Upload Button Icon Add office photos

Filter interviews by

Thyssenkrupp Industrial Solutions Planning Engineer Interview Questions and Answers

Updated 13 May 2018

Thyssenkrupp Industrial Solutions Planning Engineer Interview Experiences

1 interview found

Interview Questionnaire 

1 Question

  • Q1. Questions mainly asked related with the current job profile with roles and Responsibility. Then after asked some technical questions related with job profile.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - HR 

(4 Questions)

  • Q1. Diploma Regarding
  • Q2. Electrical information
  • Q3. What is the transformer. Transformer Working.
  • Ans. 

    A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Transformers work on the principle of electromagnetic induction

    • They consist of two coils of wire, known as the primary and secondary windings

    • The primary winding is connected to the input voltage source, while the secondary winding is connected to the output load

    • The transformer changes th...

  • Answered by AI
  • Q4. What is resistor. What is the measure resistor without multimeter.
  • Ans. 

    A resistor is an electronic component that resists the flow of electrical current.

    • Resistors are used to control the amount of current flowing in a circuit.

    • The resistance of a resistor is measured in ohms (Ω).

    • One way to measure a resistor without a multimeter is by using a simple circuit with a known voltage source and an ammeter to measure the current flowing through the resistor.

    • Another method is to use a resistor col...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

General Aptitude and Fluid Mechanics

Round 3 - One-on-one 

(1 Question)

  • Q1. Tell about yourself?
Round 4 - Technical 

(1 Question)

  • Q1. Why should we Hire you?

Interview Preparation Tips

Interview preparation tips for other job seekers - Research about the company. Be thorough with your resume. Expect most questions and prepare for it. Show confidence and smile in your face
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - HR 

(4 Questions)

  • Q1. Diploma Regarding
  • Q2. Electrical information
  • Q3. What is the transformer. Transformer Working.
  • Ans. 

    A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Transformers work on the principle of electromagnetic induction

    • They consist of two coils of wire, known as the primary and secondary windings

    • The primary winding is connected to the input voltage source, while the secondary winding is connected to the output load

    • The transformer changes th...

  • Answered by AI
  • Q4. What is resistor. What is the measure resistor without multimeter.
  • Ans. 

    A resistor is an electronic component that resists the flow of electrical current.

    • Resistors are used to control the amount of current flowing in a circuit.

    • The resistance of a resistor is measured in ohms (Ω).

    • One way to measure a resistor without a multimeter is by using a simple circuit with a known voltage source and an ammeter to measure the current flowing through the resistor.

    • Another method is to use a resistor col...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Code of fabrication and Installation, Fabrication Sequence with final dispatch erection site
  • Ans. 

    The code of fabrication and installation involves a sequence of steps from fabrication to dispatch and erection at the site.

    • The code of fabrication and installation outlines the standards and procedures for the entire process.

    • The fabrication sequence involves cutting, welding, and assembling the components according to the design specifications.

    • The final dispatch involves packaging and transportation of the fabricated ...

  • Answered by AI
  • Q2. First introduced, Self respect, job site bahavior workmanship with staff like technical

Interview Preparation Tips

Interview preparation tips for other job seekers - As per CV is weite documents for interview best not a failure of the other words
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

General Aptitude and Fluid Mechanics

Round 3 - One-on-one 

(1 Question)

  • Q1. Tell about yourself?
Round 4 - Technical 

(1 Question)

  • Q1. Why should we Hire you?

Interview Preparation Tips

Interview preparation tips for other job seekers - Research about the company. Be thorough with your resume. Expect most questions and prepare for it. Show confidence and smile in your face

Interview Questionnaire 

1 Question

  • Q1. What is production planning
  • Ans. 

    Production planning is the process of organizing and coordinating resources to ensure efficient and timely production of goods or services.

    • It involves determining production goals and objectives

    • It includes creating a production schedule

    • It involves allocating resources such as labor, materials, and equipment

    • It requires coordinating with different departments and stakeholders

    • It aims to optimize production processes and m...

  • Answered by AI

I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How will you plan a project.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and know your work

Tell us how to improve this page.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.5k Interviews
Siemens Interview Questions
4.1
 • 429 Interviews
Cummins Interview Questions
4.3
 • 231 Interviews
ABB Interview Questions
4.1
 • 230 Interviews
John Deere Interview Questions
4.1
 • 228 Interviews
Caterpillar Inc Interview Questions
4.3
 • 178 Interviews
Voltas Interview Questions
4.0
 • 128 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
View all

Thyssenkrupp Industrial Solutions Planning Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

5.0

Work-life balance

4.0

Salary

4.0

Job security

3.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
70 salaries
unlock blur

₹9 L/yr - ₹21.2 L/yr

Manager
48 salaries
unlock blur

₹15 L/yr - ₹31.6 L/yr

Chief Manager
29 salaries
unlock blur

₹25 L/yr - ₹55 L/yr

Executive Engineer
26 salaries
unlock blur

₹5.7 L/yr - ₹15.5 L/yr

Senior Manager
23 salaries
unlock blur

₹20.5 L/yr - ₹45 L/yr

Explore more salaries
Compare Thyssenkrupp Industrial Solutions with

Larsen & Toubro Limited

4.0
Compare

Siemens

4.1
Compare

ABB

4.1
Compare

TK Elevator

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview