Q51. What is OC and SC test of transformer ?

Ans.

OC and SC tests are conducted on transformers to determine their efficiency and performance under different load conditions.

  • OC test (Open Circuit test) is conducted to determine the no-load loss and magnetizing impedance of the transformer.

  • SC test (Short Circuit test) is conducted to determine the full-load copper loss and equivalent resistance of the transformer.

  • Both tests help in evaluating the efficiency and voltage regulation of the transformer.

  • Results from these tests ar...read more

Q52. All type Electrical protection of alternator.....

Ans.

Electrical protection measures for alternators

  • Overcurrent protection: Protects against excessive current flow

  • Overvoltage protection: Prevents damage from high voltage

  • Underfrequency protection: Guards against low frequency operation

  • Overtemperature protection: Prevents overheating of the alternator

  • Reverse power protection: Protects against power flowing back into the alternator

  • Earth fault protection: Detects and isolates faults to ground

  • Short circuit protection: Safeguards agai...read more

Q53. How to make effective supervision at site

Ans.

Effective supervision at site can be achieved through clear communication, regular site visits, and setting clear expectations.

  • Establish clear communication channels with site personnel

  • Regularly visit the site to ensure work is progressing as planned

  • Set clear expectations for quality, safety, and timelines

  • Provide adequate training and resources to site personnel

  • Encourage open communication and feedback from site personnel

  • Address any issues or concerns promptly and fairly

Q54. Single phase loading of three phase transformer

Ans.

Single phase loading of three phase transformer

  • Single phase loads can be connected to one or two phases of a three phase transformer

  • The third phase remains idle and no current flows through it

  • The transformer's capacity is reduced when single phase loads are connected

  • The transformer's efficiency may also be affected

  • Examples include residential and small commercial buildings with single phase loads

Are these interview questions helpful?

Q55. How many types of Testing for Isolator.

Ans.

There are three main types of testing for isolators: mechanical testing, electrical testing, and functional testing.

  • Mechanical testing involves checking the physical components of the isolator such as the contacts, insulators, and operating mechanism.

  • Electrical testing includes measuring the insulation resistance, contact resistance, and dielectric strength of the isolator.

  • Functional testing verifies that the isolator operates correctly under load conditions and isolates the ...read more

Q56. What are the VFD parameters?

Ans.

VFD parameters are settings that control the operation of a variable frequency drive.

  • VFD parameters include frequency, voltage, current, acceleration/deceleration time, and motor overload protection

  • Frequency parameter determines the speed of the motor

  • Voltage parameter determines the amount of voltage supplied to the motor

  • Current parameter determines the amount of current supplied to the motor

  • Acceleration/deceleration time parameter determines how quickly the motor speeds up o...read more

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q57. ABB DCS operation and its card details,server details etc.

Ans.

ABB DCS is a distributed control system used in industrial automation, with various cards and servers for operation.

  • ABB DCS stands for ABB Distributed Control System, used in industries for automation.

  • The system consists of various cards for different functions such as input/output, communication, etc.

  • Servers are used to host the software and manage the communication between different components of the system.

  • Example: ABB 800xA is a popular DCS system used in industries.

  • Examp...read more

Q58. Load calculations in single and three phase electrical supply

Ans.

Load calculations involve determining the amount of power required for a single or three phase electrical supply.

  • For single phase, load is calculated using the formula P=VI, where P is power, V is voltage, and I is current.

  • For three phase, load is calculated using the formula P=√3*V*I*cos(θ), where θ is the phase angle between voltage and current.

  • Load calculations are important for determining the appropriate size of electrical equipment and ensuring safety.

  • Examples of equipm...read more

Senior Electrical Engineer Jobs

Senior Engineer - Electrical & Power 4-8 years
AECOM India Private Limited
4.2
Sathanur
Senior Electrical Engineer 16-22 years
Worley
4.1
Mumbai
Senior Engineer - Electrical Design 7-11 years
AECOM India Private Limited
4.2
Bangalore / Bengaluru

Q59. How many experience in solar filed

Ans.

I have 8 years of experience in the solar field.

  • I have worked on multiple solar projects, including residential and commercial installations.

  • I have experience with solar panel design, installation, and maintenance.

  • I have knowledge of solar inverters, batteries, and monitoring systems.

  • I have conducted feasibility studies and energy audits for solar projects.

  • I have kept up-to-date with the latest advancements in solar technology.

