Purpose of the Role Incoming Inspection of Fabrication Items at Vendor RRL End
Key Metrics of the Role
Transformer Knowledge Good knowledge in fabrication material inspection(Tank, Frame Enclosure) Familier with reading of drawings Good in visual inspection and identify defects Good knowledge of tank welding inspection Good knowledge of tank painting process inspection Knowledge of DP Testing (NDT Level II) Good knowledge of WPS, PQR WPQ Problem solving Good knowledge of 8D analysis of rejection Good knowledge of Excel Good knowledge of painting as per standard ISO12944 Good knowledge of Kaizen, Poka yoke OPL Collaborative
Key Deliverables
Should attend customer stage inspection call and ensure on time closer Inspection of fabrication material as per plan within 1 day (Tank, Frame Enclosure) Resolve daily inspection points at vendor end and closure with analysis Identification implementation of OPL Kaizens Poka yoke based on past defects at each fabrication vendor Keeping track of vendor end inspection Keeping track of kaizen, OPL Poka yoke Daily track report of vendor end inspection point closures RRPL end shop floor NC resolution closure with 8D analysis Conducting witnessing WPS, PQR WPQ painting qualifications with all suppliers Reduction in rework due to fabrication quality at RRPL Fabrication vendor audits as per plan closure in oracle Portal