A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers are commonly used to step up or step down voltage in electrical power distribution.
They consist of two coils of wire, known as the primary and secondary coils, wrapped around a core.
The primary coil is connected to a source of alternating current, which creates a changing magnetic field...
Transformers are classified based on their construction and purpose, such as power transformers, distribution transformers, and instrument transformers.
Power transformers are used to step up or step down voltage for transmission and distribution of electricity.
Distribution transformers are used to supply lower voltage to end-users.
Instrument transformers are used for measuring voltage and current in power systems.
Other...
An inverter is an electronic device that converts direct current (DC) to alternating current (AC).
Converts DC power to AC power
Used in solar power systems to convert DC electricity from solar panels to AC electricity for use in homes
Commonly used in uninterruptible power supplies (UPS) to provide backup power during outages
The type of inverter used is a grid-tied inverter.
Grid-tied inverters are connected to the utility grid and do not require batteries.
They convert DC power from solar panels into AC power for use in the home or to be fed back into the grid.
Examples of grid-tied inverters include string inverters, microinverters, and power optimizers.
Op amp stands for operational amplifier, a type of electronic amplifier with high gain and differential inputs.
Op amp is a type of amplifier that amplifies the difference in voltage between its two inputs.
It has a very high open-loop gain, typically around 100,000.
Op amps are commonly used in signal conditioning, filtering, and mathematical operations in electronic circuits.
Examples of op amp ICs include the LM741, AD8
Transformer design involves creating efficient and reliable electrical transformers for various applications.
Consider the desired voltage and current ratings for the transformer
Select appropriate core and winding materials for optimal performance
Design the transformer to minimize losses and improve efficiency
Perform simulations and testing to validate the design
Iterate on the design to meet specifications and requireme
Top trending discussions
I applied via Referral and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in May 2021. There were 4 interview rounds.
I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.
I have 5 years of experience in retail management, overseeing teams and driving sales.
Managed a team of 15 sales associates and consistently exceeded sales targets
Implemented new training programs to improve customer service and product knowledge
Developed and executed marketing strategies to increase foot traffic and drive sales
Handled inventory management and ensured accurate stock levels
Resolved customer complaints a...
I appeared for an interview in Sep 2020.
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
I appeared for an interview before Mar 2024, where I was asked the following questions.
Greenhouse gases trap heat in the atmosphere, contributing to global warming. Their Global Warming Potential (GWP) varies significantly.
Carbon Dioxide (CO2) - GWP of 1, the most prevalent greenhouse gas.
Methane (CH4) - GWP of 25, significantly more effective than CO2 over 100 years.
Nitrous Oxide (N2O) - GWP of 298, emitted from agricultural and industrial activities.
Fluorinated gases - GWP ranges from 1,000 to over 10,
EIA (Environmental Impact Assessment) evaluates the potential environmental effects of proposed projects.
1. Screening: Determine if a project requires EIA. Example: A new highway may need an EIA.
2. Scoping: Identify key issues and impacts to be assessed. Example: Assessing effects on local wildlife.
3. Impact Assessment: Analyze potential environmental impacts. Example: Evaluating air quality changes due to construction...
posted on 20 Aug 2024
I applied via Job Portal and was interviewed in Jul 2024. There was 1 interview round.
I am a passionate software engineer with 5 years of experience in developing web applications using Java, Spring Boot, and Angular.
5 years of experience in software development
Proficient in Java, Spring Boot, and Angular
Passionate about creating innovative web applications
I completed a software engineering internship at a tech company, where I worked on developing new features for their mobile app.
Developed new features for mobile app
Collaborated with team members on coding tasks
Participated in code reviews and testing
Learned about agile development practices
based on 1 interview
Interview experience
Service Engineer
7
salaries
| ₹1 L/yr - ₹4.5 L/yr |
Assistant Manager
7
salaries
| ₹3.6 L/yr - ₹7.5 L/yr |
Area Sales Manager
6
salaries
| ₹3.5 L/yr - ₹5.3 L/yr |
Senior Executive
6
salaries
| ₹2.1 L/yr - ₹4.1 L/yr |
Branch Manager
6
salaries
| ₹6.5 L/yr - ₹10 L/yr |
ReNew
Adani Green Energy
Vestas
Jakson Group