the slump cone in three layer...read more
Q10. What is difference between ground and earth
Ground is a conducting body that is used as a reference point for electrical circuits, while earth is a large conducting body that acts as a sink for electrical charges.
Ground is a reference point for electrical circuits, while earth is a sink for electrical charges.
Ground is a local concept, while earth is a global concept.
Ground is a man-made concept, while earth is a natural concept.
Ground is used to prevent electrical shocks, while earth is used to dissipate electrical ch...read more
Q11. (1)Why transformers rating is in kva ?
Transformers rating is in kVA because it takes into account both voltage and current.
kVA is a unit of apparent power, which is the combination of real power (measured in kW) and reactive power (measured in kVAR).
Transformers are designed to handle a certain amount of power, and kVA rating takes into account both the voltage and current that the transformer can handle.
For example, a transformer with a rating of 100 kVA can handle a maximum load of 100 kW at a power factor of 1...read more
Q12. Mention Bending Moment diagram in Cantilever beam and Normal beam
Bending Moment diagram shows the variation of bending moment along the length of a beam.
In a cantilever beam, the bending moment is maximum at the fixed end and zero at the free end.
In a normal beam, the bending moment is maximum at the center and zero at the supports.
The bending moment diagram is plotted by taking the area under the shear force diagram.
The bending moment at any point on the beam can be calculated using the equation M = F*d, where F is the shear force and d i...read more
Q13. How many types of cement are there?
There are several types of cement used in construction, each with different properties and applications.
Ordinary Portland Cement (OPC)
Portland Pozzolana Cement (PPC)
Rapid Hardening Cement
Low Heat Cement
Sulfate Resisting Cement
White Cement
Colored Cement
Q14. What is the standard code of steel?
The standard code of steel is typically referred to as the ASTM (American Society for Testing and Materials) code.
ASTM (American Society for Testing and Materials) code is commonly used as the standard code for steel
Different types of steel have different ASTM codes, such as ASTM A36 for structural steel
ASTM codes provide specifications for the composition, properties, and performance of steel materials
Q15. Why haunch is provide What is development length, What is difference between nominal mix and design. Mix of concrete
Haunch is provided for structural stability, development length is the length of reinforcement required for full strength transfer, nominal mix is based on experience while design mix is based on calculations.
Haunch is provided in structural elements like beams to provide additional strength and stability.
Development length is the length of reinforcement required to transfer full strength from reinforcement to concrete.
Nominal mix of concrete is based on past experience and d...read more
Q16. what is the bleeding of concrete? what is m and 25 in concrete grade25..?
Bleeding of concrete is the process of water rising to the surface of freshly placed concrete.
Bleeding occurs due to the settlement of solid particles in the concrete mix.
It can lead to surface defects and reduced durability of the concrete.
Concrete grade25 means the compressive strength of the concrete after 28 days of curing is 25 N/mm².
The 'm' in concrete grade25 refers to the mix ratio of cement, sand, and aggregate used in the concrete mix.
Q17. What is the maximum allowable fresh concrete temerture
The maximum allowable fresh concrete temperature is typically around 90 to 95 degrees Fahrenheit.
Fresh concrete temperature should not exceed the maximum allowable limit to ensure proper curing and strength development.
High temperatures can lead to rapid hydration, reduced workability, and increased risk of thermal cracking.
The maximum allowable temperature may vary depending on factors such as the type of cement used and the ambient conditions.
In hot weather conditions, meas...read more
Q18. 1)What is m25 ratio.? 2) what is steel density? 3) How to calculate steel weight? 4) What is plastering ratio? 5)How many bricks are in 1 cubic meters?
Answers to questions related to construction and engineering.
1) M25 ratio is a mix design ratio used in concrete construction.
2) Steel density is the mass per unit volume of steel.
3) Steel weight can be calculated by multiplying the volume of steel by its density.
4) Plastering ratio refers to the proportion of cement and sand used in plastering.
5) The number of bricks in 1 cubic meter depends on the size of the bricks.
Q19. What is slump test Curing of method
Slump test is a measure of the consistency of fresh concrete.
It is used to determine the workability of concrete.
The test involves filling a standard cone-shaped container with concrete and then removing the cone to see how much the concrete slumps or settles.
The amount of slump is measured in millimeters and indicates the wetness or dryness of the concrete.
