Filter interviews by
I applied via Referral and was interviewed before Jan 2022. There were 4 interview rounds.
Managing union manpower requires effective communication, negotiation, and adherence to labor laws.
Establish open communication channels with union representatives
Negotiate fair and reasonable terms for wages, benefits, and working conditions
Ensure compliance with labor laws and collective bargaining agreements
Resolve disputes and grievances through mediation and arbitration
Maintain positive relationships with union me...
I applied via Naukri.com and was interviewed in Nov 2020. There were 5 interview rounds.
The productivity of the assembly lines depends on various factors such as equipment, labor, and process efficiency.
Productivity can be measured by the number of units produced per hour or day.
Efficient use of equipment and labor can increase productivity.
Process improvements such as reducing downtime and optimizing workflows can also boost productivity.
Regular monitoring and analysis of productivity metrics can help id...
I control non-conformity by implementing a quality management system and conducting regular audits.
Implementing a quality management system to ensure all processes are standardized and documented
Conducting regular audits to identify non-conformities and take corrective actions
Training employees on quality standards and procedures to prevent non-conformities
Establishing a system for reporting and investigating non-confo...
Reducing manpower cost can be achieved through automation, process optimization, and outsourcing.
Automate repetitive tasks to reduce the need for manual labor
Optimize production processes to eliminate inefficiencies and reduce waste
Consider outsourcing non-core functions to reduce the size of the workforce
Implement training programs to improve employee skills and productivity
Use technology to monitor and manage employe...
Defects during product assembly can be of various types
Missing parts or components
Incorrectly installed parts
Misaligned parts
Loose or over-tightened fasteners
Scratches or dents on the product
Electrical or wiring issues
Inconsistent product quality
Incomplete assembly
Poorly finished surfaces
TPM stands for Total Productive Maintenance. It is a maintenance strategy that aims to maximize equipment effectiveness and minimize downtime.
TPM involves all employees in the maintenance process
It focuses on proactive maintenance to prevent breakdowns
There are 8 pillars of TPM, including autonomous maintenance, planned maintenance, and quality maintenance
TPM aims to improve overall equipment effectiveness (OEE) by red...
OEE stands for Overall Equipment Effectiveness. It is a measure of manufacturing productivity.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability is the percentage of time the equipment is available for production.
Performance is the percentage of the maximum speed the equipment is running.
Quality is the percentage of good quality products produced.
OEE = Availability x Performance x Qual...
Lean manufacturing is a systematic approach to minimize waste and maximize value in production processes.
It focuses on continuous improvement and elimination of non-value adding activities.
Tools include 5S, Kanban, Value Stream Mapping, and Just-in-Time production.
It aims to increase efficiency, reduce lead times, and improve quality.
Examples of lean manufacturing implementation include Toyota Production System and Lea
WIP can be managed by setting clear priorities, monitoring progress, and adjusting schedules as needed.
Establish clear priorities for each project
Monitor progress regularly to identify potential delays
Adjust schedules as needed to ensure timely completion
Communicate with team members to ensure everyone is on the same page
Use tools such as Kanban boards or Gantt charts to visualize progress
Top trending discussions
I applied via Company Website and was interviewed before Nov 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Oct 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Oct 2024. There were 2 interview rounds.
My project involved coordinating the production of a new line of eco-friendly packaging materials.
Managed a team of production staff to ensure timely completion of orders
Implemented new sustainable practices to reduce waste and improve efficiency
Collaborated with suppliers to source environmentally friendly materials
Conducted quality control checks to maintain high standards of production
Successfully launched the new p
I appeared for an interview before Mar 2022.
Uptime refers to the amount of time a system or machine is operational and available for use.
Uptime is typically measured as a percentage of total time, with 100% uptime indicating continuous operation.
Downtime, on the other hand, refers to the time when a system is not operational due to maintenance, repairs, or failures.
Uptime is crucial for production managers as it directly impacts productivity, efficiency, and ove...
I appeared for an interview in Jun 2017.
I am a hardworking individual with a passion for learning and growth. I completed a summer internship in marketing and come from a supportive family.
I am a hardworking individual
Passionate about learning and growth
Completed a summer internship in marketing
Come from a supportive family
To retain an employee, I will focus on creating a positive work environment and offering opportunities for growth and development.
Offer competitive salaries and benefits
Provide opportunities for training and development
Create a positive work culture with open communication and recognition
Offer flexible work arrangements
Provide opportunities for career advancement within the company
Regularly check in with employees to a...
Yes, I am comfortable with working in different cities and travelling.
I have previous experience working in different cities and travelling for work.
I am adaptable and can quickly adjust to new environments.
I enjoy exploring new places and meeting new people.
I understand the importance of being flexible and available for work-related travel.
I am willing to make necessary arrangements to ensure smooth travel and work ex
I apologize for being late. I had an emergency that I had to attend to.
I had an unexpected emergency that required my immediate attention
I made sure to inform the organizers as soon as I could
I understand the importance of punctuality and will ensure it in the future
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
31
salaries
| ₹3.6 L/yr - ₹8.6 L/yr |
Assistant Engineer
10
salaries
| ₹1.9 L/yr - ₹3.5 L/yr |
Sales Officer
9
salaries
| ₹2.7 L/yr - ₹4 L/yr |
Quality Engineer
8
salaries
| ₹2.2 L/yr - ₹3.8 L/yr |
Officer
8
salaries
| ₹3.9 L/yr - ₹4.8 L/yr |
Tata Motors
Mahindra & Mahindra
Maruti Suzuki
Ashok Leyland