Filter interviews by
I applied via Job Portal
I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 22 Sep 2022
I applied via Approached by Company and was interviewed in Apr 2022. There were 2 interview rounds.
Preventive maintenance is a proactive approach to maintenance that aims to prevent equipment failure before it occurs.
Regularly scheduled inspections and maintenance
Replacing worn or damaged parts before they cause a breakdown
Cleaning and lubricating equipment to prevent wear and tear
Keeping accurate records of maintenance activities
Examples: changing the oil in a car, replacing air filters in HVAC systems, inspecting
SAP PM module is used for managing maintenance activities of an organization.
PM stands for Plant Maintenance
It helps in planning and scheduling maintenance tasks
Tracks equipment and maintenance history
Provides cost analysis and reporting
Integrates with other SAP modules like MM and FI
Example: A manufacturing company can use SAP PM to schedule maintenance of their production equipment
I have handled various utilities equipments including generators, chillers, HVAC systems, and water treatment plants.
Generators: responsible for maintenance and repair of diesel and gas generators
Chillers: handled installation and maintenance of air-cooled and water-cooled chillers
HVAC systems: managed repair and maintenance of heating, ventilation, and air conditioning systems
Water treatment plants: responsible for op...
Bearings are used to reduce friction between two moving parts. There are several types of bearings.
Plain bearings
Rolling element bearings
Jewel bearings
Fluid bearings
Magnetic bearings
I applied via LinkedIn and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 22 Jun 2023
To convert mm to inches, divide the millimeter value by 25.4
1 mm is equal to 0.03937 inches
To convert mm to inches, divide the mm value by 25.4
For example, to convert 50 mm to inches: 50 mm / 25.4 = 1.9685 inches
To calculate percentage, divide the part by the whole and multiply by 100.
To calculate percentage, divide the part by the whole and multiply by 100.
Percentage = (Part / Whole) * 100
Example: If you scored 80 out of 100 in a test, the percentage would be (80 / 100) * 100 = 80%
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Dec 2024. There were 2 interview rounds.
My last company's CTC was $60,000 per year.
My last company offered a competitive salary package of $60,000 per year.
The CTC included base salary, bonuses, and benefits.
I was satisfied with the compensation package at my previous company.
To control manual oil pump and burners, follow proper maintenance procedures, adjust settings as needed, and monitor performance regularly.
Regularly inspect and maintain the oil pump and burners to ensure they are functioning properly
Adjust the settings on the oil pump and burners as needed to achieve the desired output
Monitor the performance of the oil pump and burners regularly to identify any issues or inefficiencie...
To changeover pumps in case of emergency, follow proper shutdown procedures, switch to backup pump, and restart system. For furnace operation, ensure proper ventilation, monitor temperature, and follow safety protocols.
Follow proper shutdown procedures for the affected pump to prevent damage.
Switch to the backup pump to maintain continuous operation.
Restart the system and monitor for any abnormalities or issues.
For fur...
Maintaining glass level involves regular monitoring, proper cleaning, and adjusting as needed.
Regularly check the glass level to ensure it is at the desired level
Clean the glass regularly to prevent build-up or obstruction
Adjust the glass level as needed based on the specific requirements of the system
Use appropriate tools and equipment for maintenance tasks
Train staff on proper maintenance procedures to ensure consist
Shift Engineer
56
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Senior Executive
33
salaries
| ₹3.5 L/yr - ₹8 L/yr |
Assistant Manager
26
salaries
| ₹6.2 L/yr - ₹16.5 L/yr |
Senior Engineer
25
salaries
| ₹5.2 L/yr - ₹9.5 L/yr |
Executive
24
salaries
| ₹2.5 L/yr - ₹8.8 L/yr |
Uflex
EPL Limited
Jindal Poly Films
Hindusthan National Glass