Curing is the process of maintaining moisture in the concrete to ensure proper hydration and strength development.
Common...read more
Q20. What is civil engineer and why they useful
Civil engineers design, build, and maintain infrastructure such as roads, bridges, buildings, and water systems.
Civil engineers are responsible for ensuring the safety and functionality of infrastructure projects.
They use their knowledge of mathematics, physics, and engineering to design and plan projects.
They work closely with architects, contractors, and other professionals to ensure projects are completed on time and within budget.
Examples of civil engineering projects inc...read more
Q21. Where is the BM maximum and minimum
BM maximum and minimum refer to the highest and lowest points of the benchmark.
BM maximum is the highest point of the benchmark and is used as a reference for elevation measurements.
BM minimum is the lowest point of the benchmark and is used as a reference for depth measurements.
The location of BM maximum and minimum varies depending on the site and the benchmark used.
BM maximum and minimum are important for accurate surveying and construction work.
Q22. Diffrent type of cement, why cover bolcks are provided, what is starter &why it is used, what is initial and final settting tine of opc etc
Answering questions related to cement types, cover blocks, starter, and initial/final setting time of OPC for Site Engineer position.
Different types of cement include OPC, PPC, PSC, etc.
Cover blocks are provided to protect reinforcement bars from corrosion and to maintain the required concrete cover.
Starter is a reinforcement bar used to connect old and new concrete sections.
Initial setting time of OPC is 30 minutes and final setting time is 600 minutes.
Q23. What are the basic duties of a site Engineer
A site engineer is responsible for overseeing construction projects and ensuring they are completed on time, within budget, and to the required quality standards.
Supervising construction activities on site
Ensuring compliance with building codes and regulations
Managing project timelines and budgets
Coordinating with contractors, architects, and other stakeholders
Preparing progress reports and presenting to management
Ensuring safety measures are in place and followed
Resolving an...read more
Q24. How will you manage the site?
I will manage the site by coordinating with the team, ensuring safety protocols are followed, monitoring progress, and resolving any issues that arise.
Coordinate with the team to assign tasks and ensure everyone is working efficiently
Ensure safety protocols are followed to prevent accidents and injuries
Monitor progress regularly to ensure project timelines are met
Resolve any issues that arise on site promptly to keep the project on track
Maintain good communication with stakeh...read more
Q25. What is a civil site engineer?
A civil site engineer is responsible for planning, designing, and overseeing construction projects.
Responsible for surveying sites, creating blueprints, and ensuring compliance with building codes.
Coordinates with architects, contractors, and other professionals to ensure project success.
Monitors construction progress, resolves issues, and ensures projects are completed on time and within budget.
Examples: designing roads, bridges, buildings, and infrastructure projects.
Q26. What is rcc What is cc What is lintel Min. size of columns Size of bricks. Size of bela Weight of cement bag
RCC stands for Reinforced Cement Concrete, which is a composite material used in construction. CC refers to Plain Cement Concrete.
RCC is a combination of concrete and reinforcement bars to enhance its strength and durability.
CC is a mixture of cement, sand, and aggregates without any reinforcement.
Lintel is a horizontal structural element placed above doors, windows, or openings to support the load from above.
The minimum size of columns depends on the structural requirements ...read more
Q27. What you know about Structural design?
Structural design involves the analysis and design of structures to resist loads and ensure safety and stability.
Structural design is a branch of civil engineering
It involves analyzing and designing structures such as buildings, bridges, and towers
Factors considered in structural design include load capacity, stability, and safety
Structural design also involves selecting appropriate materials and construction methods
Examples of structural design software include SAP2000 and E...read more
Q28. What is thermocouple ? and working.
A thermocouple is a temperature sensor that consists of two different metals joined together at one end.
Consists of two different metals joined together at one end
Generates a voltage proportional to the temperature difference between the two ends
Commonly used in industrial applications for temperature measurement
Examples: Type K thermocouple, Type J thermocouple
Q29. Classification of piles based on their function are use
Piles can be classified based on their function and use.
Piles for supporting structures: These piles are used to support buildings, bridges, and other structures.
Piles for retaining walls: These piles are used to provide stability to retaining walls and prevent soil erosion.
Piles for foundation improvement: These piles are used to improve the load-bearing capacity of weak soils.
