Round 1 - Technical 

(2 Questions)

  • Q1. What is the weight of steel in a 1 cubic meter concrete cube?
  • Ans. 

    The weight of steel in a 1 cubic meter concrete cube depends on the percentage of steel reinforcement used in the concrete mix.

    • The weight of steel in a concrete cube can vary based on the design requirements and specifications.

    • Typically, the weight of steel reinforcement in concrete is around 1% to 2% of the total volume of concrete.

    • For example, if a concrete cube has a total volume of 1 cubic meter, the weight of stee

  • Answered by AI
  • Q2. What is the difference between rebar, TMT, and reinforcement?
  • Ans. 

    Rebar, TMT, and reinforcement are all materials used in construction for providing strength and stability to structures.

    • Rebar stands for reinforcing bar and is a steel bar or mesh of steel wires used as a tension device in reinforced concrete and masonry structures.

    • TMT stands for Thermo-Mechanically Treated bars and is a type of rebar with enhanced strength and ductility properties due to a special manufacturing proces...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - One should study the parameters of steel and concrete in the context of construction work profiles.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the method for calculating the weight of a 12 mm diameter steel bar with a length of 12 meters?
  • Ans. 

    The weight of a steel bar can be calculated using the formula: weight = volume x density

    • Calculate the volume of the steel bar using the formula: volume = πr^2h

    • Determine the density of steel, which is typically around 7850 kg/m^3

    • Calculate the weight using the formula: weight = volume x density

    • Substitute the values of radius (6 mm), length (12 meters), and density into the formula to find the weight

  • Answered by AI
  • Q2. What is the method to calculate the development length of steel?
  • Ans. 

    The development length of steel can be calculated using the formula specified in the relevant design code.

    • The development length of steel is calculated based on the bond strength between the steel reinforcement and the concrete.

    • The formula for calculating the development length is typically provided in the design code being used, such as ACI 318 for American standards or Eurocode 2 for European standards.

    • Factors such a...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The company has excellent staff and demonstrates strong coordination across all sites.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Civil engineering sewage project
  • Q2. Civil engineering
Round 2 - Technical 

(2 Questions)

  • Q1. Excavation engineering sewage project
  • Q2. Civil engineering 6 year sewage project
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Technical engineer
  • Q2. My salary 800000
Round 2 - Technical 

(3 Questions)

  • Q1. Technical engineer
  • Q2. My salary 800000
  • Q3. Excavation Engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - Excavation engineers sewerage project delhi
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - Technical 

(2 Questions)

  • Q1. Site work related like foundation
  • Q2. Eraction and stringing
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

The goal of an aptitude test is to predict the ability to learn new skills

Round 2 - Technical 

(2 Questions)

  • Q1. What experience do you have that relates to this job role
  • Q2. Tell me about your final year projects

Interview Preparation Tips

Interview preparation tips for other job seekers - Send follow up mails
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Why do a slump test
  • Ans. 

    To determine the workability of concrete mix

    • To ensure the concrete mix has the desired consistency for proper placement and compaction

    • To assess the water content in the concrete mix

    • To check the quality of the concrete mix and its ability to flow and settle

    • To prevent issues such as segregation and bleeding in the concrete mix

    • To meet the specifications and requirements of the project

    • Example: If the slump test result show...

  • Answered by AI
  • Q2. What should be the minimum slump of concrete
  • Ans. 

    The minimum slump of concrete should be 25 mm according to standards.

    • The minimum slump of concrete is typically specified by standards such as ASTM or ACI.

    • A slump test is conducted to measure the consistency of concrete, with a minimum value of 25 mm usually required.

    • A higher slump value indicates a more workable concrete mix, while a lower value may result in difficulties during placement and compaction.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself?
Round 2 - Technical 

(1 Question)

  • Q1. Current job responsibilities?
Round 3 - Final decision for acceptance 

(1 Question)

  • Q1. Is the job is suitable for you or not?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and passionate
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. BBS ,QUANTITY TAKE OFF ,QUANTITY OF CONCRETE, lapping, and clear cover
  • Ans. Find accurate cutting length and find the total weight of rcc structure, find out all the quantity of structure, Lapping normal used 50d clear cover our for footing 50mm and beam 25mm and column for 40mm and slab 20mm
  • Answered by Jitu Behera
  • Q2. Bbs, mix design

Interview Preparation Tips

Interview preparation tips for other job seekers - Good to learn the skill
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Reason for leaving current company
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Desire for career advancement

    • Looking for new challenges

    • Seeking better work-life balance

    • Company restructuring or downsizing

    • Relocation to a new area

  • Answered by AI
  • Q2. Current job location
  • Ans. 

    Currently working in a construction company in downtown Los Angeles.

    • Working in downtown Los Angeles

    • Construction company

    • Civil engineering job

  • Answered by AI

Suntech Infra Solutions Interview FAQs

How many rounds are there in Suntech Infra Solutions Civil Engineer interview?
Suntech Infra Solutions interview process usually has 1 rounds. The most common rounds in the Suntech Infra Solutions interview process are Technical.
What are the top questions asked in Suntech Infra Solutions Civil Engineer interview?

Some of the top questions asked at the Suntech Infra Solutions Civil Engineer interview -

  1. What is the weight of steel in a 1 cubic meter concrete cu...read more
  2. What is the difference between rebar, TMT, and reinforceme...read more

Tell us how to improve this page.

Suntech Infra Solutions Civil Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Suntech Infra Solutions Civil Engineer Salary
based on 6 salaries
₹2.4 L/yr - ₹6 L/yr
16% less than the average Civil Engineer Salary in India
View more details

Suntech Infra Solutions Civil Engineer Reviews and Ratings

based on 2 reviews

4.9/5

Rating in categories

4.9

Skill development

4.9

Work-life balance

4.9

Salary

4.9

Job security

4.9

Company culture

4.9

Promotions

4.9

Work satisfaction

Explore 2 Reviews and Ratings
Safety Supervisor
6 salaries
unlock blur

₹2.4 L/yr - ₹3 L/yr

Civil Engineer
6 salaries
unlock blur

₹2.4 L/yr - ₹6 L/yr

Civil Site Engineer
6 salaries
unlock blur

₹2.5 L/yr - ₹4.7 L/yr

Senior Accounts and Taxation Manager
5 salaries
unlock blur

₹6.6 L/yr - ₹13 L/yr

Surveyor
5 salaries
unlock blur

₹3.6 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Suntech Infra Solutions with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview