Filter interviews by
Be the first one to contribute and help others!
I applied via Walk-in and was interviewed before May 2021. There were 4 interview rounds.
Group discussed on Di
scipline spelling topic and explain
I applied via Campus Placement and was interviewed before Jun 2020. There was 1 interview round.
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
The unit of current is Ampere (A).
The unit of current is a measure of the flow of electric charge.
It represents the rate at which electric charges pass through a given point in a circuit.
Current is measured using an ammeter.
The SI unit for current is Ampere (A).
The question is not relevant to the job position of Process Engineer.
The question is not related to the job responsibilities of a Process Engineer.
The amount of electricity available in a house is not relevant to the job.
The question may be better suited for an electrician or energy specialist.
I applied via Referral and was interviewed in Jun 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Dec 2023. There was 1 interview round.
About past experience
posted on 15 May 2023
I was interviewed before May 2022.
Pressure die casting is a metal casting process where molten metal is injected into a mold cavity under high pressure.
Molten metal is injected into a mold cavity under high pressure
The mold cavity is created using two hardened tool steel dies
The process is used to produce high volume, complex metal parts with tight tolerances
Commonly used for manufacturing automotive parts, electronic housings, and appliance parts
posted on 12 Jul 2024
I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.
The new product development process involves identifying opportunities, generating ideas, testing concepts, and launching the product.
Market research to identify opportunities
Idea generation through brainstorming sessions
Concept testing with focus groups
Prototype development and testing
Product launch and marketing
PPAP documents list the necessary documentation for production part approval process.
PPAP documents include dimensional results, material certifications, process flow diagrams, control plans, etc.
PPAP documents are required to ensure that the production process meets customer requirements.
Examples of PPAP documents: PSW (Part Submission Warrant), PFMEA (Process Failure Mode and Effects Analysis), MSA (Measurement Syste
I will handle subordinates with clear communication, setting expectations, providing support, and offering constructive feedback.
Establish clear expectations and goals for each team member
Communicate openly and regularly with subordinates
Provide necessary support and resources for their success
Offer constructive feedback and guidance for improvement
Address any issues or conflicts promptly and professionally
posted on 17 May 2024
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
posted on 19 Oct 2021
I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.
UNO Minda
Bharat Forge
Endurance Technologies
Sundaram Clayton