Piles for marine structures: These piles are used in the construction of docks, piers, and offshore...read more
Q30. Simply supported beam lapping(Tension and Compression) Zone?
In simply supported beam lapping, tension zone is at the bottom and compression zone is at the top.
Tension zone is at the bottom of the beam where the bars are lapped to resist the tensile forces.
Compression zone is at the top of the beam where the bars are lapped to resist the compressive forces.
Proper lapping of reinforcement bars is essential to ensure structural integrity and load-bearing capacity.
Example: In a simply supported beam, the tension zone is typically located ...read more
Q31. Operation and maintenance of 33kv / 11kv /.4 Line, All responsible for work with safety purpose
Operation and maintenance of 33kv / 11kv /.4 Line with safety in mind is crucial for site engineers.
Regular inspection and testing of equipment to ensure proper functioning
Implementing safety protocols and procedures to prevent accidents
Training staff on safety measures and emergency response
Keeping detailed records of maintenance activities and repairs
Collaborating with other departments to coordinate maintenance schedules
Q32. What's about candidate extras qualifications
The candidate has additional qualifications in project management and CAD software.
The candidate has completed a certification course in project management.
The candidate is proficient in using CAD software such as AutoCAD and SolidWorks.
These qualifications will enable the candidate to effectively manage projects and create accurate designs.
Q33. Concrete work level and finishing work fine
My concrete work level is excellent and I have experience in various finishing techniques.
I have experience in pouring and leveling concrete for foundations, walls, and slabs.
I am skilled in using various finishing techniques such as troweling, stamping, and staining.
I pay close attention to detail to ensure a smooth and even finish.
I am knowledgeable in the proper curing and sealing of concrete to ensure its longevity.
I am familiar with industry standards and safety protocol...read more
Q34. No.of bricks in M^3 Unit of cubic test Procedure of cube test BBS.etc
The interview question is about the number of bricks in a cubic meter, cube test procedure, and BBS.
The number of bricks in a cubic meter varies depending on the size of the brick.
The cube test is used to determine the compressive strength of concrete.
BBS stands for Bar Bending Schedule and is used to determine the quantity of steel required for a construction project.
Q35. What is candidate holiday in week
Candidate holiday in week refers to the number of days off a candidate is entitled to in a week.
Candidate holiday in week is typically 2 days off per week, usually on weekends.
Some companies may offer additional holidays such as public holidays or paid time off.
The specific number of candidate holidays in a week may vary depending on the company's policies.
Q36. What's about material saving in site
Material saving in site is crucial for cost-effectiveness and sustainability.
Using prefabricated materials to reduce waste and save time
Optimizing material usage through accurate measurements and planning
Reusing materials from previous projects or salvaging materials from demolition
Implementing sustainable practices such as using recycled materials or renewable energy sources
Regularly monitoring and tracking material usage to identify areas for improvement
Q37. What do you know about Grab & the Pipeline?
Grab is a Southeast Asian ride-hailing, food delivery, and financial services company. The Pipeline is a program to develop tech talent.
Grab is headquartered in Singapore and operates in 8 countries.
It offers various services like ride-hailing, food delivery, and financial services.
The Pipeline is a program to develop tech talent in Southeast Asia.
It provides training and mentorship to aspiring tech professionals.
The program also offers job opportunities at Grab and partner c...read more
Q38. Ndt tests of members of why it’s been done
NDT tests of members are done to ensure structural integrity and safety.
NDT tests are non-destructive tests used to evaluate the properties of a material, component, or system without causing damage.
These tests help in detecting defects such as cracks, voids, and discontinuities that may compromise the structural integrity of the members.
By conducting NDT tests, engineers can ensure the safety and reliability of structures.
Common NDT methods include ultrasonic testing, radiog...read more
Q39. Why should provide cable (stress) in bridge
Cable (stress) is provided in bridge to increase its load carrying capacity and improve its stability.
Cable (stress) helps to distribute the load of the bridge evenly.
It reduces the amount of material required for construction.
It also helps to improve the stability of the bridge.
Cable (stress) is commonly used in suspension bridges.
It allows for longer spans to be constructed without the need for additional support.
Cable (stress) also helps to reduce the effects of wind and s...read more
Q40. What about candidate role in site
The candidate will be responsible for managing and overseeing the construction site.
