I applied via Recruitment Consultant and was interviewed before Oct 2018. There were 4 interview rounds.
The press pit excavation RCC retaining wall estimation involves calculating the cost of excavation and construction of a retaining wall.
Calculate the volume of the excavation required for the press pit
Determine the type and size of the RCC retaining wall needed
Estimate the cost of materials and labor for the excavation and construction
Consider any additional costs such as equipment rental or site preparation
Factor in a...