Q1. What things we have check to of the power transformer before placing on foundation
Before placing a power transformer on foundation, we need to check several things.
Check the transformer's weight and ensure that the foundation can support it
Inspect the transformer for any damage during transportation
Check the oil level and quality
Verify the electrical connections and grounding
Ensure that the transformer is properly aligned on the foundation
Perform insulation resistance tests
Check the cooling system
Verify that all safety devices are in place and functioning ...read more
Q2. Which type substation you have constructed
We have constructed a 220 kV outdoor substation.
The substation is designed to receive power from the transmission grid and distribute it to the local distribution network.
It includes transformers, circuit breakers, disconnect switches, and other equipment.
The substation is located in an open area and is designed to withstand harsh weather conditions.
We followed all safety regulations and guidelines during the construction process.
The substation was commissioned and tested bef...read more
Q3. Switchyard erection activities
Switchyard erection activities involve the installation of electrical equipment and structures for power transmission and distribution.
Clearing and grading the site
Excavating and pouring foundations for equipment
Installing transformers, switchgear, and other electrical equipment
Erecting support structures for overhead transmission lines
Laying underground cables and conduits
Testing and commissioning the switchyard
Ensuring compliance with safety and environmental regulations
Q4. Earthing of switchyard
Earthing of switchyard is essential for safety and proper functioning of electrical equipment.
Earthing provides a low resistance path for fault current to flow, preventing electrical shocks and damage to equipment.
The switchyard should be connected to a grounding grid, which is designed to handle the maximum fault current that can occur.
The grounding grid should be regularly tested to ensure its effectiveness.
All metallic parts of the switchyard, including fences and structur...read more
Electrical Construction Manager Jobs
0Interview Questions of Similar Designations
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month