Planning Engineer

20+ Planning Engineer Interview Questions and Answers for Freshers

Updated 7 Oct 2024

Popular Companies

search-icon

Q1. Oil and Gas construction activities from civil, piping, Equipment etc .

Ans.

Oil and gas construction activities involve civil, piping, and equipment work.

  • Civil work includes building foundations, roads, and drainage systems.

  • Piping work involves installing pipelines for oil and gas transportation.

  • Equipment work includes installing and commissioning various types of equipment such as pumps, compressors, and turbines.

  • Other activities include electrical and instrumentation work, testing and commissioning, and project management.

  • Examples of oil and gas co...read more

Q2. How to track a project on daily basis in Primavera P6

Ans.

To track a project in Primavera P6 on a daily basis, use the following steps.

  • Update progress for each activity daily

  • Review critical path activities regularly

  • Monitor resource allocation and availability

  • Compare planned vs. actual progress

  • Generate daily reports for stakeholders

Q3. How could you manage fund flow during project through your work plan.

Ans.

I would create a detailed budget and cash flow plan to track expenses and ensure funds are available when needed.

  • Develop a comprehensive project budget that includes all expenses

  • Create a cash flow plan to track when funds will be needed and ensure they are available

  • Regularly monitor expenses and adjust the cash flow plan as needed

  • Communicate with stakeholders to ensure they are aware of funding needs and any potential issues

  • Consider alternative funding sources if necessary

Q4. Whats of views in ,when creating material ?

Ans.

Views in creating material include cost, quality, availability, and sustainability.

  • Consider cost implications of materials chosen

  • Ensure quality meets project requirements

  • Check availability of materials in required quantities

  • Evaluate sustainability aspects of materials used

Are these interview questions helpful?

Q5. What are child part anad standard items

Ans.

Child parts are components that make up a larger item, while standard items are pre-designed parts used in multiple products.

  • Child parts are used to create a larger item, such as a car engine being made up of multiple components.

  • Standard items are pre-designed parts that are used in multiple products, such as screws or bolts.

  • Child parts can be customized or modified to fit specific needs, while standard items are typically mass-produced and not customizable.

Q6. How many types of material are there

Ans.

There are countless types of materials, ranging from natural to synthetic, organic to inorganic, and metals to plastics.

  • Materials can be classified based on their composition, properties, and usage.

  • Some common types of materials include metals, ceramics, polymers, composites, and semiconductors.

  • Natural materials include wood, stone, and animal products, while synthetic materials include plastics and synthetic fibers.

  • Materials can also be classified based on their physical pro...read more

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. how to make Contract for vendors

Ans.

A contract for vendors should clearly define the scope of work, payment terms, delivery schedule, quality standards, and dispute resolution mechanisms.

  • Define the scope of work and deliverables

  • Specify the payment terms and schedule

  • Set quality standards and acceptance criteria

  • Include provisions for warranties and guarantees

  • Outline the dispute resolution mechanisms

  • Include clauses for termination and breach of contract

  • Ensure compliance with legal and regulatory requirements

  • Provid...read more

Q8. How do you manage procurement schedule

Ans.

I manage procurement schedule by creating a detailed plan, tracking progress, identifying risks, and communicating with stakeholders.

  • Create a detailed procurement schedule outlining key milestones and deadlines

  • Track progress regularly to ensure tasks are completed on time

  • Identify potential risks and develop contingency plans to mitigate them

  • Communicate effectively with suppliers, team members, and stakeholders to ensure alignment and address any issues

  • Regularly review and upd...read more

Planning Engineer Jobs

Planning Engineer 10-20 years
Larsen & Toubro (L&T)
4.0
Jamnagar
SAC Planning Engineer 6-10 years
A.P. Moller Maersk
4.3
₹ 20 L/yr - ₹ 28 L/yr
Pune
Senior Engineer (Planning) 6-8 years
Shapoorji Pallonji Group
4.2
Raipur

Q9. How to calculate number of tiles

Ans.

Number of tiles can be calculated by determining the area to be covered and the size of each tile.

  • Calculate the total area to be covered by multiplying the length and width of the space.

  • Determine the size of each tile in square units.

  • Divide the total area by the size of each tile to get the number of tiles needed.

  • Consider adding extra tiles for cuts and wastage.

  • For example, if a room is 10 feet by 12 feet and each tile is 1 square foot, you would need 120 tiles.

Q10. How to calculate weight of steel

Ans.

Weight of steel can be calculated by multiplying the volume of steel by its density.

  • Calculate the volume of steel (length x width x height)

  • Determine the density of the specific type of steel being used

  • Multiply the volume by the density to get the weight

  • Example: Weight of a steel plate with dimensions 2m x 1m x 0.1m and density of 7850 kg/m^3 would be 2 x 1 x 0.1 x 7850 = 1570 kg

Q11. how many cavities are there

Ans.

The question is unclear and lacks context. Please provide more information.

  • Please provide more context or specify what type of cavities you are referring to.

  • Are you asking about cavities in a building or in a human body?

  • Without more information, it is impossible to answer this question accurately.

Q12. How many types of gate

Ans.

There are several types of gates used in construction projects.

  • Swing gate

  • Sliding gate

  • Rolling gate

  • Barrier gate

  • Turnstile gate

  • Vertical pivot gate

  • Bi-folding gate

  • Cantilever gate

Q13. How many plastic material

Ans.

The question is unclear and lacks context. Please provide more information.

  • Please clarify the context of the question.

  • Are you asking about the types of plastic materials available?

  • Or are you asking about the quantity of plastic materials needed for a project?

  • Without more information, it is difficult to provide a specific answer.

Q14. how to do Progress payment

Ans.

Progress payment is a payment made to a contractor based on the percentage of work completed.

  • Determine the percentage of work completed

  • Agree on the payment schedule with the contractor

  • Verify the work completed before making the payment

  • Ensure the payment is made on time to avoid delays

  • Keep accurate records of progress payments made

Q15. Explain the piping iso drawings

Ans.

Piping iso drawings are detailed engineering drawings that show the layout of piping systems in a plant or facility.

  • Piping iso drawings provide a detailed view of the piping system, including the size and type of pipes, valves, fittings, and other components.

  • They are used by engineers and designers to plan and design piping systems, and by construction and maintenance teams to install and maintain the system.

  • The drawings are typically created using computer-aided design (CAD)...read more

Q16. Path enterprise structure one by one

Ans.

Path enterprise structure involves defining the hierarchy of business units, departments, and reporting relationships within an organization.

  • Start with the top-level entity, usually the company or organization itself

  • Identify the major divisions or business units within the organization

  • Break down each division into departments or functional areas

  • Establish reporting relationships between different levels of the structure

  • Consider any subsidiaries or affiliated entities that are ...read more

Q17. What is baseline schedule

Ans.

Baseline schedule is the original project schedule used as a reference point for comparison.

  • Baseline schedule is the initial approved project schedule that serves as a benchmark for measuring project progress.

  • It includes the planned start and finish dates for project activities, milestones, and deliverables.

  • Any changes to the schedule must be compared against the baseline schedule to assess impact.

  • Baseline schedule helps in tracking deviations, identifying delays, and managin...read more

Q18. What is critical path

Ans.

Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.

  • Critical path helps in identifying the tasks that are crucial for the project timeline.

  • It determines the shortest possible duration for completing the project.

  • Any delay in tasks on the critical path will directly impact the project's overall timeline.

  • Activities on the critical path have zero slack or float.

  • Example: In a construction project, ta...read more

Q19. what is WBS

Ans.

WBS stands for Work Breakdown Structure, a hierarchical decomposition of project deliverables into smaller, manageable components.

  • WBS is a tool used in project management to organize and define the scope of a project

  • It breaks down the project into smaller, more manageable components

  • Each component is then assigned a unique identifier and can be further broken down into smaller components

  • WBS helps in estimating project costs, scheduling, and resource allocation

  • Example: WBS for ...read more

Q20. What's of sap mm ?

Ans.

SAP MM stands for Materials Management, a module in SAP ERP system that manages procurement and inventory functions.

  • SAP MM helps in managing materials procurement, inventory management, and invoice verification processes.

  • It integrates with other modules like SAP SD (Sales and Distribution) and SAP PP (Production Planning).

  • SAP MM streamlines the procurement process by automating purchase orders, goods receipt, and invoice verification.

  • It helps in optimizing inventory levels an...read more

Q21. What is torque?

Ans.

Torque is a measure of the rotational force applied to an object.

  • Torque is calculated by multiplying the force applied by the distance from the axis of rotation.

  • It is measured in units of force times distance, such as Newton-meters (Nm) or foot-pounds (ft-lb).

  • Torque is essential in determining the ability of a force to rotate an object.

  • Examples of torque include tightening a bolt with a wrench or opening a door with a handle.

Q22. Role of planning engineer

Ans.

Planning engineers are responsible for creating project schedules, monitoring progress, and ensuring timely completion.

  • Develop project schedules using software like Primavera P6

  • Monitor project progress and identify potential delays

  • Coordinate with various teams to ensure timely completion

  • Prepare reports on project status and communicate with stakeholders

  • Implement changes to the schedule as needed to keep the project on track

Q23. Baselines in Primavera?

Ans.

Baselines in Primavera are snapshots of the project schedule at a specific point in time, used for comparison and tracking progress.

  • Baselines capture the original project plan before any changes are made.

  • They are used as a reference point to compare actual progress against planned progress.

  • Baselines help in identifying deviations from the original plan and taking corrective actions.

  • In Primavera, baselines can be created for the entire project or specific activities.

  • They are e...read more

Q24. What is lead time

Ans.

Lead time is the amount of time it takes for a process to be completed from start to finish.

  • Lead time includes all the time spent on a task, including waiting time, processing time, and transportation time.

  • It is important in project management to accurately estimate lead times to ensure projects are completed on time.

  • For example, in construction, lead time may include the time it takes to order materials, receive them, and complete the project.

Q25. Density of steel

Ans.

Density of steel is approximately 7.85 g/cm^3.

  • The density of steel is commonly expressed in grams per cubic centimeter (g/cm^3).

  • The density of steel is approximately 7.85 g/cm^3.

  • Different types of steel may have slightly different densities.

Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

3.9
 • 122 Interviews
3.9
 • 53 Interviews
4.3
 • 18 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Planning Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter