Injection moulding is a manufacturing process used to produce parts by injecting molten material into a mould.
Molten material is injected into a mould cavity
The material solidifies inside the mould
The mould is then opened and the part is ejected
Commonly used for producing plastic parts
Can also be used for producing metal, glass, and ceramic parts
Core and cavity are the two halves of a mold used in injection molding process.
Core is the part of the mold that creates the internal features of the plastic part.
Cavity is the part of the mold that creates the external features of the plastic part.
Core and cavity are designed to fit together to create the final shape of the plastic part.
The molten plastic is injected into the cavity and takes the shape of the core.
The...
There are various types of plastics such as thermoplastics, thermosetting plastics, and elastomers.
Thermoplastics can be melted and re-molded multiple times, examples include polyethylene and PVC.
Thermosetting plastics cannot be melted and re-molded, examples include epoxy and phenolic resins.
Elastomers are rubber-like materials that can stretch and return to their original shape, examples include silicone and neoprene
Cushion is the amount of money or time added to a project schedule to account for uncertainties and risks.
Cushion is also known as contingency reserve.
It is added to the project schedule to ensure that the project is completed on time and within budget.
The amount of cushion depends on the level of uncertainty and risk involved in the project.
For example, a project with a high level of uncertainty and risk may require a...
Injection moulding machines are classified based on their function, structure, and control system.
Based on function: hydraulic, electric, hybrid
Based on structure: vertical, horizontal, multi-component
Based on control system: manual, semi-automatic, automatic
Examples: Arburg, Engel, Krauss Maffei
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
I applied via Campus Placement and was interviewed before Dec 2023. There were 2 interview rounds.
How can you manage daily travelling?
I applied via Company Website and was interviewed in Jun 2021. There were 4 interview rounds.
Inter location transfer in supply chain involves movement of goods between different locations within the supply chain network.
Inter location transfer helps in optimizing inventory levels and reducing lead times.
It requires coordination between different locations and proper documentation.
Examples include transfer of raw materials from warehouse to production facility, transfer of finished goods from manufacturing plan...
Order alternative items or notify customer if items are not in stock.
Check inventory levels regularly
Identify alternative products that can be offered to customers
Notify customers of out-of-stock items and provide estimated restock dates
I have experience in implementing SAP and Oracle ERPs.
Implemented SAP ERP for a manufacturing company
Implemented Oracle ERP for a retail company
Experience in customizing ERP modules to meet business requirements
posted on 17 Aug 2023
I applied via Referral and was interviewed before Aug 2022. There were 2 interview rounds.
posted on 17 Aug 2024
I applied via Approached by Company and was interviewed before Aug 2023. There were 2 interview rounds.
I am most proficient in Java.
Extensive experience in developing applications using Java
Strong understanding of object-oriented programming principles
Familiarity with popular Java frameworks like Spring and Hibernate
I would design a system using scalable architecture, efficient data storage, and optimized query processing.
Utilize a distributed database system like Cassandra or Hadoop for storing large volumes of data
Implement data partitioning and sharding to distribute the data across multiple servers
Use indexing and caching mechanisms to optimize query performance
Employ load balancing techniques to evenly distribute incoming req...
posted on 12 Feb 2024
I applied via Walk-in and was interviewed in Jan 2024. There were 4 interview rounds.
They given some topic on gd
They gave some gd questions
I applied via Job Portal and was interviewed in Jan 2023. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Jan 2024. There were 2 interview rounds.
Create an online store, products, billings and shipping on the ERP
I applied via Company Website and was interviewed in Aug 2024. There was 1 interview round.
Write a code for HTML DOM
It's normal question easy to cark
Dispatch Executive
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Dispatch Incharge
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Primus Global Technologies
Practo
Magneti Marelli Motherson Auto System
TriGeo Technologies