BOQ of 11kV line refers to the Bill of Quantities for materials and labor required for the construction of an 11kV power line.
BOQ includes detailed list of materials, quantities, and costs for the project
It also includes labor costs, equipment costs, and any other expenses related to the project
Example: BOQ for 11kV line may include items like conductors, insulators, poles, transformers, labor costs, etc.
LT cable specifications refer to the specifications of low tension cables used in electrical installations.
LT cables are typically rated for voltages up to 1kV.
They are commonly used for power distribution in residential and commercial buildings.
LT cables are insulated with materials such as PVC or XLPE for protection against electrical faults.
Specifications may include conductor material, insulation type, voltage rati...
BOQ of LT line refers to the Bill of Quantities for Low Tension electrical lines.
BOQ includes detailed list of materials, quantities, and costs for LT line installation.
It helps in estimating the total cost of the project and planning the procurement of materials.
Example: BOQ for LT line may include items like cables, poles, transformers, insulators, etc.
I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.
I have 8 years of work experience in electrical engineering.
8 years of experience in electrical engineering
Specialized in power systems and renewable energy
Worked on projects involving circuit design and testing
Experience with CAD software for designing electrical systems
Different types of circuit breakers include thermal, magnetic, and hybrid.
Thermal circuit breakers operate based on temperature rise caused by excessive current flow.
Magnetic circuit breakers operate based on the strength of the magnetic field generated by current flow.
Hybrid circuit breakers combine features of both thermal and magnetic circuit breakers.
Other types include oil circuit breakers, air circuit breakers, a
I applied via Apna Jobs and was interviewed in Sep 2021. There was 1 interview round.
posted on 27 Jul 2021
PLC and SCADA are industrial control systems used for automation and monitoring of processes.
PLC stands for Programmable Logic Controller and is used for controlling industrial processes.
SCADA stands for Supervisory Control and Data Acquisition and is used for monitoring and controlling large-scale industrial processes.
PLC is used for controlling individual machines or processes while SCADA is used for monitoring and c...
posted on 17 Nov 2019
I applied via Recruitment Consultant and was interviewed in Oct 2019. There were 3 interview rounds.
A signal line diagram is a graphical representation of a system's electrical circuitry.
It shows the flow of electrical signals through the system
It includes symbols for components such as switches, transformers, and relays
It is used by technicians to troubleshoot and repair electrical systems
It can also be used to design new systems or modify existing ones
Power factor can be found by dividing the real power by the apparent power.
Real power is measured in watts (W)
Apparent power is measured in volt-amperes (VA)
Power factor ranges from 0 to 1, with 1 being ideal
Power factor can be improved by using capacitors or correcting the phase angle
posted on 3 May 2019
I applied via Referral and was interviewed in Aug 2018. There were 4 interview rounds.
Electrical Design Engineer
4
salaries
| ₹2.4 L/yr - ₹3.3 L/yr |
Program Engineer
3
salaries
| ₹3 L/yr - ₹3 L/yr |
Erection & Commissioning Engineer
3
salaries
| ₹3 L/yr - ₹3.5 L/yr |
Bharat Forge
Mahindra & Mahindra
Tata Motors
Ashok Leyland