Teknic Euchner Electronics
10+ Hindustan Construction Company Interview Questions and Answers
Q1. How to remove the flash of alluminium product
To remove flash from aluminum products, use methods like trimming, grinding, sanding, or chemical etching.
Trimming excess material using cutting tools
Grinding the flash off with a grinder
Sanding the surface to remove excess material
Chemical etching to dissolve the flash
Using a deburring tool to smooth out edges
Q2. What is the least count of plunger dial gauge
The least count of a plunger dial gauge is the smallest measurement that can be read on the gauge.
The least count is typically mentioned on the dial face of the gauge.
It is determined by the number of divisions on the dial face and the scale of the gauge.
For example, if a plunger dial gauge has divisions of 0.01mm, the least count would be 0.01mm.
The least count is important for accurate measurements and precision in engineering and manufacturing processes.
Q3. How to file the alluminium product
To file an aluminum product, use a file with fine teeth to remove excess material and create a smooth surface.
Use a file with fine teeth to gradually remove excess material from the aluminum product.
Work in one direction to avoid creating scratches on the surface.
Check the progress frequently to ensure the desired shape and smoothness are achieved.
Use light pressure while filing to prevent damaging the product.
Finish off with sandpaper for a smoother finish if needed.
Q4. Quality of soldering done
The quality of soldering done is consistently high, meeting industry standards.
We have a rigorous training program in place to ensure all staff are proficient in soldering techniques.
Regular quality checks are conducted to identify any issues and address them promptly.
We use high-quality soldering materials to ensure strong and reliable connections.
Our team has received positive feedback from clients on the quality of soldering work done.
We prioritize precision and attention ...read more
Q5. How to move the ok parts
Ok parts can be moved by using a forklift or pallet jack.
Use a forklift to lift and move the ok parts to their designated location
Utilize a pallet jack for smaller quantities of ok parts
Ensure proper training and certification for operating the equipment
Follow safety protocols to prevent accidents
Q6. How to check perpendicularity
Perpendicularity can be checked using a square or a protractor to ensure a 90-degree angle.
Use a square tool to check if the angle is exactly 90 degrees
Use a protractor to measure the angle and ensure it is 90 degrees
Check for right angles by ensuring that two lines intersect at 90 degrees
Q7. How to check position
Position can be checked by using various methods such as manual inspection, GPS tracking, sensors, and landmarks.
Use GPS tracking devices to accurately determine position
Utilize sensors like accelerometers and gyroscopes to track movement and orientation
Refer to landmarks or known reference points for location verification
Q8. How to check the stock
Stock can be checked by conducting physical inventory counts, using inventory management software, and comparing records with actual stock levels.
Conduct regular physical inventory counts to compare with records
Utilize inventory management software to track stock levels and generate reports
Implement barcode scanning or RFID technology for accurate stock tracking
Cross-reference sales data with stock levels to identify discrepancies
Perform regular audits to ensure accuracy of s...read more
Q9. How to check the symmetry
Symmetry can be checked by comparing the mirror images of an object or by using measuring tools.
Use a mirror to check if the object's reflection is symmetrical
Measure the dimensions of both sides of the object and compare them
Use measuring tools like calipers or rulers to ensure symmetry
Check for any visual differences or irregularities in the object's design
Q10. Quality of hand soldering done
Hand soldering is done with high quality standards, ensuring strong and reliable connections.
All solder joints are visually inspected for proper formation and cleanliness
Proper temperature and soldering technique are used to prevent cold joints
Quality control checks are performed regularly to maintain high standards
Top HR Questions asked in Hindustan Construction Company
Interview Process at Hindustan Construction Company
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month