Filter interviews by
I have 5 years of experience operating injection moulding machines.
I have 5 years of hands-on experience operating injection moulding machines.
I am familiar with setting up, monitoring, and troubleshooting injection moulding processes.
I have worked with various types of injection moulding machines and materials.
I have a strong understanding of safety protocols and quality control measures in injection moulding.
I have t...
The question is not provided.
Please provide the question to answer.
Without the question, it is impossible to provide an answer.
Top trending discussions
posted on 20 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
posted on 11 Oct 2020
I applied via Recruitment Consulltant and was interviewed in Oct 2020. There were 5 interview rounds.
posted on 8 Feb 2022
posted on 18 Sep 2023
I appeared for an interview before Sep 2022.
posted on 19 Feb 2024
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 28 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
The process of erection of duct involves planning, fabrication, transportation, installation, and testing.
Planning involves determining the layout, size, and material of the ducts.
Fabrication includes cutting, bending, and assembling the ducts according to the design.
Transportation is the movement of fabricated ducts to the installation site.
Installation involves positioning and connecting the ducts to the HVAC system.
...
The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.
The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.
Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.
Fabrication processes must also ...
The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.
Start by assembling the foundation and anchor bolts.
Next, erect the columns and connect them to the foundation.
Then, install the beams and trusses to form the framework.
After that, add the bracing and diagonal members for stability.
Finally, complete the structure by ad...
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Assistant Manager
309
salaries
| ₹6 L/yr - ₹15 L/yr |
Senior Engineer
242
salaries
| ₹4 L/yr - ₹10.6 L/yr |
Field Officer
207
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Deputy Manager
178
salaries
| ₹9.4 L/yr - ₹16.5 L/yr |
Territory Manager
172
salaries
| ₹3.6 L/yr - ₹10 L/yr |
John Deere
Thermax Limited
ABB
KONE