Filter interviews by
I applied via Walk-in and was interviewed in Dec 2021. There were 2 interview rounds.
Top trending discussions
posted on 16 Mar 2023
I applied via Approached by Company and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.
A line diagram of a wind turbine generator (WTG) shows the flow of energy from wind to electricity.
The diagram typically includes the rotor blades, gearbox, generator, and power electronics
The blades capture wind energy and turn the rotor, which drives the gearbox
The gearbox increases the rotational speed and sends it to the generator
The generator converts the rotational energy into electrical energy
The power electroni...
DFIG converters are used in wind turbines to convert variable frequency AC power to DC power and back to AC power.
DFIG stands for Doubly Fed Induction Generator
The converter consists of two back-to-back voltage source converters
One converter controls the rotor current and the other controls the grid current
The rotor current is controlled to maintain a constant torque on the turbine
The grid current is controlled to main...
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
Increasing business can be achieved through various strategies.
Identify target audience and tailor marketing efforts accordingly
Offer promotions and discounts to attract new customers
Improve customer service to retain existing customers
Expand product or service offerings to attract a wider audience
Collaborate with other businesses to reach new markets
posted on 22 Mar 2021
I applied via Campus Placement and was interviewed before Apr 2019. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
About experience about cell and SOP,MSDS, etc.
About experience about and how to improve quality, efficiency,
TPS stands for Transactions Per Second, a metric used to measure the number of transactions processed in a system within a second.
TPS is a key performance indicator for systems handling high volumes of transactions.
It is commonly used in the context of payment processing systems, online banking, and stock trading platforms.
Higher TPS indicates better system performance and scalability.
For example, a payment gateway may...
5S is a methodology used for organizing a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate needed tools, parts, and instructions from unneeded items.
Set in order: Arrange items so they are easy to use and label them to eliminate searching.
Shine: Clean the work area and equipment regularly.
Standardize: Establish ...
based on 2 reviews
Rating in categories
Service Engineer
61
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
31
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Waaree Energies
Adani Green Energy
Vikram Solar
Azure Power