Q60. How vfd operet? Methods

Ans.

VFDs (Variable Frequency Drives) control the speed of AC motors by varying the frequency and voltage of the power supplied to the motor.

  • VFDs use power electronics to convert fixed frequency and voltage AC power to variable frequency and voltage power.

  • They adjust the motor speed by changing the frequency of the power supplied to the motor.

  • VFDs can be controlled through various methods such as analog control, digital control, and network communication.

  • Analog control involves us...read more

Q61. Whan the critical condition in electrical job at solar plant

Ans.

Critical condition in electrical job at solar plant can occur during equipment failure, extreme weather conditions, or safety hazards.

  • Equipment failure such as inverter malfunction or panel damage can lead to critical conditions.

  • Extreme weather conditions like lightning strikes or high winds can pose risks to electrical systems.

  • Safety hazards such as electrical fires or electrocution can also create critical situations.

  • Proper maintenance, monitoring, and safety protocols are ...read more

Q62. Which types of Breakers

Ans.

Types of breakers include circuit breakers, fuse breakers, and earth leakage circuit breakers.

  • Circuit breakers are designed to protect electrical circuits from damage caused by overload or short circuit.

  • Fuse breakers use a fuse to interrupt the circuit when an overload occurs.

  • Earth leakage circuit breakers detect small stray voltages and disconnect the power to prevent electric shock.

  • Other types include thermal-magnetic breakers, residual-current devices, and miniature circui...read more

Q63. Standard used in electrical desiy

Ans.

Various standards are used in electrical design depending on the country, industry, and application.

  • National Electrical Code (NEC) is used in the United States

  • International Electrotechnical Commission (IEC) standards are used globally

  • In the automotive industry, ISO 26262 is used for functional safety

  • In the aerospace industry, DO-254 is used for airborne electronic hardware

  • Standards are also specific to certain applications such as medical devices (IEC 60601) and hazardous loc...read more

Q64. Full Load Current of 1250 kVA , 11 kV Transformer

Ans.

The full load current of a 1250 kVA, 11 kV transformer can be calculated using the formula: Full Load Current (A) = kVA / (1.732 x kV)

  • The full load current is the current drawn by the transformer when it is operating at its maximum rated power.

  • The formula for calculating full load current is: Full Load Current (A) = kVA / (1.732 x kV)

  • In this case, the kVA is 1250 and the kV is 11, so the full load current can be calculated as follows:

  • Full Load Current (A) = 1250 / (1.732 x 11...read more

Q65. Maximum power capacity of project handled

Ans.

Handled projects with power capacity up to 500 MW

  • Managed electrical design and installation for power plants with capacity up to 500 MW

  • Oversaw testing and commissioning of electrical systems for large-scale industrial projects

  • Implemented energy-efficient solutions to optimize power usage and reduce costs

  • Collaborated with cross-functional teams to ensure project timelines and budgets were met

Q66. Previous plant SLD and it's bus changeover scheme.

Ans.

The previous plant SLD (Single Line Diagram) and bus changeover scheme were crucial for the electrical system's operation and maintenance.

  • The Single Line Diagram (SLD) provides a simplified overview of the electrical system, showing the connections between various components such as generators, transformers, and loads.

  • The bus changeover scheme outlines how power can be transferred between different busbars in case of a fault or maintenance, ensuring continuity of supply.

  • Examp...read more

Q67. How to reduce wastage of materials

Ans.

Reduce wastage of materials by implementing efficient inventory management, recycling, and reusing materials.

  • Implement an efficient inventory management system to avoid overstocking and understocking of materials

  • Recycle materials such as paper, plastic, and metal

  • Reuse materials such as packaging materials and scrap metal

  • Donate excess materials to local charities or organizations

  • Use sustainable materials and products

  • Train employees on proper handling and storage of materials

Q68. Electrical codes in Lighting design

Ans.

Electrical codes play a crucial role in lighting design, ensuring safety, efficiency, and compliance.

  • Electrical codes provide guidelines for the installation, wiring, and operation of lighting systems.

  • They specify the minimum requirements for electrical components, such as switches, fixtures, and wiring methods.

  • Codes address issues like proper grounding, circuit protection, and voltage limitations to prevent electrical hazards.

  • They also cover energy efficiency standards, such...read more

Q69. Why dg is in kva not in kw?

Ans.

DG is rated in kVA instead of kW because it takes into account the power factor.

