Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 2 interview rounds.
Temperature rise of hydraulic oil in die casting machine is caused by friction, overloading, inadequate cooling, or contaminated oil.
Friction between moving parts can generate heat and increase oil temperature
Overloading the machine can cause excessive heat generation
Inadequate cooling system or malfunctioning cooling components can lead to temperature rise
Contaminated oil with debris or moisture can reduce lubrication
Top trending discussions
I appeared for an interview before Feb 2024.
Techinical related questioned are in the interview
A small discussion with automobile.
posted on 4 Apr 2023
I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
The root cause of burn marks can vary depending on the context, but common causes include heat exposure, electrical currents, chemical reactions, and friction.
Heat exposure: Direct contact with hot objects or surfaces can cause burn marks.
Electrical currents: Electric shocks or faulty electrical equipment can result in burn marks.
Chemical reactions: Contact with corrosive substances or strong acids can lead to burn mar...
Double ejection is used in injection molds to improve part ejection and reduce cycle time.
Double ejection helps in ejecting complex parts with undercuts or threads.
It reduces the risk of part damage during ejection.
By ejecting the part from both sides simultaneously, it speeds up the overall cycle time.
Double ejection can prevent the need for manual intervention in part removal.
It is commonly used in industries like au
posted on 18 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
posted on 12 Feb 2024
I applied via Naukri.com and was interviewed before Feb 2023. There was 1 interview round.
The 7 QC tools are a set of problem-solving tools used in quality control and process improvement.
Check sheet: Used to collect and analyze data
Control chart: Monitors process performance over time
Histogram: Visualizes data distribution
Pareto chart: Identifies and prioritizes problems
Cause-and-effect diagram: Identifies root causes of problems
Scatter diagram: Shows relationship between two variables
Flowchart: Illustrate
I applied via Approached by Company and was interviewed in Jul 2022. There were 3 interview rounds.
A CNC machine can have 3, 4, or 5 axes depending on its configuration.
The X, Y, and Z axes are common in 3-axis machines.
4-axis machines add a rotary axis, usually the A-axis.
5-axis machines add a second rotary axis, usually the B-axis.
Some machines may have additional axes for specialized operations, such as milling machines with a tilting spindle head.
The number of axes determines the machine's capabilities and the c
Maintenance procedure involves regular inspection, cleaning, repair and replacement of equipment to ensure optimal performance and prevent breakdowns.
Create a maintenance schedule based on manufacturer recommendations and equipment usage
Perform regular inspections to identify potential issues before they become major problems
Clean and lubricate equipment as needed to prevent wear and tear
Repair or replace damaged or wo...
The question is incomplete or incorrect. There is no such term as 'back las'.
There is no known term or phrase as 'back las'.
It is possible that the interviewer made a mistake or was trying to ask a different question.
As a maintenance engineer, it is important to clarify any unclear or confusing questions to ensure accurate responses.
Types of maintenance include corrective, preventive, predictive, and proactive maintenance.
Corrective maintenance involves fixing a problem after it has occurred.
Preventive maintenance involves regularly scheduled maintenance to prevent problems from occurring.
Predictive maintenance involves using data and analytics to predict when maintenance is needed.
Proactive maintenance involves identifying and addressing potentia...
The number of points in a PM checklist varies depending on the equipment being checked.
PM checklists are specific to each piece of equipment.
The number of points in a PM checklist can range from a few to hundreds.
Points in a PM checklist can include tasks such as inspecting, cleaning, and lubricating equipment.
The purpose of a PM checklist is to ensure that equipment is properly maintained and to prevent breakdowns.
The...
Machines need regular preventive maintenance (PM) to ensure optimal performance and longevity.
Regular cleaning and lubrication
Inspection and replacement of worn parts
Calibration and adjustment of sensors and controls
Testing and monitoring of performance
Documentation of maintenance activities
Training of operators and maintenance staff
MTTR stands for Mean Time To Repair and MTBF stands for Mean Time Between Failures.
MTTR is the average time taken to repair a failed system or equipment.
MTBF is the average time between two consecutive failures of a system or equipment.
MTTR is used to measure the efficiency of maintenance and repair processes.
MTBF is used to measure the reliability of a system or equipment.
MTBF = (total operating time - total downtime)...
MTTR is the average time to repair a failed system while MTBF is the average time between failures.
MTTR measures the maintainability of a system while MTBF measures its reliability.
MTTR is calculated by dividing the total downtime by the number of failures while MTBF is calculated by dividing the total uptime by the number of failures.
MTTR is usually shorter than MTBF as it only measures the time to repair a failed sys...
Breakdown is an unexpected failure of equipment or machinery. KPI stands for Key Performance Indicator, a measurable value that indicates how well a company is achieving its goals.
Breakdown can cause production delays and loss of revenue
KPIs can be used to track maintenance performance and identify areas for improvement
Examples of KPIs for maintenance include equipment uptime, mean time between failures, and maintenanc
I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
I am a highly experienced Sr. Engineer with a strong background in various engineering disciplines.
Over 10 years of experience in mechanical, electrical, and civil engineering
Led multiple successful projects from concept to completion
Proficient in CAD software such as AutoCAD and SolidWorks
I applied via Referral and was interviewed before Jun 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2023. There was 1 interview round.
Parameters of costing refer to the factors that influence the cost of a product or service.
Parameters can include materials, labor, overhead, and profit margin.
Other factors like transportation costs, taxes, and market demand can also impact costing.
Understanding and analyzing these parameters is crucial for accurate pricing and cost control.
For example, in manufacturing, the cost of raw materials and labor are key par
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Engineer
170
salaries
| ₹2.4 L/yr - ₹5.1 L/yr |
Senior Engineer
152
salaries
| ₹3.5 L/yr - ₹7.8 L/yr |
Engineer
151
salaries
| ₹2.3 L/yr - ₹7 L/yr |
Assistant Manager
130
salaries
| ₹4.9 L/yr - ₹10 L/yr |
Quality Engineer
124
salaries
| ₹1.5 L/yr - ₹5.1 L/yr |
Delphi TVS
Motherson Automotive Technologies and Engineering
Belrise Industries
Krishna Maruti