i
Tirupati Group
Filter interviews by
I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
Technical questions and some basic
posted on 22 Jun 2022
I applied via Campus Placement and was interviewed in May 2022. There were 2 interview rounds.
MCQ's, knowledgeable
Mcqs of coding and ML
I applied via Referral and was interviewed in Feb 2022. There were 4 interview rounds.
About your previous company experience
I applied via Company Website and was interviewed before Dec 2022. There were 3 interview rounds.
posted on 20 Dec 2023
I applied via Naukri.com and was interviewed before Dec 2022. There were 5 interview rounds.
The shrinkage value of casting refers to the reduction in size of a casting during the cooling and solidification process.
Shrinkage occurs due to the contraction of the molten metal as it cools and solidifies.
It is an important consideration in casting design and can affect the dimensional accuracy of the final product.
The shrinkage value varies depending on the type of metal being cast and the specific casting process...
Part proof in press tool is the process of verifying the accuracy and functionality of the tooling before mass production.
Part proof involves testing the press tool with a sample part to ensure it meets the required specifications.
The process includes checking for proper fit, form, and function of the part.
Measurements and inspections are conducted to validate the dimensions and quality of the part.
Any necessary adjust...
The temperature of mold can be calculated using various methods and instruments.
Use a thermometer to measure the temperature of the mold surface
Utilize thermal imaging cameras to capture the temperature distribution of the mold
Consider using thermocouples or temperature sensors embedded in the mold
Calculate the temperature based on the cooling time of the mold after injection molding
Take into account the ambient temper
Defects in casting can occur due to various reasons and can be remedied through proper techniques and processes.
Defects in casting can be caused by factors such as improper mold design, inadequate pouring temperature, or poor quality control.
Remedies for casting defects include improving mold design, optimizing pouring temperature, and implementing strict quality control measures.
For example, if a casting defect like s...
IATF16949 is a quality management standard for the automotive industry.
IATF16949 is based on the ISO 9001 standard.
It focuses on continuous improvement, defect prevention, and reduction of variation and waste.
It sets requirements for the design, development, production, and servicing of automotive-related products.
It emphasizes customer satisfaction and meeting regulatory and legal requirements.
Certification to IATF169...
ISO tag mark is needed to ensure compliance with international standards and to demonstrate quality and credibility.
ISO tag mark is a certification that indicates a company or organization has met the requirements of specific ISO standards.
It helps in establishing trust and credibility with customers, suppliers, and stakeholders.
ISO tag mark ensures that products, services, and processes meet international quality stan...
QC (Quality Control) and QA (Quality Assurance) are two processes used to ensure the quality of products or services.
QC involves inspecting and testing products or services to identify defects or deviations from quality standards.
QA focuses on preventing defects by implementing processes and procedures to ensure quality throughout the entire production or service delivery process.
QC is reactive, while QA is proactive.
Q...
Reasoning questions
Verbal and nonverbal writing
Handling critical situations requires quick thinking, clear communication, and a calm demeanor.
Assess the situation and prioritize actions
Communicate clearly and effectively with all parties involved
Remain calm and focused
Take decisive action while considering potential consequences
Seek assistance or advice from colleagues or superiors if necessary
I prioritize the problems based on urgency and importance, and then allocate time and resources accordingly.
Assess the urgency and importance of each problem
Create a plan of action for each problem
Allocate time and resources based on the plan
Regularly reassess and adjust the plan as needed
Example: If one problem is a deadline that cannot be missed and the other is a minor issue, prioritize the deadline and allocate mor
I applied via Walk-in and was interviewed in Dec 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Oct 2021. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Officer
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Officer
51
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive
42
salaries
| ₹0 L/yr - ₹0 L/yr |
Research Associate
38
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Adani Group
Reliance Industries
Tata Group
Mahindra & Mahindra