Filter interviews by
I applied via Campus Placement and was interviewed in May 2024. There was 1 interview round.
Online aptitude test
Top trending discussions
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
There are various types of engines, including internal combustion, electric, and hybrid engines.
Internal combustion engines are the most common and include gasoline and diesel engines.
Electric engines use electricity to power the vehicle and are becoming more popular.
Hybrid engines combine both internal combustion and electric power.
Other types of engines include rotary engines and steam engines.
The type of engine used...
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
I appeared for an interview before Mar 2024, where I was asked the following questions.
I have experience in business development through internships and projects, focusing on market research and client engagement.
Conducted market research to identify potential clients and industry trends, leading to a 15% increase in lead generation.
Collaborated with the sales team to develop tailored proposals for clients, resulting in a 20% increase in conversion rates.
Participated in networking events to build relatio...
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 6 interview rounds.
Introduction and few case study intraction with MD sir
I applied via Walk-in and was interviewed before Nov 2023. There were 2 interview rounds.
Asking about what im studied
Asked a question relate to my graduate
I applied via Job Portal
I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.
Siemens plc models include S7-1200, S7-1500, S7-300, S7-400, and LOGO!
S7-1200
S7-1500
S7-300
S7-400
LOGO!
SPC stands for Statistical Process Control, a method used to monitor and control processes to ensure they are operating efficiently and within specifications.
SPC involves collecting and analyzing data to identify variations in a process
It helps in detecting and correcting issues before they result in defects
Common tools used in SPC include control charts, histograms, and Pareto charts
To configure a dp dp coupler, set the parameters for communication protocol, baud rate, address, and data format.
Set the communication protocol to match the devices being connected.
Configure the baud rate to ensure proper data transmission speed.
Assign a unique address to the dp dp coupler for identification.
Choose the appropriate data format for the connected devices.
Test the configuration to ensure proper communicati
based on 1 interview
Interview experience
Junior Engineer
150
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
Assistant Engineer
139
salaries
| ₹3.6 L/yr - ₹6.5 L/yr |
Lead Engineer
99
salaries
| ₹8.2 L/yr - ₹28 L/yr |
Senior Software Engineer
70
salaries
| ₹10.2 L/yr - ₹31 L/yr |
Deputy Engineer
57
salaries
| ₹5 L/yr - ₹9 L/yr |
JK Tyres
Faurecia
Hitachi Astemo
Valeo