i
Sona Comstar
Filter interviews by
I applied via Recruitment Consultant and was interviewed before Jul 2020. There was 1 interview round.
CNC stands for Computer Numerical Control. It is a manufacturing process that uses computerized systems to control machine tools.
CNC is a manufacturing process that automates the operation of machine tools.
It uses computerized systems to control the movement and operation of the tools.
CNC machines are widely used in industries such as automotive, aerospace, and electronics.
They can perform precise and complex operation...
G code is a programming language used to control CNC machines.
G code is used to control the movement and operation of CNC machines.
It consists of a series of commands that tell the machine what to do.
G code can be edited and customized to suit specific machining needs.
Examples of G code commands include G00 for rapid positioning and G01 for linear interpolation.
G code is often generated by CAM software based on a 3D mo
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 3 interview rounds.
A relay holding circuit diagram is used to keep the relay in the energized state even after the control signal is removed.
The circuit typically includes a holding contact that maintains the relay coil energized.
A latching relay can also be used for holding without continuous power supply.
Examples: ladder logic diagram with a holding contact, latching relay circuit diagram.
PNP and NPN are types of bipolar junction transistors commonly used in electronic circuits.
PNP transistor has a layer of N-type semiconductor between two layers of P-type semiconductor, while NPN transistor has a layer of P-type semiconductor between two layers of N-type semiconductor.
In a PNP transistor, current flows from the emitter to the base and then to the collector, while in an NPN transistor, current flows fro...
There are various types of sensors used for different purposes.
Temperature sensors (e.g. thermocouples, thermistors)
Pressure sensors (e.g. piezoelectric sensors)
Motion sensors (e.g. accelerometers, gyroscopes)
Proximity sensors (e.g. ultrasonic sensors)
Light sensors (e.g. photodiodes, phototransistors)
PLC stands for Programmable Logic Controller, which is a digital computer used for automation of electromechanical processes.
PLC is used to control machinery in manufacturing processes, such as assembly lines, robotic devices, or any activity that requires high reliability control.
It is programmed using a specialized computer language, typically ladder logic or function block diagram.
PLCs are commonly used in industrie...
I applied via Company Website
TTR stands for Total Thickness Range and is required for powder coating process to ensure proper adhesion and durability.
TTR is the range of thickness of the substrate and any coatings applied to it
It is important for powder coating as it ensures proper adhesion and durability
If the TTR is too large, the coating may not adhere properly or may crack and peel over time
Examples of substrates with varying TTR include alumi
Detection and prevention poka-yoke refers to the use of techniques to identify and prevent errors in a process.
Poka-yoke is a Japanese term for mistake-proofing
Detection poka-yoke involves identifying errors as they occur
Prevention poka-yoke involves designing processes to prevent errors from occurring
Examples of poka-yoke include using checklists, color-coding, and physical barriers
Poka-yoke can improve quality, reduc
Decrease in pH can occur due to various factors in conversion coating.
Decrease in pH can be caused by the addition of an acid or acidic solution.
Presence of reactive metals in the coating can lead to a decrease in pH.
Contamination by organic materials or impurities can also lower the pH.
Chemical reactions during the conversion coating process may result in pH decrease.
Examples of conversion coatings include phosphating
To prepare 0.1 N H2SO4 & NaOH, calculate the required amount of solute and dissolve it in distilled water.
Calculate the molar mass of H2SO4 and NaOH
Determine the required amount of solute using the formula: N = (W/M) x (1000/V)
Dissolve the calculated amount of solute in distilled water to make 1 liter of solution
Standardize the solution using a primary standard
Use a burette to measure the volume of solution needed for
To cross verify 0.1 normality H2SO4, use a standard solution of NaOH and an indicator.
Prepare a standard solution of NaOH of known concentration.
Add a few drops of an indicator such as phenolphthalein to the H2SO4 solution.
Titrate the H2SO4 solution with the NaOH solution until the endpoint is reached.
The endpoint is when the indicator changes color, indicating that all the H2SO4 has reacted with the NaOH.
Calculate the...
Prepare a pH buffer solution as per defined standard in tablet.
Determine the required pH value and buffer capacity
Select the appropriate buffer system and calculate the required amounts of buffer components
Dissolve the buffer components in water and adjust the pH as necessary
Check the pH and adjust if necessary
Filter the solution and store in a clean container
Use a calibrated pH meter to verify the pH of the solution
I applied via Walk-in and was interviewed before Mar 2020. There were 3 interview rounds.
Department and work related question.
I applied via Naukri.com and was interviewed in Dec 2020. There was 1 interview round.
I applied via Walk-in and was interviewed before Sep 2021. There were 4 interview rounds.
Reasoning, General English,Maths
I applied via Walk-in and was interviewed before Sep 2021. There were 3 interview rounds.
General English, Maths,Basics in Diploma.
I applied via Walk-in and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Dec 2022. There were 3 interview rounds.
There are three main types of defects in engineering: design defects, manufacturing defects, and usage defects.
Design defects occur when there is an issue with the initial design of a product, leading to problems in its functionality or safety. For example, a car with a faulty braking system due to a design flaw.
Manufacturing defects happen during the production process, resulting in a product that does not meet the in...
The 7 wastes refer to inefficiencies in a process that can be eliminated to improve productivity and quality.
Transportation: Unnecessary movement of materials or products
Inventory: Excess inventory leading to waste of resources
Motion: Unnecessary movement of people
Waiting: Idle time in a process
Overproduction: Producing more than needed
Overprocessing: Doing more work than necessary
Defects: Errors that require rework or
Line balance refers to distributing workload evenly among different stations in a production line to optimize efficiency.
Line balance ensures that each station in the production line has a similar amount of work to do.
It helps in preventing bottlenecks and maximizing throughput.
Line balance can be achieved by adjusting the cycle times at each station or by adding/subtracting workstations.
An example of line balance is i...
To reduce defects and increase productivity, focus on continuous improvement, training, quality control, and efficient processes.
Implement a quality control system to catch defects early on
Provide regular training to employees to improve skills and knowledge
Analyze data to identify root causes of defects and implement corrective actions
Streamline processes to eliminate waste and improve efficiency
OEE stands for Overall Equipment Effectiveness, a measure of how well a manufacturing process is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality.
Factors affecting OEE include equipment downtime, speed loss, and defects in production.
Improving OEE involves reducing downtime, increasing production speed, and minimizing defects.
For example, implementing preventive maintenance can reduce eq
based on 1 review
Rating in categories
Senior Engineer
161
salaries
| ₹4.4 L/yr - ₹14.5 L/yr |
Engineer
148
salaries
| ₹2.5 L/yr - ₹7.8 L/yr |
Junior Engineer
147
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Assistant Manager
118
salaries
| ₹7.5 L/yr - ₹16.6 L/yr |
Quality Engineer
109
salaries
| ₹1.2 L/yr - ₹6 L/yr |
Ceat Tyres
UNO Minda
Apollo Tyres
Exide Industries