Filter interviews by
Complete Your industrial life and Your skill level and your Attitude and attraction Still
VA is value analysis, while VE is value engineering. Both are cost-saving techniques used in product development.
VA is a systematic review of a product's components and functions to identify areas where cost can be reduced without affecting performance.
VE is a more comprehensive approach that involves rethinking the entire product design to achieve cost savings while improving performance.
VA is typically used in the ea...
The cost of plastic molding components can be calculated by considering factors such as material cost, tooling cost, labor cost, and overhead cost.
Determine the material cost per unit of the component
Calculate the tooling cost, which includes the cost of the mold and any necessary equipment
Factor in the labor cost, which includes the cost of operating the molding machine and any necessary labor for finishing and assemb...
Polymers are large molecules made up of repeating units called monomers. They have a wide range of applications in various fields.
Polyethylene
Polypropylene
Polyvinyl chloride
Polystyrene
Polyester
Polyurethane
Nylon
Teflon
Silicone
Rubber
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 3 interview rounds.
SAP is an enterprise resource planning software used for managing business operations and customer relations.
SAP stands for Systems, Applications, and Products in Data Processing
It is used by companies to manage their business operations such as finance, sales, procurement, and inventory management
SAP also offers customer relationship management (CRM) software to manage interactions with customers
It is widely used in i...
I use various Tcodes depending on the task at hand.
For material master data maintenance, I use MM01, MM02, and MM03.
For purchase order creation and maintenance, I use ME21N and ME22N.
For inventory management, I use MIGO and MB51.
For production planning, I use MD61 and MD04.
For quality management, I use QA32 and QE51.
For sales and distribution, I use VA01, VA02, and VA03.
To punch production in SAP, follow these steps:
Create a production order in SAP
Release the production order
Confirm the production order
Perform goods receipt for the production order
Perform goods issue for the production order
I want to join Bosch because of its reputation for innovation and excellence. In 5 years, I see myself in a leadership role. I am ready to work in shifts. I have successfully completed an improvement project in my current role. The challenges I face in my current employer include outdated technology and lack of collaboration.
Joining Bosch for its reputation for innovation and excellence
Aspiring to be in a leadership ro...
I applied via Campus Placement and was interviewed before May 2023. There were 3 interview rounds.
Basic Aptitute questions
Python Programming, Leet Code, everyday 1 hour
I applied via Naukri.com and was interviewed in Feb 2021. There were 6 interview rounds.
I applied via LinkedIn and was interviewed before Mar 2020. There was 1 interview round.
Assignments with Reasoning and maths etc.
I appeared for an interview before Mar 2023.
Coding test, on C, around 1 hr, on teams
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
44
salaries
| ₹4.1 L/yr - ₹8.7 L/yr |
Production Engineer
35
salaries
| ₹1.8 L/yr - ₹5.2 L/yr |
Senior Engineer
32
salaries
| ₹3.5 L/yr - ₹6.5 L/yr |
Engineer
22
salaries
| ₹2.3 L/yr - ₹4.5 L/yr |
Quality Engineer
14
salaries
| ₹2.5 L/yr - ₹3.6 L/yr |
Faurecia
Hyundai Mobis
MAHLE ANAND Filter Systems
Knorr-Bremse