Project Cost Control Engineer
Project Cost Control Engineer Interview Questions and Answers
Q1. Constants for various Civil Activities on Builtup Area
Constants for civil activities on builtup area are determined by factors such as soil type, foundation type, and building height.
Constants for civil activities on builtup area vary depending on soil type
Foundation type also plays a role in determining constants for civil activities
Building height is another factor that affects constants for civil activities
Examples of civil activities include excavation, foundation construction, and concrete pouring
Q2. Types Of Painting & Plaster work
Painting and plaster work are important aspects of construction projects.
Types of painting include interior, exterior, decorative, and protective.
Plaster work involves applying a mixture of cement, sand, and water to walls and ceilings.
Different types of plaster include gypsum plaster, lime plaster, and cement plaster.
Plaster work can also involve creating decorative finishes such as stucco or Venetian plaster.
Proper preparation and application techniques are crucial for achi...read more
Q3. Rate analysis for Civil Items
Rate analysis for Civil Items involves calculating the cost of materials, labor, and equipment needed for a construction project.
Identify the materials required for the project
Determine the cost of each material
Calculate the labor cost based on the number of workers and hours required
Factor in the cost of equipment needed for the project
Consider any additional costs such as transportation and overhead
Example: Rate analysis for building a house would involve calculating the co...read more
Project Cost Control Engineer Jobs
0Interview Questions of Similar Designations
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month