I applied via Naukri.com and was interviewed in Jul 2022. There were 2 interview rounds.
To check engine oil, locate the dipstick and remove it. To check coolant, locate the reservoir and check the level.
For engine oil, locate the dipstick, pull it out, wipe it clean, reinsert it, and then pull it out again to check the level.
For coolant, locate the reservoir and check the level. The reservoir is usually translucent and has markings indicating the minimum and maximum levels.
Make sure the engine is cool bef...
I was interviewed in Oct 2024.
My previous experience in Saudi Arabia
I applied via Recruitment Consultant and was interviewed in Sep 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.
Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.
Plant layout should prioritize safety and minimize the risk of accidents.
Efficiency is also important, with consideration given to the flow of materials and equipment.
Regulations and industry standards must be followed, such as those set by OSHA and API.
Examples of layout considerations include spacing between equipment,...
The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.
The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.
It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...
DCU stands for Dublin City University, a university located in Dublin, Ireland.
DCU was established in 1980 and has over 17,000 students.
It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.
DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.
Some not...
Delayed is called so because it refers to something that is postponed or occurs after the expected time.
The term 'delayed' is used to describe situations where there is a time lag or postponement.
It implies that something is not happening immediately or as scheduled.
Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.
For example, a delayed flight refers to ...
I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.
Population projection methods include cohort-component, trend extrapolation, and expert opinion. For water supply projects, population can be projected based on historical data, demographic trends, and development plans.
Population projection methods: cohort-component, trend extrapolation, expert opinion
For water supply projects, project population based on historical data, demographic trends, development plans
Consider ...
Water distribution systems are designed using hydraulic principles to ensure efficient water supply to consumers. Elevated service reservoirs are designed to store and distribute water at higher elevations.
Water distribution systems are designed based on factors such as population served, water demand, topography, and available water sources.
Hydraulic calculations are used to determine pipe sizes, flow rates, and press...
I applied via Campus Placement and was interviewed before Dec 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Apr 2021. There were 2 interview rounds.
The daily progress rate of welders varies based on factors such as experience, type of welding, and complexity of the project.
Welders with more experience tend to have a higher daily progress rate.
The type of welding being done can also affect the daily progress rate. For example, TIG welding may take longer than MIG welding.
The complexity of the project can also impact the daily progress rate. A simple welding project...
Project delays can be caused by various constraints.
Project delays can be caused by resource constraints such as lack of manpower or budget constraints.
Technical constraints such as unexpected technical issues or changes in requirements can also cause delays.
External constraints such as weather conditions or delays in receiving materials can also impact project timelines.
Effective project management can help mitigate t
based on 1 interview
Interview experience
Assistant Manager
125
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
93
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
73
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
65
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Reliance Infrastructure
GMR Group