Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Varroc Group Team. If you also belong to the team, you can get access from here

Varroc Group Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Varroc Group Junior Engineer Production Interview Questions and Answers

Updated 12 Oct 2024

Varroc Group Junior Engineer Production Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Aptitude Test 

Efforts=result system. Target 5s kaizen

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Feb 2024.

Round 1 - Product Management 

(1 Question)

  • Q1. 5S,poka.poka , 3G , 3k, 4M change
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. Technical question
  • Q2. Base information
  • Q3. Salary decision
  • Q4. Safety decision
  • Q5. Transport information

Interview Preparation Tips

Interview preparation tips for other job seekers - No
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Jun 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

Normal questions reasoning

Round 2 - Technical 

(1 Question)

  • Q1. Normal basic question like quniching, materials propertly related questions, carbon daigram
Round 3 - HR 

(1 Question)

  • Q1. Normal family realted question or location relocated
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Poka yoke and tpm Manpower Handling Total Productive Maintenance
  • Q2. Production Approval process Daily production targets report
  • Q3. Poka yoke Bhul se bhi galti se galti na ho paye Total Productive Maintenance
Round 2 - HR 

(1 Question)

  • Q1. Overall equipment E

Interview Preparation Tips

Interview preparation tips for other job seekers - Production Engineer
Tpm
5s
Poka yoke
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(5 Questions)

  • Q1. What factors do you consider when assessing someone's ability to perform a job?
  • Q2. Production timing
  • Q3. Working to operator speeed
  • Q4. Machine problem
  • Q5. Production rejection
Round 2 - Group Discussion 

If you encounter a problem while answering, please consult your friends sitting nearby.

Interview Preparation Tips

Interview preparation tips for other job seekers - Then the correct answer
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Ho no yuvaraj sir no yuvaraj sir
  • Q2. Yuvaraj sir no yuvaraj sir hoo no va paa

Interview Preparation Tips

Interview preparation tips for other job seekers - Oho yuvaraj sir hoo no yuvaraj
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Job Portal and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is fixture and jigs
  • Ans. 

    Fixtures and jigs are tools used in manufacturing to hold and guide workpieces during machining or assembly processes.

    • Fixtures are devices used to securely hold workpieces in place during machining operations

    • Jigs are tools that guide cutting tools or other machinery during operations

    • Fixtures and jigs help ensure accuracy, repeatability, and efficiency in manufacturing processes

    • Examples include drill jigs for guiding dr...

  • Answered by AI
  • Q2. What is preventive maintenance
  • Ans. 

    Preventive maintenance is the practice of regularly inspecting, cleaning, and servicing equipment to prevent breakdowns and prolong its lifespan.

    • Regularly scheduled inspections and maintenance tasks are performed to identify and address potential issues before they become major problems.

    • Examples include changing air filters in HVAC systems, lubricating moving parts in machinery, and checking for leaks in plumbing syste...

  • Answered by AI
Round 2 - Design Test 

(2 Questions)

  • Q1. What is computer aided design
  • Ans. 

    Computer aided design (CAD) is the use of computer software to create, modify, analyze, and optimize designs for various industries.

    • CAD allows engineers and designers to create 2D or 3D models of products or structures.

    • It helps in visualizing and simulating designs before they are physically built.

    • CAD software can be used in industries such as automotive, aerospace, architecture, and manufacturing.

    • Examples of CAD softw

  • Answered by AI
  • Q2. What is computer aided manufacturing
  • Ans. 

    Computer aided manufacturing (CAM) is the use of software to control machine tools and related machinery in the manufacturing of workpieces.

    • CAM software generates toolpaths and instructions for machines to follow during the manufacturing process.

    • CAM systems can be used for various processes such as milling, turning, and laser cutting.

    • CAM helps in automating and optimizing the manufacturing process, leading to increased...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant

Round 1 - Technical 

(2 Questions)

  • Q1. Glass manufacturing process
  • Ans. 

    Glass manufacturing involves melting raw materials, shaping the molten glass, and cooling it to form the final product.

    • Raw materials such as silica sand, soda ash, and limestone are melted in a furnace at high temperatures.

    • The molten glass is then shaped using various techniques like blowing, pressing, or drawing.

    • The shaped glass is cooled slowly in an annealing oven to relieve internal stresses and strengthen the glas...

  • Answered by AI
  • Q2. Glass inspection process
Round 2 - HR 

(2 Questions)

  • Q1. What is salary in your company
  • Q2. Which type experience
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is line balancing?
  • Q2. What is kaizen

Varroc Group Interview FAQs

How many rounds are there in Varroc Group Junior Engineer Production interview?
Varroc Group interview process usually has 1 rounds. The most common rounds in the Varroc Group interview process are Aptitude Test.

Tell us how to improve this page.

Varroc Group Junior Engineer Production Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

JBM Group Interview Questions
4.0
 • 264 Interviews
UNO Minda Interview Questions
4.0
 • 166 Interviews
Subros Interview Questions
3.9
 • 165 Interviews
Spark Minda Interview Questions
3.9
 • 120 Interviews
Hitachi Astemo Interview Questions
4.1
 • 103 Interviews
Gabriel India Interview Questions
4.2
 • 95 Interviews
Krishna Maruti Interview Questions
4.0
 • 92 Interviews
View all

Varroc Group Junior Engineer Production Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

3.0

Skill development

3.0

Work-life balance

3.0

Salary

2.0

Job security

3.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Quality Engineer
316 salaries
unlock blur

₹1.1 L/yr - ₹7.2 L/yr

Senior Engineer
240 salaries
unlock blur

₹2.8 L/yr - ₹9.4 L/yr

Assistant Manager
236 salaries
unlock blur

₹4.6 L/yr - ₹13.9 L/yr

Production Engineer
236 salaries
unlock blur

₹1 L/yr - ₹6.8 L/yr

Maintenance Engineer
163 salaries
unlock blur

₹1.2 L/yr - ₹8.4 L/yr

Explore more salaries
Compare Varroc Group with

Bharat Forge

3.9
Compare

Samvardhana Motherson Group

3.7
Compare

Sundaram Clayton

4.1
Compare

Endurance Technologies

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview