UltraTech Cement
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Referral and was interviewed in May 2022. There were 5 interview rounds.
I applied via Approached by Company and was interviewed in Jan 2022. There were 5 interview rounds.
I have done general aptitude test which was of 30 min max with 45 question.
There were major breakdowns in the last year for Mps & vrm mill, maintenance time varied depending on the issue.
There were 3 major breakdowns in the last year for Mps & vrm mill
Maintenance time ranged from 2 days to 1 week depending on the issue
Examples: gearbox failure took 3 days to repair, motor malfunction took 1 week to repair
posted on 30 Jun 2024
posted on 11 Oct 2024
posted on 7 Aug 2024
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
The differential is a device that allows the wheels on an axle to rotate at different speeds while still receiving power from the engine.
Allows wheels on the same axle to rotate at different speeds
Transfers power from the engine to the wheels
Helps with cornering by allowing the outer wheel to rotate faster than the inner wheel
Consists of gears that distribute power evenly to the wheels
The dumper cooling system is responsible for maintaining the optimal temperature of the dumper to prevent overheating.
Regularly check the coolant levels and top up if necessary.
Inspect the radiator for any leaks or damage.
Clean the radiator fins to ensure proper airflow.
Monitor the temperature gauge regularly while operating the dumper.
If the dumper overheats, stop immediately and allow it to cool down before continuin
Work permit system is a formal process to ensure safety during maintenance activities.
Obtain necessary permits before starting any maintenance work.
Identify potential hazards and implement necessary safety measures.
Communicate with all involved parties about the work being done and safety precautions.
Regularly review and update work permits as needed.
Examples: hot work permit, confined space entry permit, electrical wo
The grade of oil used in a hydraulic system depends on the system's requirements and manufacturer recommendations.
The grade of oil used in a hydraulic system is typically specified by the system manufacturer.
Common grades of hydraulic oil include ISO VG 32, ISO VG 46, and ISO VG 68.
The grade of oil chosen should meet the viscosity and performance requirements of the hydraulic system.
Using the wrong grade of oil can lea...
The beg house in Samson feeder chain may be causing a problem.
Check for any blockages or obstructions in the beg house
Inspect the chain for any signs of wear or damage
Ensure proper lubrication of the chain to prevent friction and wear
Consider replacing the chain if necessary
Oli leakage in Samson feeders can be caused by worn out seals, loose fittings, or improper installation.
Check for worn out seals and replace them if necessary
Tighten any loose fittings to prevent leakage
Ensure proper installation of the feeder to prevent oil leakage
Gearbox motor alignment is crucial for optimal performance and longevity of the equipment.
Ensure the gearbox and motor are properly aligned to prevent premature wear and damage.
Use alignment tools such as dial indicators and laser alignment systems for accurate alignment.
Check for any misalignment by measuring the coupling gap and making adjustments as needed.
Regularly monitor and maintain the alignment to ensure smoot...
posted on 28 May 2024
posted on 27 Aug 2024
I applied via Referral and was interviewed in Feb 2024. There was 1 interview round.
My family members are all doing well and are an important part of my life.
My family consists of my parents, siblings, spouse, and children.
We have regular family gatherings and celebrations to stay connected.
Everyone in my family is pursuing their own career paths and hobbies.
I provide support and care for my family members whenever they need it.
I applied via Job Fair and was interviewed in Feb 2024. There were 2 interview rounds.
How to do preventive maint.
Breakdown cost for plant
Interview experience
based on 20 reviews
Rating in categories
Assistant Manager
891
salaries
| ₹5.4 L/yr - ₹17 L/yr |
Senior Engineer
511
salaries
| ₹4.8 L/yr - ₹13 L/yr |
Assistant Officer
490
salaries
| ₹3.3 L/yr - ₹9.6 L/yr |
Engineer
447
salaries
| ₹3.5 L/yr - ₹11 L/yr |
Assistant Engineer
385
salaries
| ₹2.4 L/yr - ₹9.6 L/yr |
Ambuja Cements
ACC
Shree Cement
Dalmia Bharat Cement