Filter interviews by
I applied via Job Fair and was interviewed in Oct 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Jul 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
Problem solving tools are techniques used to identify, analyze and solve problems.
Root cause analysis
Fishbone diagram
SWOT analysis
Pareto chart
Brainstorming
5 Whys
Flowchart
Decision matrix
posted on 25 Nov 2024
I applied via Naukri.com and was interviewed in Nov 2022. There were 3 interview rounds.
Real time application refers to software that processes data as it is received, providing immediate results.
Real time applications require fast processing and low latency
Examples include stock trading platforms, traffic monitoring systems, and online gaming
Real time applications often rely on event-driven architecture and streaming data processing
Real time applications can be challenging to develop and require careful
posted on 29 Nov 2024
I applied via Referral and was interviewed before Nov 2023. There were 2 interview rounds.
Technical and non technical
posted on 23 Mar 2025
I appeared for an interview in Feb 2025, where I was asked the following questions.
Gears are mechanical components that transmit torque and motion between rotating shafts, essential in various machines.
Types of gears include spur gears, bevel gears, and worm gears.
Spur gears are used in clocks and conveyor systems for simple motion transfer.
Bevel gears are used in applications like hand drills to change the axis of rotation.
Worm gears provide high torque and are commonly found in elevators and tuning
Cp and Cpk are statistical measures used to assess process capability in manufacturing and quality control.
Cp (Process Capability) measures the potential capability of a process to produce output within specified limits.
Cpk (Process Capability Index) measures how close a process is running to its specification limits, considering the mean.
Cp is calculated as (USL - LSL) / (6 * sigma), where USL is the upper specificati...
PP and PPK are statistical measures used in process capability analysis to assess process performance and capability.
PP (Process Performance) measures how well a process performs over time, considering variation.
PPK (Process Performance Index) assesses how well a process meets specifications, accounting for process mean and variation.
Example: A PP of 1.5 indicates a capable process, while a PPK of 1.0 suggests it may n...
Forging is a manufacturing process that shapes metal using compressive forces, enhancing its strength and durability.
Types of forging include open-die forging, where metal is shaped between two flat dies.
Closed-die forging involves shaping metal in a die that completely encloses it, allowing for more complex shapes.
Roll forging is a continuous process that reduces the cross-section of a workpiece by passing it through ...
Service Advisor
34
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Technician
20
salaries
| ₹1 L/yr - ₹6 L/yr |
Team Lead
19
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Trainee
16
salaries
| ₹1.8 L/yr - ₹2.5 L/yr |
Sales Officer
13
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Mahindra & Mahindra
Ashok Leyland
Hero MotoCorp
TVS Motor