UltraTech Cement
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Approached by Company and was interviewed in Jun 2023. There were 5 interview rounds.
There are typically two types of roads in an RMC plant for TM movement: internal roads and access roads.
Internal roads are used for transporting materials within the plant premises.
Access roads are used for entering and exiting the plant.
Proper road infrastructure is essential for smooth movement of transit mixers.
Examples: concrete internal roads, paved access roads.
The construction of an underground RCC water tank of 5x5x2m can take approximately 30-45 days.
The time taken for construction can vary based on factors like soil conditions, weather, availability of materials, and workforce.
On average, it may take 1-2 weeks for excavation and foundation work, 2-3 weeks for formwork and reinforcement, and 1-2 weeks for pouring and curing of concrete.
Delays in construction due to unfores...
The procedure of construction of a building involves several steps from planning and design to excavation, foundation, framing, and finishing.
Planning and design phase involves creating blueprints and obtaining necessary permits.
Excavation is done to prepare the site for construction.
Foundation is laid to provide stability and support for the building.
Framing involves constructing the basic structure of the building.
Fi...
Current CTC is $60,000 and expected CTC is $70,000.
Current CTC is $60,000
Expected CTC is $70,000
BOQ stands for Bill of Quantities, which is a document used in construction projects to list the materials, parts, and labor needed for a project.
BOQ is a detailed list of items, quantities, and costs needed for a construction project
It helps in estimating the total cost of the project and ensures all necessary materials are accounted for
BOQ is typically prepared by quantity surveyors or estimators
It is used by contrac...
In vdo calling seniors taken interview about my work, technical skills and abilities.
There should be 30 questions and for passing this test minimum 9 questions should be correct other wise disqualified.
Simple math like work age&time, profit/loss reasoning
30 objectives questions including 10 each maths,reasoning and English in which we have to pass by obtaining 10 marks in 30 mint and I cleared 27 marks .
Group discussion along with other competitors 5 members to know about English fluency and skill Setup
RMC plant stands for Ready Mix Concrete plant, used for producing concrete in a centralized location and delivering it to construction sites.
RMC plant is used for producing concrete in large quantities at a centralized location.
It helps in ensuring consistent quality of concrete mixtures.
The concrete produced in RMC plants is transported to construction sites using transit mixers.
RMC plants are equipped with computeriz...
Different components used in a plant include pumps, valves, motors, compressors, and boilers, each with specific functions and maintenance requirements.
Pumps are used to transfer fluids within the plant and require regular inspection for leaks and proper functioning.
Valves control the flow of fluids and gases in the plant and need to be checked for leaks and corrosion.
Motors power various equipment in the plant and sho...
To reduce cost and increase sales in the cement business, focus on optimizing production processes, improving distribution channels, and implementing effective marketing strategies.
Optimize production processes to reduce manufacturing costs
Improve distribution channels to reach more customers and increase sales
Implement effective marketing strategies to promote the product and attract new customers
Ultratech will be good for me because of its strong reputation in the industry, advanced technology, and commitment to sustainability.
Ultratech has a strong reputation in the industry for quality products and services
They invest in advanced technology to improve efficiency and productivity
Ultratech is committed to sustainability practices, which align with my values
I was interviewed before Mar 2024.
What people are saying about UltraTech Cement
I was interviewed in Jan 2025.
I am a recent graduate with a diploma in engineering, eager to learn and grow in a professional setting.
Recent graduate with a diploma in engineering
Eager to learn and grow in a professional setting
Strong problem-solving skills
Good communication skills
Experience with relevant software/tools (mention specific ones if applicable)
Isothermic: constant temperature, Endothermic: absorbs heat, Exothermic: releases heat
Isothermic: process at constant temperature
Endothermic: absorbs heat from surroundings
Exothermic: releases heat to surroundings
Example: Isothermal expansion of ideal gas
Example: Endothermic reaction like photosynthesis
Example: Exothermic reaction like combustion
I completed a 6-month internship at a civil engineering firm, where I gained hands-on experience in structural design and project management.
Worked on designing structural elements for commercial buildings
Assisted in conducting site visits and inspections
Collaborated with senior engineers on project planning and scheduling
Prepared technical reports and presentations for clients
Types of reactions include synthesis, decomposition, single displacement, double displacement, combustion, and redox reactions.
Synthesis reaction: A + B -> AB
Decomposition reaction: AB -> A + B
Single displacement reaction: A + BC -> AC + B
Double displacement reaction: AB + CD -> AD + CB
Combustion reaction: Fuel + O2 -> CO2 + H2O
Redox reaction: Involves transfer of electrons
Types of flow include laminar flow, turbulent flow, and transitional flow.
Laminar flow: smooth and orderly flow with parallel layers of fluid moving in the same direction.
Turbulent flow: chaotic and irregular flow with mixing of fluid particles in all directions.
Transitional flow: flow that exhibits characteristics of both laminar and turbulent flow.
Examples: Water flowing in a pipe (laminar flow), river rapids (turbul...
Kinetic energy is the energy possessed by an object due to its motion.
Kinetic energy is directly proportional to the mass of the object and the square of its velocity.
The formula for kinetic energy is KE = 0.5 * m * v^2, where m is the mass of the object and v is its velocity.
Examples of kinetic energy include a moving car, a swinging pendulum, or a flying bird.
UltraTech Cement interview questions for popular designations
My notice period is one month.
Notice period is one month
I am required to give one month's notice before leaving my current position
I can start in one month's time
I have a Bachelor's degree in Occupational Health and Safety from XYZ University.
Bachelor's degree in Occupational Health and Safety
Completed courses in workplace safety regulations
Hands-on training in emergency response procedures
I have 10 years of experience in the Safety field, facing challenges in construction sites.
Ensuring compliance with safety regulations and protocols
Implementing safety training programs for construction workers
Conducting regular safety inspections and audits
Addressing hazards such as falls, electrical hazards, and equipment safety
Investigating accidents and near misses to prevent future incidents
Get interview-ready with Top UltraTech Cement Interview Questions
Diagnosing and troubleshooting IT network problems.
Identify the specific issue reported by the user
Check network connectivity and configuration settings
Use network monitoring tools to analyze traffic and identify bottlenecks
Test network devices and cables for faults
Update firmware and software patches as needed
The Oitds network problem is likely caused by a connectivity issue or configuration error.
Check network cables and connections for any physical damage or loose connections.
Verify network settings and configurations to ensure they are correct.
Run network diagnostic tools to identify any issues with the network infrastructure.
Restart network devices such as routers, switches, and modems to refresh connections.
Diagnosing and troubleshooting hardware problems in IT systems.
Identify the specific hardware component causing the issue
Check for loose connections or cables
Run diagnostic tests to pinpoint the problem
Update drivers or firmware if necessary
Consider hardware replacement if the issue persists
Troubleshooting IT and network problems requires a systematic approach and knowledge of various tools and technologies.
Identify the specific issue or symptom reported by the user
Check network connectivity and hardware status
Review logs and error messages for clues
Use diagnostic tools like ping, traceroute, and Wireshark
Consider potential causes such as misconfigurations, software bugs, or hardware failures
I applied via Company Website and was interviewed in Dec 2024. There were 3 interview rounds.
I am prepared for your aptitude test.
Yes, I am ready of trachinal round.
I am available to start immediately and can join as soon as required.
Available to start immediately
Flexible with joining date
Can join as soon as required
Yes, I am ready for joining immediately
I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.
The duration of UltraTech Cement interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 703 interviews
Interview experience
based on 7.2k reviews
Rating in categories
Assistant Manager
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
528
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Officer
493
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
453
salaries
| ₹0 L/yr - ₹0 L/yr |
Officer
388
salaries
| ₹0 L/yr - ₹0 L/yr |
Ambuja Cements
ACC
Shree Cement
Dalmia Bharat Cement