SCADA stands for Supervisory Control and Data Acquisition system, used to monitor and control industrial processes.
SCADA systems are used in various industries such as power plants, water treatment facilities, and manufacturing plants.
They consist of remote terminal units (RTUs) or programmable logic controllers (PLCs) that communicate with a central computer system.
SCADA systems provide real-time data, alarms, and con...
I came to know about visvaraj environment Pvt ltd through a job posting on a job portal.
I found a job posting for Assistant Electrical Manager position on a job portal.
I researched about visvaraj environment Pvt ltd after seeing the job posting.
I read about the company's services and projects on their official website.
I checked reviews and ratings of the company on Glassdoor or other platforms.
Top trending discussions
posted on 28 Sep 2021
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
Marketing is about creating demand while sales is about fulfilling demand. I prefer both as they are interdependent.
Marketing involves creating brand awareness, identifying target audience, and promoting products/services through various channels.
Sales involves converting leads into customers, negotiating deals, and closing sales.
Marketing and sales are interdependent as marketing creates demand and sales fulfills it.
A...
posted on 7 Dec 2022
I applied via Approached by Company and was interviewed before Dec 2021. There were 3 interview rounds.
posted on 26 Oct 2024
I appeared for an interview before Oct 2023.
posted on 23 Oct 2024
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
To arrest leakages, identify the source, implement preventive measures, monitor regularly, and take corrective actions.
Identify the source of leakages through regular audits and inspections.
Implement preventive measures such as installing leak detection systems or improving maintenance procedures.
Monitor regularly by analyzing data and conducting spot checks.
Take corrective actions promptly to fix leaks and prevent fut
Grouting methods include cementitious grouting, chemical grouting, and pressure grouting.
Cementitious grouting involves mixing cement, water, and additives to create a flowable material for filling gaps.
Chemical grouting uses chemical compounds to fill voids and stabilize soil or rock formations.
Pressure grouting injects grout under pressure to fill cracks and voids in structures.
Examples: epoxy grouting, urethane grou
Approximately 500 cubic yards of concrete were consumed in the last project.
The amount of concrete consumed in a project can vary depending on the size and scope of the project.
Factors such as the type of structure being built, the design specifications, and the location can all impact the amount of concrete needed.
For example, a small residential project may only require a few cubic yards of concrete, while a large co...
posted on 29 Sep 2022
I applied via Naukri.com and was interviewed before Aug 2020. There was 1 interview round.
RO (Reverse Osmosis) is a water purification process that uses a semipermeable membrane to remove ions, molecules, and larger particles from drinking water.
RO process involves the use of a high-pressure pump to force water through a semipermeable membrane.
The membrane allows water molecules to pass through while blocking impurities.
RO can remove contaminants like dissolved salts, bacteria, viruses, and heavy metals fro...
ACF stands for AutoCAD Civil 3D Feature. It is used for creating and managing design elements in civil engineering projects.
ACF is a tool in AutoCAD Civil 3D software.
It allows site engineers to create and manage design elements such as roads, intersections, and grading.
ACF helps in generating accurate 3D models of the site, including surfaces, alignments, and profiles.
It enables engineers to analyze and optimize desig...
I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.
I applied via Company Website and was interviewed in May 2021. There were 3 interview rounds.
VCB and ACB transformers require regular maintenance to ensure optimal performance and prevent breakdowns.
Regular inspection of the transformer and its components
Cleaning of the transformer and its components
Checking and tightening of connections
Testing of protective devices
Replacement of worn out or damaged parts
Regular oil analysis
Following manufacturer's recommended maintenance schedule
Training of personnel on prope
posted on 16 Jun 2024
I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.
based on 1 interview
Interview experience
Assistant Manager
57
salaries
| ₹6 L/yr - ₹13.8 L/yr |
Senior Engineer
48
salaries
| ₹4.8 L/yr - ₹9.1 L/yr |
Manager
31
salaries
| ₹5.6 L/yr - ₹13.8 L/yr |
Asst Store
25
salaries
| ₹1.9 L/yr - ₹3.8 L/yr |
Civil Engineer
22
salaries
| ₹2.3 L/yr - ₹6.5 L/yr |
Ion Exchange India
Re Sustainability Limited
DuPont
VA Tech Wabag