Q1. What things we have check to of the power transformer before placing on foundation

Ans.

Before placing a power transformer on foundation, we need to check several things.

  • Check the transformer's weight and ensure that the foundation can support it

  • Inspect the transformer for any damage during transportation

  • Check the oil level and quality

  • Verify the electrical connections and grounding

  • Ensure that the transformer is properly aligned on the foundation

  • Perform insulation resistance tests

  • Check the cooling system

  • Verify that all safety devices are in place and functioning ...read more

Q2. Which type substation you have constructed

Ans.

We have constructed a 220 kV outdoor substation.

  • The substation is designed to receive power from the transmission grid and distribute it to the local distribution network.

  • It includes transformers, circuit breakers, disconnect switches, and other equipment.

  • The substation is located in an open area and is designed to withstand harsh weather conditions.

  • We followed all safety regulations and guidelines during the construction process.

  • The substation was commissioned and tested bef...read more

Q3. Switchyard erection activities

Ans.

Switchyard erection activities involve the installation of electrical equipment and structures for power transmission and distribution.

  • Clearing and grading the site

  • Excavating and pouring foundations for equipment

  • Installing transformers, switchgear, and other electrical equipment

  • Erecting support structures for overhead transmission lines

  • Laying underground cables and conduits

  • Testing and commissioning the switchyard

  • Ensuring compliance with safety and environmental regulations

Q4. Earthing of switchyard

Ans.

Earthing of switchyard is essential for safety and proper functioning of electrical equipment.

  • Earthing provides a low resistance path for fault current to flow, preventing electrical shocks and damage to equipment.

  • The switchyard should be connected to a grounding grid, which is designed to handle the maximum fault current that can occur.

  • The grounding grid should be regularly tested to ensure its effectiveness.

  • All metallic parts of the switchyard, including fences and structur...read more

Electrical Construction Manager Jobs

0
Are these interview questions helpful?
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

3.9
 • 32 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Electrical Construction Manager Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter