Q1. What all the IS code for rock testing
IS codes for rock testing in geotechnical engineering
IS 10082:1982 - Method for determination of unconfined compressive strength of rock materials
IS 10083:1982 - Method for determination of point load strength index of rock materials
IS 10086:1982 - Method for determination of direct shear strength of rock materials
IS 10087:1982 - Method for determination of tensile strength of natural building stones
IS 1121:1974 - Method for determination of water absorption and specific grav...read more
Q2. What is Earned value Analysis?
Earned value analysis is a project management technique used to measure project performance and progress.
Compares actual work completed and costs incurred to planned work and costs
Helps identify project variances and forecast project outcomes
Uses metrics such as planned value, earned value, and actual cost
Provides insight into project schedule and budget performance
Can be used to make data-driven decisions and adjustments to project plans
Q3. How to maintain the progress as per taget time line
To maintain progress as per target timeline, it is important to regularly track and monitor the project, adjust resources as needed, communicate effectively with team members, and address any issues promptly.
Regularly track and monitor project milestones and progress
Adjust resources and priorities as needed to stay on track
Communicate effectively with team members to ensure everyone is aware of the timeline and their responsibilities
Address any issues or roadblocks promptly t...read more
Q4. Used IRC codes and SP
Yes
IRC codes and SP are commonly used in structural engineering
IRC codes refer to the Indian Road Congress codes, which provide guidelines for the design and construction of roads and bridges in India
SP refers to the Standards and Practices, which are specific codes and regulations followed in the field of structural engineering
Engineers use IRC codes and SP to ensure the safety, stability, and durability of structures
These codes cover various aspects such as design loads, ma...read more
Q5. Types of air conditioning
Types of air conditioning include central air conditioning, window units, split systems, and portable units.
Central air conditioning: cools the entire house through ducts and vents
Window units: installed in windows and cool a single room
Split systems: have components both inside and outside the home
Portable units: can be moved from room to room and do not require installation
Q6. Difference between LSM and WSM
LSM and WSM are two different methods of measuring soil moisture content.
LSM stands for Laboratory Soil Moisture and WSM stands for Field Water Content.
LSM measures the moisture content of soil samples in a laboratory setting.
WSM measures the water content of soil in the field using various methods such as gravimetric, neutron probe, and time domain reflectometry.
LSM is more accurate but time-consuming, while WSM is less accurate but more convenient.
Both methods are important...read more
Q7. What is baseline schedule
Baseline schedule is the original project schedule that serves as a reference point for measuring progress and performance.
Baseline schedule is the initial approved project schedule that includes planned start and end dates for each task.
It is used as a benchmark to compare actual progress and performance against the planned schedule.
Any changes to the schedule must be documented and justified against the baseline schedule.
Baseline schedule helps in identifying delays, deviat...read more
Q8. Improve the quality of trackworks.
To improve the quality of trackworks, proper maintenance, regular inspections, and use of high-quality materials are essential.
Regular inspections to identify and address any issues promptly
Proper maintenance schedule to prevent wear and tear
Use of high-quality materials for durability and longevity
Investing in modern technology for more efficient trackworks
Training staff on best practices for track maintenance