Filter interviews by
Seeking new challenges and opportunities for growth in a different environment.
Looking for new challenges and opportunities for growth
Interested in working with new technologies or industries
Seeking a better work-life balance or location
Wanting to expand skill set or take on more responsibilities
The 5 core tools are a set of quality management tools used in process improvement.
1. Process Flowchart: Visual representation of the steps in a process.
2. Cause and Effect Diagram (Fishbone Diagram): Identifies potential causes of a problem.
3. Check Sheet: Used to collect and analyze data in real-time.
4. Pareto Chart: Displays the frequency of problems or causes in descending order.
5. Scatter Diagram: Shows the relati
Top trending discussions
posted on 14 Aug 2022
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.
I was interviewed in Dec 2024.
posted on 25 Sep 2024
I applied via Naukri.com and was interviewed in Aug 2024. There were 3 interview rounds.
2022 Bsc. And de pharma
2022 BSc.. And De pharma running.
I applied via Walk-in and was interviewed in Sep 2024. There was 1 interview round.
Quality inspection is the process of checking products or services to ensure they meet specified requirements. CCL process stands for Critical Control Limits process.
Quality inspection involves examining products or services to ensure they meet quality standards and specifications.
CCL process refers to setting critical control limits to monitor and control the quality of products or services.
Quality inspectors use vari...
Quality CCL line hazards and safety refer to potential risks and precautions in the production process of copper-clad laminates.
Identifying and mitigating electrical hazards such as short circuits and electrical shocks
Ensuring proper ventilation to prevent exposure to harmful chemicals during the manufacturing process
Implementing safety protocols for handling heavy machinery and equipment
Regular maintenance of equipmen...
CCL coating process involves applying a conductive layer to a substrate for use in electronic components.
CCL stands for Copper Clad Laminate.
The coating process typically involves cleaning the substrate, applying a layer of copper, and then etching away excess copper to create circuit patterns.
The conductive layer helps in the transmission of electrical signals in electronic devices.
Examples of CCL coating processes in...
I was interviewed in Dec 2024.
Cqualiollege project base
Production issue of material holes could be due to manufacturing defects, improper handling, or design flaws.
Possible manufacturing defects in the material causing holes
Improper handling during production leading to holes in the material
Design flaws in the production process resulting in material holes
Issues with materials are solved by identifying root causes, implementing corrective actions, and conducting thorough testing.
Identify the root cause of the issue with the material
Implement corrective actions to address the root cause
Conduct thorough testing to ensure the issue is resolved
Document the process and lessons learned for future reference
Interview experience
Production Engineer
6
salaries
| ₹3.5 L/yr - ₹4.6 L/yr |
Quality Executive
5
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Chief Operating Officer
5
salaries
| ₹10 L/yr - ₹29.7 L/yr |
Machine Operator
4
salaries
| ₹1.8 L/yr - ₹1.8 L/yr |
Assistant Manager Maintenance
4
salaries
| ₹4.8 L/yr - ₹6.2 L/yr |
Tata Motors
Maruti Suzuki
Asian Paints
Samsung