Supervising and coordinating construction activities
Ensuring compliance with safety regulations and building codes
Managing subcontractors and suppliers
Maintaining project schedule and budget
Communicating with project stakeholders
Resolving any issues that arise on site
Q41. some standerd size of construction equipment and testing of materials
Standard sizes of construction equipment and testing of materials are crucial for efficient and safe construction.
Standard sizes of construction equipment include excavators, bulldozers, cranes, and loaders.
Testing of materials involves determining their strength, durability, and other properties.
Common tests for construction materials include compressive strength tests for concrete and tensile strength tests for steel.
Equipment and materials must meet industry standards and ...read more
Q42. What you are Excepting CTC ?
I am expecting a competitive CTC based on industry standards and my experience.
I have researched the industry standards for Site Engineer roles and expect a salary within that range.
My experience and skills make me a valuable asset to the company, and I expect to be compensated accordingly.
I am open to negotiation and willing to discuss the details of the compensation package.
I am looking for a CTC that reflects my qualifications and the responsibilities of the position.
Q43. What about you know twin towers?
The Twin Towers were two skyscrapers in New York City that were destroyed in a terrorist attack on September 11, 2001.
The Twin Towers were located in the World Trade Center complex in Lower Manhattan.
They were both 110 stories tall and were completed in 1973.
On September 11, 2001, terrorists hijacked two planes and flew them into the towers, causing them to collapse and killing nearly 3,000 people.
The attacks led to a major shift in global politics and the launch of the War o...read more
Q44. Preparing walls for plastering step by step block work
Preparing walls for plastering involves several steps in block work.
Ensure the block work is complete and free of any debris.
Clean the surface of the walls to remove any dust or dirt.
Apply a coat of bonding agent to the walls to improve adhesion.
Allow the bonding agent to dry before applying the plaster.
Apply the plaster in thin layers, allowing each layer to dry before applying the next.
Smooth out any imperfections in the plaster with a trowel.
Allow the plaster to dry comple...read more
Q45. What is ratio of M25 grade of Concrete?
The ratio of M25 grade of concrete is 1:1:2.
M25 grade of concrete is a mix of 1 part cement, 1 part sand, and 2 parts aggregate.
The compressive strength of M25 grade concrete is 25 MPa or 3625 psi.
M25 grade of concrete is commonly used in construction of buildings, bridges, and roads.
Q46. Do you understand by railway bridge
A railway bridge is a structure built to carry railway tracks over obstacles such as rivers, roads, or other railways.
Railway bridges are designed to support the weight of trains and allow for safe passage over obstacles.
They can be made of various materials such as steel, concrete, or wood.
Railway bridges can be of different types including beam bridges, truss bridges, and arch bridges.
Examples of famous railway bridges include the Forth Bridge in Scotland and the Brooklyn B...read more
Q47. What is your experience in Client billing
I have 3 years of experience in client billing for construction projects.
Prepared monthly client invoices based on project progress and contract terms
Reviewed and verified subcontractor invoices for accuracy before submitting to clients
Communicated with clients to resolve any billing discrepancies or issues
Maintained detailed records of all billing transactions and payments
Worked closely with project managers and accounting team to ensure timely and accurate billing
Q48. Why do not use corrosion resistant bar
Corrosion resistant bars are not used due to their higher cost and limited availability.
Corrosion resistant bars are more expensive compared to regular steel bars.
Corrosion resistant bars may not be readily available in all locations.
In some cases, the level of corrosion in the environment may not warrant the use of corrosion resistant bars.
Proper concrete cover and other protective measures can be sufficient to prevent corrosion of regular steel bars.
Q49. What is a calculate in building time period
Calculating the building time period involves determining the total duration required for completing a construction project.
Calculate based on project scope, size, complexity, and resources available
Consider factors like weather conditions, labor availability, and material delivery
Use project management tools like Gantt charts to schedule tasks and estimate timeframes
Adjust timeline as needed based on progress and unforeseen delays
Q50. What is a long life in buliding structure
A long life in building structure refers to the durability and longevity of the construction, ensuring it remains safe and functional for an extended period of time.
Use of high-quality materials that are resistant to wear and tear
Regular maintenance and inspections to identify and address any issues early on
Proper design and construction techniques to ensure structural integrity
Adherence to building codes and regulations to guarantee safety and longevity
Examples: Reinforced c...read more
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month