Filter interviews by
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.
A VMC (Vertical Machining Center) typically has 3 axes.
A VMC is a type of milling machine used in manufacturing and metalworking.
The three axes of a VMC are typically X, Y, and Z.
These axes allow for movement and positioning of the cutting tool in three dimensions.
The X-axis represents horizontal movement, the Y-axis represents vertical movement, and the Z-axis represents depth or forward/backward movement.
Having three...
Top trending discussions
posted on 2 Jan 2023
I applied via Walk-in and was interviewed before Jan 2022. There were 4 interview rounds.
Basic easy aptitude questions . If you science background then it is very easy to crack
posted on 1 Aug 2024
I faced difficulty at work while working on a project due to unexpected technical issues.
Encountered a software bug that caused delays in production
Had to troubleshoot and debug the issue with the help of the development team
Implemented temporary workarounds to keep the project on track
Communicated regularly with stakeholders to provide updates on the situation
Yes, my unique combination of technical skills, problem-solving abilities, and strong communication skills set me apart from other candidates.
Strong technical skills in production engineering, including experience with various tools and technologies
Proven track record of successfully solving complex problems and optimizing production processes
Excellent communication skills, both written and verbal, allowing for effecti...
posted on 2 Jan 2023
I applied via Walk-in and was interviewed before Jan 2022. There were 4 interview rounds.
Basic easy aptitude questions . If you science background then it is very easy to crack
I applied via Recruitment Consulltant and was interviewed in Jan 2022. There were 2 interview rounds.
I am open to discussing salary based on the responsibilities and expectations of the role.
I am looking for fair compensation based on my experience and skills.
I am willing to negotiate based on the company's budget and benefits package.
I am open to discussing performance-based bonuses or incentives.
I am also interested in opportunities for professional development and growth.
I have the technical skills and experience to optimize production processes and ensure efficient operations.
I have a strong background in engineering and production management.
I am skilled in identifying and resolving production issues, reducing downtime and increasing output.
I have experience implementing lean manufacturing principles and continuous improvement initiatives.
I am a team player and have excellent communi...
I am a production engineer with experience in designing and implementing manufacturing processes.
I have a degree in mechanical engineering and have worked in the manufacturing industry for 5 years.
I have experience in process improvement, quality control, and project management.
I am skilled in using CAD software and have designed production lines for various products.
I am a team player and have worked with cross-functi...
I applied via Referral and was interviewed before Jan 2022. There were 4 interview rounds.
Managing union manpower requires effective communication, negotiation, and adherence to labor laws.
Establish open communication channels with union representatives
Negotiate fair and reasonable terms for wages, benefits, and working conditions
Ensure compliance with labor laws and collective bargaining agreements
Resolve disputes and grievances through mediation and arbitration
Maintain positive relationships with union me...
I applied via Naukri.com and was interviewed in Nov 2020. There were 5 interview rounds.
The productivity of the assembly lines depends on various factors such as equipment, labor, and process efficiency.
Productivity can be measured by the number of units produced per hour or day.
Efficient use of equipment and labor can increase productivity.
Process improvements such as reducing downtime and optimizing workflows can also boost productivity.
Regular monitoring and analysis of productivity metrics can help id...
I control non-conformity by implementing a quality management system and conducting regular audits.
Implementing a quality management system to ensure all processes are standardized and documented
Conducting regular audits to identify non-conformities and take corrective actions
Training employees on quality standards and procedures to prevent non-conformities
Establishing a system for reporting and investigating non-confo...
Reducing manpower cost can be achieved through automation, process optimization, and outsourcing.
Automate repetitive tasks to reduce the need for manual labor
Optimize production processes to eliminate inefficiencies and reduce waste
Consider outsourcing non-core functions to reduce the size of the workforce
Implement training programs to improve employee skills and productivity
Use technology to monitor and manage employe...
Defects during product assembly can be of various types
Missing parts or components
Incorrectly installed parts
Misaligned parts
Loose or over-tightened fasteners
Scratches or dents on the product
Electrical or wiring issues
Inconsistent product quality
Incomplete assembly
Poorly finished surfaces
TPM stands for Total Productive Maintenance. It is a maintenance strategy that aims to maximize equipment effectiveness and minimize downtime.
TPM involves all employees in the maintenance process
It focuses on proactive maintenance to prevent breakdowns
There are 8 pillars of TPM, including autonomous maintenance, planned maintenance, and quality maintenance
TPM aims to improve overall equipment effectiveness (OEE) by red...
OEE stands for Overall Equipment Effectiveness. It is a measure of manufacturing productivity.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability is the percentage of time the equipment is available for production.
Performance is the percentage of the maximum speed the equipment is running.
Quality is the percentage of good quality products produced.
OEE = Availability x Performance x Qual...
Lean manufacturing is a systematic approach to minimize waste and maximize value in production processes.
It focuses on continuous improvement and elimination of non-value adding activities.
Tools include 5S, Kanban, Value Stream Mapping, and Just-in-Time production.
It aims to increase efficiency, reduce lead times, and improve quality.
Examples of lean manufacturing implementation include Toyota Production System and Lea
WIP can be managed by setting clear priorities, monitoring progress, and adjusting schedules as needed.
Establish clear priorities for each project
Monitor progress regularly to identify potential delays
Adjust schedules as needed to ensure timely completion
Communicate with team members to ensure everyone is on the same page
Use tools such as Kanban boards or Gantt charts to visualize progress
Junior Engineer
29
salaries
| ₹2 L/yr - ₹4 L/yr |
Quality Engineer
19
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Engineer
15
salaries
| ₹3 L/yr - ₹5.6 L/yr |
Senior Production Engineer
12
salaries
| ₹5.1 L/yr - ₹7 L/yr |
Design Engineer
11
salaries
| ₹2.5 L/yr - ₹4.8 L/yr |
Infosys
TCS
Wipro
HCLTech