Turkish Engineering Consulting and Contracting
KAL Group Private Limited Interview Questions and Answers
Q1. How to calculate quantities in BIM
Quantities in BIM can be calculated using software tools that extract data from the model.
Use BIM software tools like Revit, ArchiCAD, or Navisworks to extract data from the model
Create schedules or lists of objects and their properties to calculate quantities
Use formulas or built-in functions in the software to perform calculations
Export the data to spreadsheets or other software for further analysis
Check for accuracy and completeness of the data before using it for estimati...read more
Q2. How is BIM helpful in construction
BIM improves collaboration, reduces errors, and enhances efficiency in construction.
BIM allows for better coordination between different teams and stakeholders involved in a project.
It helps in identifying and resolving design clashes before construction begins, reducing errors and rework.
BIM enables accurate quantity takeoffs and cost estimation, leading to better project planning and budgeting.
It also facilitates better communication and visualization of the project, improv...read more
Q3. what is PMIS and how it is useful
PMIS stands for Project Management Information System. It is a software system used for project planning, execution, and monitoring.
PMIS helps in managing project information and communication among stakeholders.
It provides real-time data and analytics to help project managers make informed decisions.
PMIS can be used for scheduling, budgeting, resource allocation, risk management, and quality control.
Examples of PMIS include Microsoft Project, Primavera P6, and Procore.
PMIS c...read more
Q4. Core replacement in Tunnel design
Core replacement in tunnel design involves removing and replacing deteriorated or damaged sections of the tunnel lining.
Core replacement is necessary when the existing tunnel lining is no longer structurally sound.
The process involves carefully removing the damaged section of the lining and replacing it with new materials.
Proper planning and coordination are essential to minimize disruptions to tunnel operations during core replacement.
Core replacement may involve using speci...read more
Q5. How you detect clashes
Clashes are detected through clash detection software and manual coordination meetings.
Use clash detection software to identify clashes between different disciplines' models
Hold regular coordination meetings to discuss and resolve clashes
Review clash reports and prioritize clashes based on severity and impact
Collaborate with project team members to resolve clashes and update models accordingly
Q6. Supports in Tunnels
Supports in tunnels are essential for ensuring the stability and safety of the structure.
Supports can be in the form of rock bolts, shotcrete, steel ribs, or concrete lining.
The type of support used depends on the geology of the surrounding rock and the depth of the tunnel.
Supports are designed to prevent collapses, control ground movement, and distribute loads.
Regular monitoring and maintenance of supports are necessary to ensure their effectiveness.
Examples of tunnel suppor...read more
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month