I applied via Referral and was interviewed before Feb 2021. There were 2 interview rounds.
Top trending discussions
posted on 23 Jun 2024
I applied via campus placement at Rajalakshmi Engineering College, Chennai and was interviewed in Dec 2024. There were 3 interview rounds.
Reasoning and Technical Questions
Social media - Environment - global warming
My favorite subjects in mechanical engineering are thermodynamics, fluid mechanics, and materials science.
Thermodynamics: Study of energy and heat transfer in mechanical systems. Example: analyzing the efficiency of an engine.
Fluid mechanics: Study of fluids in motion and at rest. Example: designing a pump system for a manufacturing plant.
Materials science: Study of properties and behavior of materials. Example: select...
posted on 5 Feb 2025
I was interviewed in Aug 2024.
posted on 11 Jun 2024
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
Yes, I am friendly with CREO software.
I have extensive experience using CREO software for designing and modeling.
I am proficient in creating 3D models, assemblies, and drawings using CREO.
I have successfully completed projects using CREO software in the past.
I am familiar with advanced features and functionalities of CREO software.
I was interviewed in Nov 2023.
To add a connector in CAptila harness, you need to use the appropriate tool and follow specific steps.
Open the CAptila harness design software
Select the location where you want to add the connector
Choose the type of connector from the library
Place the connector in the desired location
Connect the wires to the connector pins
Verify the connection and run any necessary simulations
I applied via Referral and was interviewed in Aug 2023. There were 3 interview rounds.
PPAP stands for Production Part Approval Process, a standardized process in the automotive industry to ensure suppliers meet quality standards.
PPAP is a set of documents and procedures used to approve parts for production in the automotive industry.
It includes documentation such as design records, engineering change documents, process flow diagrams, control plans, and more.
PPAP is typically required by automotive manuf...
posted on 26 Jun 2024
based on 1 review
Rating in categories
Assistant Manager
147
salaries
| ₹5.1 L/yr - ₹20 L/yr |
Deputy Manager
108
salaries
| ₹9.6 L/yr - ₹21 L/yr |
Key Account Manager
79
salaries
| ₹9 L/yr - ₹23 L/yr |
Production Engineer
67
salaries
| ₹1.3 L/yr - ₹5 L/yr |
Trainee
52
salaries
| ₹1 L/yr - ₹3.2 L/yr |
Timken
Schaeffler India
Ntn Bearing
NSK