i
Varroc
Group
Filter interviews by
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns and improving overall equipment efficiency.
The pillars of TPM include autonomous maintenance, planned maintenance, quality maintenance, focused improvement, early equipment management, and training and education.
For example, autonomous maintenance ...
Production planning involves creating a flow diagram to represent the sequence of activities.
Identify the key steps in the production process
Determine the order in which the steps need to be completed
Map out the flow of materials and resources throughout the process
Consider potential bottlenecks and ways to optimize the flow
Use tools like Gantt charts or process mapping software to create a visual representation
Handle with empathy, prioritize their needs, communicate effectively, involve appropriate resources
Show empathy and compassion towards the customer
Prioritize their needs and address any urgent issues first
Communicate effectively and clearly with the customer about their condition and the steps being taken to help them
Involve appropriate resources such as medical professionals or support staff as needed
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
Improving communication and personality requires self-awareness, active listening, and continuous learning.
Practice active listening to understand others' perspectives
Be aware of your own communication style and adjust as needed
Seek feedback and be open to constructive criticism
Read books or take courses on communication and interpersonal skills
Practice empathy and emotional intelligence
Be respectful and courteous in a...
I can demonstrate my potential through proactive problem-solving, leadership, and continuous learning in engineering projects.
Proactively identify and solve complex engineering problems, like optimizing a production process that increased efficiency by 20%.
Lead cross-functional teams in projects, such as spearheading a software development initiative that delivered a product ahead of schedule.
Engage in continuous learn...
First impressions can be shown through body language, attire, and communication skills.
Body language can convey confidence or nervousness
Attire can show professionalism or lack thereof
Communication skills can demonstrate intelligence and articulation
Eye contact and a firm handshake can also make a positive impression
I applied via Recruitment Consultant and was interviewed in Jan 2020. There were 3 interview rounds.
MHr stands for Man-Hour. Costing is done by calculating the total number of man-hours required for a task and multiplying it by the cost per hour.
MHr stands for Man-Hour, which is a unit of measurement for the amount of work performed by an individual in one hour.
Costing is done by determining the total number of man-hours required for a specific task or project.
The cost per hour is then multiplied by the total number ...
I do not have the current pricing information for ADC 12 & plastic resins.
I apologize, but I do not have the current pricing information for ADC 12 & plastic resins.
I would need to conduct research or consult with a colleague who has access to this information.
Pricing for these materials can fluctuate frequently based on market demand and other factors.
Costing of plastic and casting parts involves analyzing material costs, production processes, and overhead expenses.
Analyze the material costs by considering the type and quantity of plastic or casting material required.
Evaluate the production processes involved in manufacturing the parts, including molding or casting techniques.
Consider the labor costs, machine costs, and energy costs associated with the production pr...
To determine the machine and tool cost for a plastic part.
Analyze the dimensions and material of the plastic part
Identify the required tolerances and surface finish
Consider the production volume and lead time
Research the available machines and their capabilities
Calculate the tooling cost based on the chosen machine
Consider the maintenance and operating costs of the machine
I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.
The types of lacquer used on lens and housing include acrylic lacquer, polyurethane lacquer, and epoxy lacquer.
Acrylic lacquer is commonly used on lens and housing due to its high transparency and UV resistance.
Polyurethane lacquer provides excellent durability and chemical resistance, making it suitable for lens and housing.
Epoxy lacquer offers superior adhesion and impact resistance, making it a preferred choice for ...
A size fine filter is a type of filter used to remove small particles or impurities from a fluid or gas.
Size fine filters are commonly used in industries such as manufacturing, pharmaceuticals, and food processing.
They are designed to capture particles that are smaller than what can be filtered by regular filters.
These filters can be made of various materials such as paper, fabric, or synthetic fibers.
Examples of size ...
Direct metalizing is applicable on materials that can conduct electricity.
Direct metalizing is a process of coating a non-metallic surface with a thin layer of metal.
The material should be able to conduct electricity for direct metalizing to be applicable.
Materials like plastic, glass, and ceramics can be direct metalized.
Direct metalizing is commonly used in the automotive, aerospace, and electronics industries.
The amount of UV energy required for curing depends on the type of material being cured and the intensity of the UV light.
