Pumps and aerators are used to move fluids and gases respectively.
Pumps work by creating a pressure difference to move fluids from one place to another.
Aerators introduce air into liquids to increase oxygen levels and promote biological processes.
Types of pumps include centrifugal, positive displacement, and jet pumps.
Types of aerators include surface aerators, diffused aerators, and mechanical aerators.
I appeared for an interview before Feb 2021.
I applied via Naukri.com and was interviewed in Feb 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.
DM Plant removes impurities like salts and minerals from water using ion exchange process.
DM Plant stands for Demineralization Plant.
It uses ion exchange process to remove impurities like salts and minerals from water.
It consists of cation exchange resin and anion exchange resin columns.
Cations and anions in water are exchanged with hydrogen and hydroxyl ions in the resins.
The treated water is then passed through mixed...
I applied via Company Website and was interviewed in Jun 2024. There were 2 interview rounds.
One fault occurs in electrical panel fure same fault preventive action
Power generation involves converting mechanical energy into electrical energy using generators, which is then transmitted through power lines to reach consumers.
Power generation involves using generators to convert mechanical energy (from sources like turbines, windmills, or water wheels) into electrical energy
Generators produce electricity by rotating a coil of wire within a magnetic field, creating an electric curren...
I applied via Naukri.com and was interviewed in Mar 2021. There were 5 interview rounds.
I applied via Walk-in and was interviewed in Aug 2022. There was 1 interview round.
Precommissioning tests of transformers are essential to ensure their proper functioning.
Insulation resistance test
Turns ratio test
Vector group test
Winding resistance test
Magnetizing current test
No-load loss and excitation current test
Load loss and impedance voltage test
I applied via Company Website and was interviewed in May 2021. There were 3 interview rounds.
VCB and ACB transformers require regular maintenance to ensure optimal performance and prevent breakdowns.
Regular inspection of the transformer and its components
Cleaning of the transformer and its components
Checking and tightening of connections
Testing of protective devices
Replacement of worn out or damaged parts
Regular oil analysis
Following manufacturer's recommended maintenance schedule
Training of personnel on prope
Design Engineer
83
salaries
| ₹3 L/yr - ₹8.8 L/yr |
Senior Engineer
82
salaries
| ₹5.3 L/yr - ₹19.1 L/yr |
Senior Design Engineer
53
salaries
| ₹5 L/yr - ₹9.5 L/yr |
Assistant Manager
51
salaries
| ₹7 L/yr - ₹19.1 L/yr |
Lead Engineer
51
salaries
| ₹7.5 L/yr - ₹26.2 L/yr |
Ion Exchange India
Re Sustainability Limited
DuPont
VA Tech Wabag