To plan the erection of materials in a timely manner, it is important to create a detailed schedule, coordinate with suppliers, ensure proper resources are available, and regularly monitor progress.
Create a detailed schedule outlining the timeline for each phase of the erection process.
Coordinate closely with suppliers to ensure timely delivery of materials.
Ensure that all necessary resources, such as equipment and man...
Planning of stage inspection in sites involves scheduling and conducting inspections at various stages of a project.
Develop a detailed inspection plan outlining the stages of the project where inspections will take place.
Coordinate with project managers, contractors, and other stakeholders to schedule inspections at appropriate times.
Ensure that all necessary documentation and tools are prepared for each inspection.
Con...
Select cranes based on weight by considering crane capacity, load weight, and safety factors.
Consider the crane's maximum capacity rating
Calculate the weight of the load to be lifted
Factor in safety margins to ensure the crane can safely lift the load
Choose a crane with a capacity greater than the calculated load weight
Safety requirements before erection include thorough inspection of equipment, proper training of personnel, and implementation of safety protocols.
Conduct a thorough inspection of all equipment to ensure it is in proper working condition
Ensure all personnel involved in the erection process are properly trained in safety procedures
Implement safety protocols such as wearing appropriate personal protective equipment (PPE)...
Final protocols for project handover involve documentation, verification, and communication.
Ensure all project deliverables are completed and meet quality standards
Document all project processes, procedures, and outcomes for future reference
Verify that all project requirements have been met before handover
Communicate effectively with stakeholders to ensure a smooth transition
Provide training and support to the receivin
Top trending discussions
I applied via Company Website and was interviewed before Aug 2021. There were 3 interview rounds.
Underground Metro segment casting yard steam curing is a process used to accelerate the strength gain of concrete segments for tunnel construction.
Steam curing involves applying high temperature steam to the concrete segments to speed up the hydration process.
This method helps in achieving the required strength of the segments in a shorter time period.
Steam curing is often used in precast concrete production for underg...
Segment casting cycle is the process of creating segments for construction projects using precast concrete.
Segments are cast in a controlled environment to ensure quality and consistency.
The casting cycle includes preparing molds, pouring concrete, curing, demolding, and finishing.
Segments are then transported to the construction site and assembled to form the final structure.
Segments repairing process involves identifying and fixing issues in different sections of a product or system.
Identify the specific segment that needs repair
Analyze the root cause of the issue
Develop a plan for repairing the segment
Implement the repair process
Test the repaired segment to ensure functionality
Types of brick, how to check brick quality, Cement IS code and quality check, Pipe IS code
Types of bricks include clay bricks, concrete bricks, fly ash bricks, etc.
To check brick quality, look for uniform shape, size, color, sound when struck, and absence of cracks.
Cement quality is checked using IS code 12269:1987. Quality can be checked by conducting tests like fineness, setting time, compressive strength, etc.
Pipe q...
I applied via Walk-in and was interviewed before Dec 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 3 Nov 2021
Testing for oil leakage in transformers involves visual inspection, oil analysis, and pressure testing.
Visual inspection of the transformer for any signs of oil leakage
Oil analysis to check for any abnormal levels of dissolved gases or contaminants
Pressure testing to check for any leaks in the transformer's oil-filled compartments
Use of ultrasonic testing to detect any leaks in the transformer's tank
Regular maintenance
I will conduct a thorough testing and inspection process to identify any errors in the Feeder.
Perform visual inspection of the Feeder
Conduct electrical testing to ensure proper functioning
Check for any loose connections or damaged components
Compare the Feeder's performance to the expected results
Review any error logs or system alerts
Consult with colleagues or experts for additional input
I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.
General SSC level aptitude
posted on 2 May 2024
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Inspection Engineer
548
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
212
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Inspection Engineer
133
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
73
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Quality Engineer
72
salaries
| ₹0 L/yr - ₹0 L/yr |
Bureau Veritas
DNV GL
SGS
Intertek