Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Texmaco Rail and Engineering Team. If you also belong to the team, you can get access from here

Texmaco Rail and Engineering Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Texmaco Rail and Engineering Project Manager Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

Interview Questionnaire 

1 Question

  • Q1. Asked about work experience and knowledge of your work
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. EHS Defination with explanation
  • Ans. 

    EHS stands for Environment, Health, and Safety. It refers to the laws, rules, standards, and programs that are designed to protect the health and safety of employees and the public as well as the environment.

    • EHS involves identifying and assessing risks in the workplace related to health, safety, and the environment.

    • It includes implementing measures to control and mitigate these risks, such as providing proper training,...

  • Answered by AI
  • Q2. BOCW Act with Factory Act

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me about yourself
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Field Experience
  • Q2. Testing Methodology

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewees must have good knowledge on their past experiences as most of the questions were generally asked from the gained experiences from the past field. Apart from this a good technical knowledge on the basic aspects of civil engineering a one must have such as surveying testing and processes of construction and the steps involved in the execution work etc
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Many technical questions was asked regarding JJM Project
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Is codes and qc knowledge quality regarding question
Round 2 - Technical 

(1 Question)

  • Q1. Is codes and technical works details
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is COS and stages involved init
  • Ans. 

    COS stands for Cost of Sales, which refers to the direct costs associated with producing goods or services.

    • COS includes costs such as raw materials, labor, and manufacturing overhead.

    • Stages involved in COS include identifying direct costs, calculating total COS, and analyzing COS to determine profitability.

    • Example: If a company sells a product for $100 and the direct costs to produce that product are $60, the COS would...

  • Answered by AI
  • Q2. What do you mean by EOT
  • Ans. 

    EOT stands for End of Transmission. It is a signal used to indicate the end of a transmission of data.

    • EOT is commonly used in telecommunications and computer networking to signify the end of a message or data transmission.

    • It is represented by the ASCII control character with the code 04.

    • EOT is often used in conjunction with other control characters like SOH (Start of Header) and ETX (End of Text) in communication proto...

  • Answered by AI
  • Q3. What is a CLAIM
  • Ans. 

    A claim is a request made by an individual or entity for payment of benefits or services covered by an insurance policy.

    • A claim is typically submitted by a policyholder or healthcare provider to an insurance company.

    • It includes details such as the services provided, dates of service, and the amount billed.

    • The insurance company reviews the claim to determine if it meets the policy's coverage criteria.

    • Once approved, the ...

  • Answered by AI
  • Q4. What do you mean by RFI
  • Ans. 

    RFI stands for Request for Information, which is a formal process used to gather information from potential suppliers or vendors.

    • RFI is typically used in procurement processes to collect information about products, services, or suppliers before making a decision.

    • It helps organizations to understand the capabilities, pricing, and other details of potential suppliers.

    • RFIs are often used as a preliminary step before issui...

  • Answered by AI
  • Q5. How todo Estimates
  • Ans. 

    Estimates are calculated predictions of the cost, time, and resources required for a project.

    • Gather all relevant information and data related to the project

    • Break down the project into smaller tasks or components

    • Use historical data or industry benchmarks to estimate the time and cost for each task

    • Consider any potential risks or uncertainties that may impact the estimates

    • Document the estimates and communicate them clearl

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Feb 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(7 Questions)

  • Q1. Details of Procurement Process
  • Ans. 

    Procurement process involves identifying needs, selecting suppliers, negotiating contracts, and managing relationships.

    • Identify needs and requirements

    • Research and select potential suppliers

    • Negotiate terms and conditions

    • Create and sign contracts

    • Manage supplier relationships and performance

    • Monitor and evaluate procurement process effectiveness

  • Answered by AI
  • Q2. Understanding the material to be purchased
  • Q3. Suppliers database ans popular suppliers
  • Q4. Achievements in given project assignment
  • Q5. Supplier evaluation and selection process
  • Q6. Awareness of terms and conditions used in EPC projects
  • Q7. Integrity with internal stake holders
  • Ans. 

    Integrity with internal stakeholders is crucial for building trust and maintaining a positive work environment.

    • Communicate openly and honestly with colleagues and superiors

    • Respect confidentiality and avoid gossip or spreading rumors

    • Follow through on commitments and hold yourself accountable

    • Act with fairness and impartiality in decision-making

    • Admit mistakes and take responsibility for correcting them

    • Lead by example and

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - While attending the interview, keep your responses to the point.
Keep your involvement in your existing job and mark/ keep abreast on all such tiny issues, that will represent your strength for the required position.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical profile related questions working experience wise quality
Round 3 - HR 

(1 Question)

  • Q1. Document verification sallary bank statement sallary discussion
Round 4 - Behavioral 

(1 Question)

  • Q1. Know about you and work education femily and other

Texmaco Rail and Engineering Interview FAQs

How to prepare for Texmaco Rail and Engineering Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Texmaco Rail and Engineering. The most common topics and skills that interviewers at Texmaco Rail and Engineering expect are Project Execution, Project Management, Project Planning, Electrical Works and History.

Tell us how to improve this page.

Texmaco Rail and Engineering Project Manager Salary
based on 9 salaries
₹5 L/yr - ₹13 L/yr
40% less than the average Project Manager Salary in India
View more details

Texmaco Rail and Engineering Project Manager Reviews and Ratings

based on 2 reviews

4.4/5

Rating in categories

4.4

Skill development

4.4

Work-life balance

4.4

Salary

4.4

Job security

4.4

Company culture

4.4

Promotions

4.4

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Engineer
45 salaries
unlock blur

₹1.8 L/yr - ₹4.8 L/yr

Assistant Manager
43 salaries
unlock blur

₹2.2 L/yr - ₹7.2 L/yr

Site Engineer
43 salaries
unlock blur

₹1.8 L/yr - ₹4.7 L/yr

Technical Assistant
40 salaries
unlock blur

₹1 L/yr - ₹2.8 L/yr

Senior Engineer
26 salaries
unlock blur

₹3.6 L/yr - ₹9 L/yr

Explore more salaries
Compare Texmaco Rail and Engineering with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview