Filter interviews by
I applied via Naukri.com and was interviewed in Aug 2021. There were 3 interview rounds.
Arbitration in FlexRay is a process of selecting the message with the highest priority to be transmitted on the bus.
FlexRay uses a time-triggered communication protocol
Each message has a unique identifier and priority level
The bus controller selects the message with the highest priority to be transmitted
If two or more messages have the same priority, the bus controller uses a round-robin algorithm to select the next me...
Bus off is a state where a node on the bus is disconnected due to an error. It needs to be created and tested.
Creating bus off involves simulating an error condition on a node, such as a communication timeout or a hardware failure.
Testing bus off involves verifying that the other nodes on the bus detect the error and continue to function properly.
Bus off can be tested using a simulation tool or by physically disconnect...
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Feb 2024. There was 1 interview round.
Software Engineer
19
salaries
| ₹5.6 L/yr - ₹15.5 L/yr |
Technical Support Engineer
9
salaries
| ₹5.8 L/yr - ₹16.5 L/yr |
Senior Product Engineer
7
salaries
| ₹18.9 L/yr - ₹23 L/yr |
Engineer
6
salaries
| ₹5.2 L/yr - ₹17.4 L/yr |
Senior Software Engineer
6
salaries
| ₹12 L/yr - ₹28 L/yr |
ITC
Godrej Industries Group
Reliance Industries
Tata Group