I applied via Walk-in and was interviewed before Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

Qualification personal details salary discussion

Round 3 - Technical 

(7 Questions)

  • Q1. Boiler light Up
  • Q2. Boiler light up process
  • Q3. Boiler interlock
  • Q4. Boiler all parameters
  • Q5. What Is sox nox spm
  • Ans. 

    SOx, NOx, and SPM are air pollutants emitted from industrial processes, particularly from the combustion of fossil fuels.

    • SOx refers to sulfur oxides, which are produced when sulfur-containing fuels are burned. They contribute to acid rain and respiratory issues.

    • NOx refers to nitrogen oxides, which are formed when nitrogen in the air reacts with oxygen during combustion. They contribute to smog and respiratory problems.

    • ...

  • Answered by AI
  • Q6. Compressor cooling tower D.M plant. Relative question
  • Q7. Turbine relative question

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What is dol starter
  • Q2. Type of moter
Round 2 - HR 

(1 Question)

  • Q1. Type of starter
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Electrical engineer HT LT PANEL maintenance
  • Q2. HT< maintenance job
  • Q3. It is a vcb breaker knowledge< PANEL MAINTENANCE JOB
Round 3 - Technical 

(3 Questions)

  • Q1. Electrical engineer HT PANEL & LT PANEL MAINTENANCE
  • Q2. HT PANEL & LT PANEL maintenance
  • Q3. HT LT PANEL MAINTENANCE

Interview Preparation Tips

Interview preparation tips for other job seekers - HT LT PANEL
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Boiler oppretr releted question
  • Q2. Boiler attendance

Interview Preparation Tips

Interview preparation tips for other job seekers - Boiler oppretr
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Types of starters for motor
  • Ans. 

    Starters are used to control the starting and stopping of motors. Types include DOL, star-delta, soft starters, and VFDs.

    • Direct-On-Line (DOL) starters provide full voltage to the motor at start-up

    • Star-Delta starters reduce the voltage during start-up to reduce inrush current

    • Soft starters gradually increase the voltage to the motor to reduce inrush current and mechanical stress

    • Variable Frequency Drives (VFDs) control th...

  • Answered by AI
  • Q2. Maintenance documents

Interview Preparation Tips

Interview preparation tips for other job seekers - Pure maintenance electrical and mechanical, with doc knowledge
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Electrical safety , VFD, Electrical compliance, ISO standards, Electrical maintenance practice,SAP, KAIZEN, Troubleshooting skills
  • Q2. 3 TIER BREAKER INTERLOCK SCHEME FOR DIFFERENT SOURCE OF POWER, VFD AND STARTER HOOKUP LOGICS
  • Ans. 

    The 3 tier breaker interlock scheme is used to ensure safe and efficient power distribution from different sources.

    • The scheme involves three levels of protection to prevent power overload and equipment damage.

    • The first tier involves interlocking the main breaker with the emergency stop button to quickly shut off power in case of an emergency.

    • The second tier involves interlocking the main breaker with the VFD and starte...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be transparent and have positive intention with full integrity

I applied via Referral and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Asked about u r experience and knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Build your knowledge about Power plant.

I applied via Naukri.com and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. What was your past company work preferences
  • Q2. Nothing much important
  • Q3. Who are you to the company
  • Q4. A good worker with efficient

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well and be all the best
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is sheffy valve setting
  • Ans. 

    Sheffy valve setting is the pressure at which the safety valve of a boiler is set to open and release excess steam.

    • Sheffy valve setting is crucial for maintaining safe pressure levels in a boiler.

    • It is typically set slightly above the maximum allowable working pressure of the boiler.

    • The setting is determined based on the design and capacity of the boiler.

    • Regular maintenance and testing of the safety valve is important ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - boiler attendet

I applied via Campus Placement and was interviewed in Nov 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Transformer, Project

Interview Preparation Tips

Interview preparation tips for other job seekers - Firstly I have to introduce myself. Then he started with asking any three subjects which I have strong grasp. Then he started to ask me about Transformer then my projects and finally asked me my strengths and weaknesses.

UPL Interview FAQs

How many rounds are there in UPL Boiler DCS Operator interview?
UPL interview process usually has 3 rounds. The most common rounds in the UPL interview process are Resume Shortlist, Case Study and Technical.
What are the top questions asked in UPL Boiler DCS Operator interview?

Some of the top questions asked at the UPL Boiler DCS Operator interview -

  1. What Is sox nox ...read more
  2. Compressor cooling tower D.M plant. Relative quest...read more
  3. Boiler light up proc...read more

Tell us how to improve this page.

UPL Boiler DCS Operator Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Aarti Industries Interview Questions
4.2
 • 281 Interviews
PI Industries Interview Questions
4.0
 • 103 Interviews
Syngenta Interview Questions
4.2
 • 65 Interviews
Godrej Agrovet Interview Questions
4.1
 • 47 Interviews
Rallis India Interview Questions
4.3
 • 38 Interviews
IFFCO Interview Questions
4.1
 • 36 Interviews
View all
Field Executive
514 salaries
unlock blur

₹2 L/yr - ₹6.4 L/yr

Production Officer
469 salaries
unlock blur

₹1.5 L/yr - ₹7.8 L/yr

Executive
227 salaries
unlock blur

₹2.9 L/yr - ₹11 L/yr

Plant Operator
220 salaries
unlock blur

₹1.5 L/yr - ₹4.5 L/yr

Executive Production
220 salaries
unlock blur

₹3 L/yr - ₹10 L/yr

Explore more salaries
Compare UPL with

Bayer Crop Science Vegetable Seeds

4.4
Compare

Syngenta

4.2
Compare

Coromandel International

4.1
Compare

PI Industries

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview