Filter interviews by
I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.
Planning of materials involves forecasting, procurement, and inventory management.
Forecasting demand for materials based on production schedules and sales forecasts
Procuring materials from approved suppliers at competitive prices
Managing inventory levels to ensure availability of materials while minimizing excess stock
Collaborating with production and logistics teams to ensure timely delivery of materials
Implementing s...
Top trending discussions
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I appeared for an interview in Jan 2025.
Gravimetric mode is a method of analysis that measures the mass of a substance to determine its concentration or purity.
Gravimetric mode involves measuring the mass of a sample before and after a chemical reaction to determine the amount of a specific component present.
It is commonly used in analytical chemistry to determine the concentration of a particular element or compound in a sample.
Examples include gravimetric ...
I appeared for an interview in Aug 2024.
Six Sigma is a data-driven methodology for improving processes by reducing defects and variation.
Six Sigma aims to achieve near-perfect quality by identifying and eliminating causes of defects or errors.
It uses statistical tools and techniques to measure and analyze process performance.
The goal of Six Sigma is to reduce variation and improve efficiency, ultimately leading to cost savings and customer satisfaction.
Compa...
Implemented a kaizen to streamline production process, reducing lead time by 20%.
Identified bottlenecks in the production process
Implemented visual management tools to track progress
Trained team members on new processes and best practices
Absenteeism and attrition can be controlled through various strategies such as improving work culture, offering competitive benefits, and providing opportunities for growth.
Improve work culture by promoting work-life balance and creating a positive work environment.
Offer competitive benefits such as health insurance, flexible work hours, and performance bonuses.
Provide opportunities for growth and development through t...
The OE Calculation Formula is used to determine the efficiency of a process or system.
OE (Overall Equipment) = (Operating Time - Downtime) / Operating Time
Operating Time is the total time the equipment is available for production.
Downtime is the total time the equipment is not available for production.
OE value ranges from 0 to 1, with 1 indicating perfect efficiency.
Example: OE = (500 hours - 50 hours) / 500 hours = 0.
I applied via Referral and was interviewed in Mar 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jul 2022. There were 2 interview rounds.
NPD process stands for New Product Development process, which is a systematic approach to bringing a new product to market.
Idea generation and screening
Concept development and testing
Business analysis
Product development
Test marketing
Commercialization
P2P cycle stands for Procure to Pay cycle, which is the process of obtaining goods or services from a supplier and paying for them.
P2P cycle involves requisitioning, purchasing, receiving, and paying for goods or services.
It starts with a purchase requisition, followed by supplier selection, purchase order creation, goods receipt, invoice verification, and payment processing.
Efficient P2P cycle management helps in cont...
The process of PCB development involves designing the circuit, selecting components, creating the layout, prototyping, testing, and final production.
Designing the circuit based on the requirements and functionality
Selecting components such as resistors, capacitors, and integrated circuits
Creating the layout using software like Altium Designer or Eagle
Prototyping the PCB to test its functionality and performance
Testing ...
Wire harness development involves designing, prototyping, testing, and manufacturing electrical wiring systems for various applications.
Designing the wire harness layout based on the electrical requirements and space constraints
Prototyping the wire harness to ensure proper fit and functionality
Testing the wire harness for electrical continuity, insulation resistance, and durability
Manufacturing the wire harness using a...
Accountant
5
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Shift Engineer
5
salaries
| ₹4.2 L/yr - ₹6 L/yr |
Assistant Manager
4
salaries
| ₹3 L/yr - ₹6.2 L/yr |
Assistant Engineer
4
salaries
| ₹5 L/yr - ₹5.9 L/yr |
Senior Instrumentation Technician
4
salaries
| ₹3 L/yr - ₹3.2 L/yr |
Hero Motors Company
Bajaj Motors
Knorr-Bremse
Astral Adhesives