  • kVA takes into account both active and reactive power

  • kW only takes into account active power

  • Power factor affects the ratio of active to reactive power

  • DGs often have a power factor of less than 1, so kVA is a more accurate rating

  • kVA is used for sizing equipment like transformers and switchgear

Q70. How do you install a LT panel

Ans.

To install a LT panel, follow these steps: plan the layout, mount the panel, connect the wiring, test the panel, and ensure safety measures.

  • Plan the layout of the LT panel installation

  • Mount the LT panel securely in the designated location

  • Connect the wiring according to the electrical diagram

  • Test the LT panel to ensure proper functioning

  • Implement safety measures such as grounding and labeling

Q71. Mounting heights for electrical equipment

Ans.

Mounting heights for electrical equipment vary depending on the specific equipment and its intended use.

  • Mounting heights should comply with local building codes and regulations.

  • Consider accessibility and maintenance requirements when determining mounting heights.

  • Common mounting heights for electrical equipment include 6 feet for switches and outlets, and 18 inches for outlets in kitchens and bathrooms.

Q72. Explain the process of generator synchronization

Ans.

Generator synchronization is the process of connecting a generator to an electrical grid without causing damage to the generator or the grid.

  • Ensure the generator voltage, frequency, and phase sequence match the grid

  • Adjust the generator's voltage and frequency to match the grid

  • Close the circuit breaker to connect the generator to the grid

  • Monitor the synchronization process to prevent damage to the generator or the grid

  • Use synchronizing equipment such as synchroscope or synchro...read more

Q73. What is mean of sq mm ?

Ans.

Sq mm stands for square millimeter, a unit of area measurement.

  • Sq mm is a unit of measurement used to quantify the area of a two-dimensional space.

  • It is equal to the area of a square with sides measuring 1 millimeter each.

  • Commonly used in engineering and construction for measuring small areas.

  • Example: A sheet of paper may have dimensions of 210 mm x 297 mm, which is equivalent to 62370 sq mm.

Q74. Difference between GIS and AIS.

Ans.

GIS and AIS are two types of switchgear used in power systems.

  • GIS stands for Gas Insulated Switchgear and uses SF6 gas as insulation.

  • AIS stands for Air Insulated Switchgear and uses air as insulation.

  • GIS is more compact and requires less maintenance than AIS.

  • AIS is less expensive than GIS.

  • GIS is used in high voltage applications while AIS is used in low to medium voltage applications.

Q75. Types of encoders used in industrial.

Ans.

Encoders used in industrial include absolute, incremental, linear, rotary, magnetic, and optical encoders.

  • Absolute encoders provide a unique code for each position

  • Incremental encoders provide a pulse output for each position change

  • Linear encoders measure linear motion

  • Rotary encoders measure rotational motion

  • Magnetic encoders use a magnetic field to detect position

  • Optical encoders use light to detect position

Q76. What's Mesh earthing.

Ans.

Mesh earthing is a type of grounding system where multiple interconnected conductors are buried in the ground to provide a low impedance path for fault currents.

  • Mesh earthing involves burying multiple interconnected conductors in the ground.

  • It provides a low impedance path for fault currents to safely dissipate into the ground.

  • This type of grounding system is commonly used in electrical installations to protect against electrical faults and lightning strikes.

Q77. What is work of wind turbine

Ans.

Wind turbines convert wind energy into electricity through the use of blades that spin a generator.

  • Wind turbines capture kinetic energy from the wind

  • Blades spin a rotor connected to a generator

  • Generator converts mechanical energy into electrical energy

  • Electricity is then sent to the grid for distribution

Q78. HT daily power consumption (90kwh)

Ans.

HT daily power consumption is 90kwh.

  • HT refers to High Tension power supply.

  • The daily power consumption is 90kwh.

  • This information can be used to calculate the monthly or yearly power consumption.

  • The power consumption may vary depending on the usage and load.

  • Efficient use of power can help reduce the consumption and save costs.

Q79. The complete process of orientation

Ans.

Orientation process involves introducing new employees to the company culture, policies, and procedures.

  • Orientation typically starts with a welcome message from the company's leadership team.

  • New employees are given a tour of the office and introduced to their colleagues.

  • They are provided with information about the company's history, mission, and values.

  • They are also given an overview of the company's policies and procedures, including HR policies, safety protocols, and IT gui...read more

Q80. what is encoder what is rectifier

Ans.

