I applied via Referral and was interviewed in Aug 2018. There were 4 interview rounds.
Top trending discussions
posted on 31 Oct 2022
posted on 8 Oct 2024
Power system is a network of electrical components used to generate, transmit, and distribute electricity.
Power system includes power generation plants, transmission lines, substations, and distribution networks.
It involves the conversion of electrical energy from one form to another for efficient delivery.
Power systems are designed to ensure reliable and stable supply of electricity to consumers.
Examples of power syst...
I was interviewed in Apr 2024.
Renewable energy sources are sources of energy that are replenished naturally, such as sunlight, wind, and water.
Solar energy: harnessing sunlight to generate electricity
Wind energy: using wind turbines to convert wind into electricity
Hydropower: generating electricity from flowing water in rivers or dams
Biomass: using organic materials like wood or agricultural waste to produce energy
Geothermal energy: tapping into he
posted on 1 May 2024
I applied via Campus Placement and was interviewed in Apr 2024. There were 2 interview rounds.
Technical questions (be prepared)
posted on 23 Sep 2023
I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.
BOQ of 11kV line refers to the Bill of Quantities for materials and labor required for the construction of an 11kV power line.
BOQ includes detailed list of materials, quantities, and costs for the project
It also includes labor costs, equipment costs, and any other expenses related to the project
Example: BOQ for 11kV line may include items like conductors, insulators, poles, transformers, labor costs, etc.
LT cable specifications refer to the specifications of low tension cables used in electrical installations.
LT cables are typically rated for voltages up to 1kV.
They are commonly used for power distribution in residential and commercial buildings.
LT cables are insulated with materials such as PVC or XLPE for protection against electrical faults.
Specifications may include conductor material, insulation type, voltage rati...
BOQ of LT line refers to the Bill of Quantities for Low Tension electrical lines.
BOQ includes detailed list of materials, quantities, and costs for LT line installation.
It helps in estimating the total cost of the project and planning the procurement of materials.
Example: BOQ for LT line may include items like cables, poles, transformers, insulators, etc.
posted on 8 Nov 2023
I applied via Naukri.com and was interviewed in May 2023. There were 4 interview rounds.
About your work style and work management
Transformer works on the principle of electromagnetic induction to transfer electrical energy between two or more circuits.
Transformers have two coils of wire, known as primary and secondary coils.
When an alternating current flows through the primary coil, it creates a changing magnetic field.
This changing magnetic field induces a voltage in the secondary coil, transferring electrical energy.
Transformers are used to st...
The process of new meter installation involves site survey, meter selection, installation, testing, and commissioning.
Site survey to determine the location and requirements for the new meter
Meter selection based on the specific needs and specifications of the site
Installation of the new meter by qualified electricians or engineers
Testing the meter to ensure accurate readings and proper functionality
Commissioning the me...
LOTO stands for Lockout/Tagout. It is a safety procedure used to ensure that dangerous machines are properly shut off and not started up again prior to the completion of maintenance or servicing work.
LOTO involves isolating energy sources, locking them out, and tagging them to indicate that maintenance work is being performed.
Workers involved in the maintenance work are the ones who apply the locks and tags, ensuring t...
I applied via Company Website and was interviewed in Jan 2023. There were 2 interview rounds.
posted on 28 Sep 2021
I applied via Referral and was interviewed before Sep 2020. There was 1 interview round.
Project Engineer
23
salaries
| ₹2 L/yr - ₹4 L/yr |
Service Engineer
13
salaries
| ₹2.4 L/yr - ₹3.2 L/yr |
Assistant Manager
12
salaries
| ₹4.2 L/yr - ₹6.2 L/yr |
Project Coordinator
12
salaries
| ₹2.7 L/yr - ₹4.1 L/yr |
Quality Engineer
11
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Kirloskar Electric Company
BHEL
CG Power and Industrial Solutions
Siemens