Upload Button Icon Add office photos

UltraTech Cement

Compare button icon Compare button icon Compare
4.2

based on 6.6k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

UltraTech Cement Production Incharge Interview Questions and Answers

Updated 15 Jul 2024

UltraTech Cement Production Incharge Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Production planning
  • Q2. Manpower handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Ok

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - Technical 

(5 Questions)

  • Q1. Manufacturing process
  • Q2. What is raw material
  • Ans. 

    Raw material is the basic material used in the production of goods.

    • Raw material is the primary substance or component used to manufacture products.

    • It can be natural resources like wood, metal, or minerals.

    • It can also be processed materials like chemicals or plastics.

    • Raw materials are transformed into finished products through manufacturing processes.

  • Answered by AI
  • Q3. What is clinker
  • Ans. 

    Clinker is a nodular material produced during the cement manufacturing process.

    • Clinker is a key ingredient in the production of cement.

    • It is formed by heating limestone, clay, and other materials in a kiln.

    • The cooled clinker is then ground into a fine powder to produce cement.

    • The quality of clinker greatly affects the quality of the final cement product.

  • Answered by AI
  • Q4. What is packing plant kapisity
  • Ans. 

    Packing plant capacity refers to the maximum amount of products that can be processed and packaged in a plant within a specific time frame.

    • Packing plant capacity is usually measured in units per hour or units per day.

    • It is important for production engineers to optimize the packing plant capacity to meet demand and maximize efficiency.

    • Factors that can affect packing plant capacity include equipment efficiency, productio

  • Answered by AI
  • Q5. What is coal mill kapisity
  • Ans. 

    Coal mill capacity refers to the maximum amount of coal that can be processed by the mill in a given time period.

    • Coal mill capacity is typically measured in tons per hour or tons per day.

    • It is important for production engineers to optimize coal mill capacity to meet production demands.

    • Factors affecting coal mill capacity include the type of coal, moisture content, and mill design.

    • Increasing coal mill capacity can invol...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is ball mill
  • Ans. 

    A ball mill is a type of grinder used to grind and blend materials for use in mineral dressing processes, paints, pyrotechnics, ceramics, and selective laser sintering.

    • Consists of a hollow cylindrical shell rotating about its axis

    • The axis of the shell may be horizontal or at a small angle to the horizontal

    • The grinding media is the balls, which may be made of steel, stainless steel, ceramic, or rubber

    • The inner surface o...

  • Answered by AI
  • Q2. What is raw mill
  • Ans. 

    Raw mill is a machine used in cement production to grind raw materials into a fine powder before being used in the kiln.

    • Raw mill is used in the cement industry to grind raw materials like limestone, clay, and iron ore into a fine powder.

    • The powdered raw materials are then blended and heated in a kiln to form clinker, which is the intermediate product in cement production.

    • Common types of raw mills include ball mills, ro...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Dalmia Bharat Cement Production Engineer interview:
  • Production Engineering
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Company profile & productivity?
  • Q2. Your product explain & quality ?
  • Ans. 

    Our product is a high-quality, innovative solution that meets the needs of our target market.

    • Our product is designed to be user-friendly and efficient.

    • We use top-of-the-line materials and technology to ensure durability and performance.

    • Customer feedback and satisfaction are key factors in our product development process.

  • Answered by AI
  • Q3. Send the product my important time period ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Pay roll job & nearest home town area ,
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Which type of pc firing
  • Ans. 

    PC firing refers to the type of firing system used in a power plant's boiler to ignite the fuel.

    • PC firing stands for Pulverized Coal firing, where coal is ground into fine powder before being injected into the boiler combustion chamber

    • It is a common method used in coal-fired power plants to efficiently burn coal and generate steam for electricity production

    • Other types of firing systems include fluidized bed combustion

  • Answered by AI
  • Q2. Witch type of cooler house
  • Ans. 

    The type of cooler house depends on the specific requirements of the production process, such as air flow, temperature control, and size.

    • Cooling towers for large-scale industrial production

    • Air conditioning units for smaller production facilities

    • Evaporative coolers for energy-efficient cooling solutions

    • Refrigeration units for temperature-sensitive production processes

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Witch stage of preheater
  • Ans. 

    The preheater stage in cement production is the calciner stage.

    • The preheater typically consists of several stages including the cyclones and the calciner.

    • The calciner stage is where the raw materials are heated to high temperatures before entering the rotary kiln.

    • The calciner stage helps to reduce the energy consumption in the rotary kiln by preheating the raw materials.

    • An example of a preheater configuration is a 4-st

  • Answered by AI
  • Q2. How much capacity
  • Ans. 

    Capacity planning is crucial for ensuring optimal production output and resource utilization.

    • Capacity planning involves assessing current production capacity and forecasting future needs.

    • Factors to consider include equipment capabilities, workforce availability, and production demand.

    • Examples of capacity planning tools include production scheduling software and simulation models.

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

General methametics and basics of chemical engineering

Round 2 - Technical 

(2 Questions)

  • Q1. Fluid dynamics heat transfer material balance
  • Q2. Plant safety and quality control
Round 3 - HR 

(1 Question)

  • Q1. Personal details and general HR questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About heat treatment process
  • Q2. About casting process
  • Q3. Mechanical metallurgy

Interview Preparation Tips

Topics to prepare for India Cements Production Engineer interview:
  • Welding Metallurgy
Interview preparation tips for other job seekers - I am fresher and hardworker.My integrated to do any technical of job in company.Flexibility and adaptability to work in any environment.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Basics about cement industry
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. What made you think you will be employed? Ans: I have the right insights needed for the job
  • Q2. Hope you won't quit a month after being employed? Ans: No,I won't
  • Q3. What made you apply for this job? Ans: I really want to help this company grow.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always appear neat and be a reserved person.
Always work smart

Interview Questionnaire 

2 Questions

  • Q1. Why do u want to leave the present company??
  • Q2. How much do u want money?
Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. About my experience and I work in my area
  • Q2. About myself in my knowledge
Round 3 - Aptitude Test 

Mechanical Engineering field

Round 4 - Technical 

(2 Questions)

  • Q1. Mechanical technical in question
  • Q2. Question about in cement plant

UltraTech Cement Interview FAQs

How many rounds are there in UltraTech Cement Production Incharge interview?
UltraTech Cement interview process usually has 2 rounds. The most common rounds in the UltraTech Cement interview process are Technical and Resume Shortlist.
How to prepare for UltraTech Cement Production Incharge interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at UltraTech Cement. The most common topics and skills that interviewers at UltraTech Cement expect are Pumps, Budgeting, Customer Management, Deployment and Infrastructure.
What are the top questions asked in UltraTech Cement Production Incharge interview?

Some of the top questions asked at the UltraTech Cement Production Incharge interview -

  1. Production plann...read more
  2. Manpower handl...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

JK Cement Interview Questions
4.1
 • 241 Interviews
Grasim Industries Interview Questions
4.0
 • 201 Interviews
ACC Interview Questions
3.9
 • 184 Interviews
Shree Cement Interview Questions
3.8
 • 148 Interviews
Ambuja Cements Interview Questions
3.9
 • 103 Interviews
Star Cement Interview Questions
4.0
 • 62 Interviews
HIL Limited Interview Questions
4.1
 • 60 Interviews
View all
UltraTech Cement Production Incharge Salary
based on 25 salaries
₹3.1 L/yr - ₹9.3 L/yr
33% more than the average Production Incharge Salary in India
View more details

UltraTech Cement Production Incharge Reviews and Ratings

based on 12 reviews

4.4/5

Rating in categories

4.5

Skill development

4.4

Work-life balance

4.4

Salary

4.4

Job security

4.3

Company culture

4.4

Promotions

4.4

Work satisfaction

Explore 12 Reviews and Ratings
Assistant Manager
887 salaries
unlock blur

₹5.4 L/yr - ₹17 L/yr

Senior Engineer
622 salaries
unlock blur

₹4.9 L/yr - ₹13.8 L/yr

Officer
388 salaries
unlock blur

₹3.6 L/yr - ₹11.5 L/yr

Assistant Engineer
375 salaries
unlock blur

₹2.5 L/yr - ₹8.6 L/yr

Manager
366 salaries
unlock blur

₹8.5 L/yr - ₹27 L/yr

Explore more salaries
Compare UltraTech Cement with

Ambuja Cements

3.9
Compare

ACC

3.9
Compare

Shree Cement

3.8
Compare

Dalmia Bharat Cement

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview