A tack coat is a thin layer of bituminous emulsion applied to an existing surface before the placement of a new layer of asphalt.
Tack coat helps bond the new asphalt layer to the existing surface
It prevents slippage between the two layers
Tack coat improves the overall durability and longevity of the pavement
Common types of tack coat materials include SS-1, CSS-1, and CRS-1
Proper application and curing of tack coat are
The gradient of a road is the slope or incline of the road, while a chamber is a manhole or access point for underground utilities.
Gradient of a road refers to the slope or incline of the road, usually expressed as a percentage or ratio (e.g. 5% gradient)
Chamber is a manhole or access point for underground utilities such as sewer lines or electrical cables
Gradient is a physical characteristic of the road, while a chamb...
Segregation is the act of separating or setting apart different elements or groups based on certain criteria.
Segregation can occur based on factors such as race, gender, religion, or socioeconomic status.
Examples include racial segregation in schools or neighborhoods, gender segregation in certain workplaces or activities, and economic segregation in housing developments.
Segregation can lead to inequality, discriminati...
Workability of concrete refers to its ease of mixing, placing, and compacting without segregation or bleeding.
Workability is influenced by water content, aggregate size and shape, and cement content.
A concrete mix with high workability is easier to place and compact, while a mix with low workability may require more effort.
Workability tests include slump test, flow table test, and Kelly ball test.
Proper workability ens...
Types of curing include air curing, water curing, and steam curing.
Air curing involves allowing the concrete to cure naturally in the open air.
Water curing involves keeping the concrete moist by spraying or ponding water on the surface.
Steam curing involves applying heat and moisture to accelerate the curing process.
Other types of curing include membrane curing and curing compounds.
Top trending discussions
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Project Engineer
22
salaries
| ₹2 L/yr - ₹4 L/yr |
Electrical Engineer
7
salaries
| ₹2 L/yr - ₹4 L/yr |
Site Engineer
7
salaries
| ₹2.4 L/yr - ₹5.4 L/yr |
Electrical Site Engineer
7
salaries
| ₹3 L/yr - ₹3.5 L/yr |
Quantity Surveyor
7
salaries
| ₹2 L/yr - ₹8.4 L/yr |
AECOM
Jacobs Engineering Group
WSP
TCE