Lifting and Rigging Supervisor
Lifting and Rigging Supervisor Interview Questions and Answers
Q1. 1. What is the lifting plan 2.how many types of lifting 3.what is a critical lift 4.what is a tandan lifting
A lifting plan is a detailed document that outlines the steps and precautions for safely lifting and rigging heavy loads.
A lifting plan includes information such as load weight, lifting equipment to be used, rigging configuration, and safety measures.
There are several types of lifting, including overhead lifting, crane lifting, forklift lifting, and manual lifting.
A critical lift is a lift that has a higher risk due to factors such as load weight, load stability, limited acce...read more
Q2. What is a safety factor What is a rigging stadey
A safety factor is a ratio used to determine the maximum load that can be safely applied to a structure or equipment. A rigging stadey is a device used to support and stabilize a load during lifting operations.
Safety factor is calculated by dividing the maximum load that a structure or equipment can handle by the actual load that will be applied.
The higher the safety factor, the more margin of safety there is in the lifting operation.
A rigging stadey is typically used in conj...read more
Lifting and Rigging Supervisor Jobs
0Interview Questions of Similar Designations
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month