Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2023. There was 1 interview round.
Top trending discussions
The total amount of plaster required for a corridor can be calculated by measuring the length, width, and height of the corridor and multiplying them together.
Measure the length, width, and height of the corridor in meters
Multiply the length, width, and height together to get the volume of the corridor
Determine the coverage area of plaster per square meter
Multiply the volume of the corridor by the coverage area to get
The total amount of plaster required for a corridor can be calculated by measuring the length, width, and height of the corridor and multiplying them together.
Measure the length, width, and height of the corridor in meters
Multiply the length, width, and height together to get the volume of the corridor
Determine the coverage area of plaster per square meter
Multiply the volume of the corridor by the coverage area to get
based on 1 interview
Interview experience
Trainee
107
salaries
| ₹1.4 L/yr - ₹3.5 L/yr |
Assistant Engineer
83
salaries
| ₹2 L/yr - ₹9 L/yr |
Production Engineer
55
salaries
| ₹1.8 L/yr - ₹10.9 L/yr |
Diploma Trainee Engineer
39
salaries
| ₹1.3 L/yr - ₹4 L/yr |
Team Lead
36
salaries
| ₹3 L/yr - ₹12 L/yr |
Mahindra & Mahindra
Tata Motors
Ashok Leyland
Bharat Forge