Encoder is a device that converts motion or position into an electrical signal. Rectifier is a device that converts AC to DC.

  • Encoder is used in robotics, automation, and motion control systems.

  • Types of encoders include absolute, incremental, linear, and rotary encoders.

  • Rectifiers are used in power supplies to convert AC voltage to DC voltage.

  • Types of rectifiers include half-wave, full-wave, and bridge rectifiers.

Q81. AC Drive used in steel industries

Ans.

AC drives in steel industries control the speed and torque of motors, improving efficiency and reducing energy consumption.

  • AC drives regulate the speed and torque of motors used in various processes in steel industries.

  • They help in achieving precise control over the production process, leading to improved efficiency.

  • AC drives also help in reducing energy consumption and operational costs in steel plants.

  • Examples of applications include controlling the speed of conveyor belts,...read more

Q82. How transformer works.

Ans.

Transformers work by transferring electrical energy between two or more circuits through electromagnetic induction.

  • Transformers have two coils of wire, known as the primary and secondary coils.

  • When an alternating current flows through the primary coil, it creates a changing magnetic field.

  • This changing magnetic field induces a voltage in the secondary coil, transferring electrical energy between the two circuits.

  • Transformers are used to step up or step down voltage levels in ...read more

Q83. How to calculate cable size?

Ans.

Cable size can be calculated based on current carrying capacity, voltage drop, and installation conditions.

  • Determine the current carrying capacity required for the cable based on the load

  • Calculate the voltage drop allowed for the cable based on the distance and voltage rating

  • Consider the installation conditions such as ambient temperature and grouping of cables

  • Use cable sizing charts or online calculators to find the appropriate cable size

Q84. Maintenance experience

Ans.

I have extensive maintenance experience in electrical engineering.

  • Managed maintenance schedules for electrical equipment and systems

  • Performed routine inspections and identified potential issues

  • Developed and implemented preventative maintenance plans

  • Troubleshot and repaired electrical equipment and systems

  • Collaborated with cross-functional teams to ensure timely maintenance and repairs

Q85. What is load flow study

Ans.

Load flow study is a method used in electrical engineering to analyze and calculate the flow of power in an electrical network.

  • Load flow study helps in determining the steady-state operating conditions of a power system.

  • It involves calculating the voltage magnitude and phase angle at each bus in the network.

  • The study considers factors like power generation, transmission line losses, and load demand.

  • It helps in identifying potential issues such as voltage instability, overload...read more

Q86. What is System studies

Ans.

System studies involve analyzing and evaluating the performance of electrical systems to ensure efficiency and reliability.

  • System studies involve analyzing the behavior of electrical systems under different operating conditions.

  • They help identify potential issues and optimize the performance of the system.

  • Examples of system studies include load flow analysis, short circuit analysis, and protection coordination studies.

Q87. 132/6.6 kv substation operation work

Ans.

132/6.6 kv substation operation involves managing high voltage equipment for power distribution.

  • Understanding the operation and maintenance of high voltage equipment such as transformers, circuit breakers, and switchgear

  • Ensuring proper grounding and safety measures are in place to prevent electrical hazards

  • Monitoring voltage levels, current flow, and overall substation performance

  • Troubleshooting and resolving any issues that may arise during operation

  • Coordinating with other d...read more

Q88. How to calculate voltage drop

Ans.

Voltage drop can be calculated using Ohm's Law and the formula V = I * R

  • Calculate the current flowing through the circuit (I)

  • Determine the resistance of the circuit (R)

  • Use the formula V = I * R to calculate the voltage drop (V)

Q89. How to size a transformer

Ans.

To size a transformer, calculate the required kVA based on load requirements and select a transformer with a suitable kVA rating.

  • Calculate the total load in kVA by adding up the individual loads in the system.

  • Consider the diversity factor to account for simultaneous operation of loads.

  • Select a transformer with a kVA rating equal to or greater than the calculated total load.

  • Take into account future expansion and efficiency requirements when sizing the transformer.

  • Ensure the tr...read more

Q90. Whats urs aim in life

Ans.

My aim in life is to continuously learn and grow, both personally and professionally, while making a positive impact on the world around me.

  • To constantly seek new challenges and opportunities for growth

  • To contribute to meaningful projects and make a difference in the lives of others

  • To strive for excellence in all that I do

  • To maintain a healthy work-life balance and prioritize self-care

  • To inspire and mentor others in their own personal and professional development

Q91. Draw a SLD of a Substation

Ans.

A Single Line Diagram (SLD) of a Substation shows how electrical power is distributed within the substation.

  • Include main components like transformers, circuit breakers, disconnect switches, etc.

  • Show the flow of electricity from the incoming transmission lines to the outgoing distribution lines.

  • Label all components and indicate their ratings and connections.

  • Use standard symbols and conventions for clarity.

  • Consider safety measures and redundancy in the design.

Q92. Project flow steps details

Ans.

Project flow steps involve planning, design, implementation, testing, and maintenance.

  • Planning: Define project scope, objectives, and requirements.

  • Design: Develop a detailed plan and create schematics.

  • Implementation: Install and integrate components.

  • Testing: Verify functionality and performance.

  • Maintenance: Monitor and update system as needed.

  • Examples: Building a power distribution system, designing a control panel for a manufacturing line.

Q93. Vfd breaking diagram

Ans.

VFD breaking diagram is a graphical representation of the braking process of a variable frequency drive.

  • VFD breaking diagram shows the flow of energy during the braking process.

  • It helps in understanding the braking mechanism of the VFD.

  • The diagram includes components like diodes, resistors, and capacitors.

  • It is important to follow the manufacturer's guidelines while designing the braking circuit.

  • The braking circuit should be designed based on the application requirements.

Q94. Earthing process in sub station

Ans.

Earthing process in substation involves connecting all metallic parts to the earth to prevent electric shock and ensure safety.

  • Earthing rods are driven into the ground to create a low-resistance path for fault currents.

  • All metallic parts like transformers, switchgear, and structures are connected to the earthing system.

  • Regular testing and maintenance of the earthing system is essential to ensure its effectiveness.

  • Proper earthing reduces the risk of electric shock and equipmen...read more

Q95. AVR controlling flow diagram

Ans.

AVR controlling flow diagram is a visual representation of how an AVR microcontroller controls various components in a system.

  • AVR microcontroller receives input signals from sensors or user interfaces.

  • AVR processes the input signals and executes programmed instructions.

  • AVR sends output signals to control actuators or devices in the system.

  • Flow diagram shows the sequence of events and decision points in the control process.

Q96. What is soiling loss

Ans.

Soiling loss refers to the reduction in energy output of solar panels due to accumulation of dirt, dust, or other debris on the surface.

  • Soiling loss is a common issue in solar energy systems, especially in areas with high levels of pollution or dust.

  • The accumulation of dirt on the surface of solar panels reduces the amount of sunlight that can be absorbed and converted into electricity.

  • Regular cleaning and maintenance of solar panels can help reduce soiling loss and improve e...read more

Q97. What is a CT

Ans.

A CT, or Current Transformer, is a type of instrument transformer used to measure alternating current.

  • CTs are used to step down high currents to a lower, more manageable level for measurement or protection purposes.

  • They consist of a primary winding connected in series with the circuit carrying the current to be measured, and a secondary winding connected to the measuring or protection device.

  • CTs are commonly used in power systems for metering, protection, and control applicat...read more

Q98. DMM machine operation

Ans.

DMM machine operation refers to the use of a digital multimeter to measure electrical values.

  • DMMs are used to measure voltage, current, resistance, and continuity.

  • To use a DMM, select the appropriate function and range, connect the test leads to the circuit, and read the display.

  • Some DMMs also have additional features such as data logging and temperature measurement.

  • It is important to follow safety precautions when using a DMM, such as wearing appropriate personal protective ...read more

Q99. Draw a room lighting fixture

Ans.

A room lighting fixture with a modern design and energy-efficient LED bulbs.

  • Consider the size and shape of the room when designing the fixture

  • Choose energy-efficient lighting options such as LED bulbs

  • Incorporate modern design elements for a sleek look

Q100. Construction Management Type

Ans.

Construction management involves overseeing the planning, design, and construction of projects to ensure they are completed on time and within budget.

  • Coordinate with architects, engineers, and contractors to develop project plans

  • Manage project schedules and budgets to ensure timely completion and cost efficiency

  • Oversee construction activities to ensure compliance with design specifications and safety regulations

  • Communicate regularly with stakeholders to provide updates on pro...read more

Previous
1
2
3
Next
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

3.9
 • 589 Interviews
4.1
 • 417 Interviews
4.3
 • 78 Interviews
3.7
 • 37 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Senior Electrical Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter