Filter interviews by
General pest control questions
Service types and frequency refer to the different types of services offered and how often they are provided.
Service types can include customer service, technical support, maintenance, etc.
Frequency can vary depending on the service type and customer needs.
Examples: daily customer service calls, weekly maintenance visits, monthly technical support updates
Top trending discussions
posted on 9 Oct 2024
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
The main reason for belt joint failure is usually due to improper installation or maintenance.
Improper installation of the belt joint, such as incorrect alignment or tensioning
Lack of proper maintenance, leading to wear and tear of the joint
Use of low-quality materials for the joint
Excessive load or stress on the belt joint
Environmental factors like temperature or humidity affecting the joint
The alignment maximum tolerance refers to the maximum allowable deviation from the specified alignment.
Alignment maximum tolerance is the maximum allowable deviation from the specified alignment.
It is typically expressed in terms of a percentage or a specific measurement unit.
For example, a machine part may have an alignment maximum tolerance of +/- 0.005 inches.
Exceeding the alignment maximum tolerance can lead to per
To replace the bucket wheel reclaimer luffing cylinder, follow these steps.
1. Shut down the machine and ensure all power sources are disconnected.
2. Remove any surrounding components that may obstruct access to the luffing cylinder.
3. Use appropriate tools to disconnect the hydraulic hoses and fittings from the cylinder.
4. Support the weight of the cylinder as it is removed to prevent damage to surrounding components.
5...
JSA stands for Job Safety Analysis, focusing on specific job tasks, while HIRA stands for Hazard Identification and Risk Assessment, focusing on overall workplace hazards.
JSA is task-specific, focusing on individual job tasks and potential hazards
HIRA is broader, looking at overall workplace hazards and assessing risks
JSA involves breaking down a job into steps and identifying potential hazards for each step
HIRA involv...
To create a PR in SAP, you can use transaction code ME51N or ME21N.
Use transaction code ME51N to create a purchase requisition in SAP.
Enter the necessary details such as material, quantity, delivery date, etc.
Save the purchase requisition and it will be created in the system.
Alternatively, you can also use transaction code ME21N to create a purchase order directly.
The procedure of pulley replacement involves identifying the faulty pulley, removing the old pulley, installing the new pulley, and testing the system.
Identify the faulty pulley by checking for any signs of wear or damage.
Use appropriate tools to remove the old pulley, such as a pulley puller or wrench.
Install the new pulley by aligning it properly and securing it in place.
Test the system to ensure the new pulley is fu...
PTW stands for Permit to Work, a procedure used to ensure that work is carried out safely in potentially hazardous environments.
PTW is a formal written system used to control certain types of work that are identified as potentially hazardous.
Before starting work, a permit must be obtained from a designated authority.
The permit outlines the work to be done, the hazards involved, and the necessary precautions to be taken...
I applied via Naukri.com and was interviewed in Aug 2023. There were 4 interview rounds.
posted on 30 Jan 2024
I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
posted on 7 Dec 2022
I applied via Approached by Company and was interviewed before Dec 2021. There were 3 interview rounds.
posted on 12 Oct 2021
I applied via Naukri.com and was interviewed in Jun 2020. There were 3 interview rounds.
posted on 26 Jul 2024
I have 5 years of experience in substation maintenance, including incident response and resolution.
Managed regular maintenance schedules for substation equipment
Responded to and resolved incidents such as power outages or equipment failures
Implemented safety protocols to prevent future incidents
Trained team members on proper maintenance procedures
Collaborated with engineers to improve substation efficiency
I applied via Naukri.com and was interviewed before Sep 2023. There were 2 interview rounds.
Left previous job for career growth opportunities. Last CTC was $60,000. Expectations include a challenging role with room for advancement.
Left for career growth opportunities
Last CTC was $60,000
Expectations include challenging role and room for advancement
Signature Global is a reputable company known for its quality construction and customer satisfaction.
Reputable company with a strong track record in quality construction
Focus on customer satisfaction and delivering projects on time
Innovative designs and modern amenities in their developments
Strong presence in the real estate market with successful projects like Signature Global City, Signature Global Park, etc.
Signature Global is a real estate company specializing in affordable housing projects in India.
Specializes in affordable housing projects
Operates in the real estate sector
Focused on providing quality homes at affordable prices
based on 1 interview
Interview experience
Operations Executive
18
salaries
| ₹2.9 L/yr - ₹4.8 L/yr |
MIS Executive
12
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Branch Manager
11
salaries
| ₹6.6 L/yr - ₹12 L/yr |
Senior Branch Head
6
salaries
| ₹8.8 L/yr - ₹10.5 L/yr |
Pest Control Technician
5
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Ecolab
Rentokil Initial
Orkin
Security and Intelligence Services (India)