UV energy required for curing varies depending on the material being cured
Intensity of the UV light also affects the amount of energy required
UV energy is typically measured in Joules per square centimeter (J/cm²)
Examples of materials that require UV curing include adhesives, coatings, and inks
The amount of DFT required as per standard varies depending on the specific industry and project requirements.
The required amount of DFT (Design for Testability) is determined by industry standards and project specifications.
Different industries may have different standards for DFT.
The complexity and size of the project also influence the amount of DFT required.
DFT techniques include scan chains, built-in self-test (BI...
I applied via Naukri.com and was interviewed before Jan 2022. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.
The latest version of PPAP is PPAP 4th Edition.
PPAP stands for Production Part Approval Process.
The 4th Edition of PPAP was released in 2006.
It is a standardized process in the automotive industry to ensure that suppliers meet the requirements for production parts.
PPAP includes documentation such as design records, engineering change documents, and control plans.
It also involves conducting various tests and measurement...
FMEA is a method used during development to identify and mitigate potential failures in a system or process.
FMEA stands for Failure Mode and Effects Analysis.
It is a systematic approach to identify and prioritize potential failures in a system or process.
FMEA helps in understanding the potential causes and effects of failures.
It is used to assess the severity, occurrence, and detectability of failures.
By analyzing fail...
DVP&R stands for Design Verification Plan and Report. It is a process used to ensure that a product meets its design specifications.
DVP&R is a structured approach to testing and validating a product's design.
It involves creating a plan for testing the product, executing the tests, and documenting the results.
The plan includes details such as the test objectives, test methods, acceptance criteria, and test schedule.
The ...
NDC stands for National Drug Code. It is a unique identifier for drugs in the United States.
NDC is a 10-digit code that identifies drugs, including prescription and over-the-counter medications.
The first segment of the NDC represents the labeler code, which identifies the manufacturer or distributor of the drug.
The second segment represents the product code, which identifies the specific drug formulation and strength.
T...
PPAP file making is done during the production validation stage of NPD work.
PPAP file making is a part of the production validation process in NPD work
It involves documenting the production process and ensuring it meets customer requirements
PPAP file making is typically done after the design and development stages
It includes documentation such as control plans, process flow diagrams, and inspection records
The ppm in 6 sigma is 3.4 defects per million opportunities (DPMO).
6 sigma aims for a defect rate of 3.4 DPMO.
PPM stands for parts per million.
DPMO is a measure of process performance.
The lower the DPMO, the better the process performance.
Achieving 6 sigma means having a process that produces 99.99966% defect-free output.
Pareto chart is a problem-solving tool used to identify and prioritize the causes of a problem.
Pareto chart is a bar graph that displays the relative frequency or size of problems in descending order of importance.
It helps to identify the vital few causes that account for the majority of the problems.
It is based on the Pareto principle, also known as the 80/20 rule, which states that 80% of the effects come from 20% of...
I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.
Spares management involves inventory control, procurement, and maintenance planning.
Create a detailed inventory of all spares and their usage frequency.
Establish a procurement process that ensures timely availability of spares.
Implement a maintenance plan that includes regular inspection and replacement of spares.
Use technology such as barcoding and RFID to track spares and prevent loss or theft.
Regularly review and up...
Shift issues can be managed by effective communication, proper scheduling, and providing necessary resources.
Establish clear communication channels between team members and management
Create a schedule that takes into account employee preferences and availability
Ensure that all necessary resources are available for each shift
Regularly review and adjust the schedule as needed
Provide training and support for employees to ...
I appeared for an interview in Aug 2021.
I applied via Naukri.com and was interviewed in Sep 2021. There was 1 interview round.
based on 1 interview experience
Difficulty level
Duration
based on 2 reviews
Rating in categories
Quality Engineer
313
salaries
| ₹1.8 L/yr - ₹5.4 L/yr |
Senior Engineer
260
salaries
| ₹3.8 L/yr - ₹9 L/yr |
Assistant Manager
254
salaries
| ₹6 L/yr - ₹13.1 L/yr |
Production Engineer
236
salaries
| ₹2.5 L/yr - ₹6.5 L/yr |
Engineer
196
salaries
| ₹1.4 L/yr - ₹8.1 L/yr |
JBM Group
Subros
UNO Minda
Apollo Tyres