Filter interviews by
I applied via Approached by Company and was interviewed before Jun 2021. There were 3 interview rounds.
Approach for determining required CTC
Research industry standards and salary ranges for similar positions
Consider the cost of living in the area where the job is located
Factor in the candidate's experience, skills, and education
Take into account any additional benefits or perks offered by the company
Be prepared to negotiate and adjust the offer based on the candidate's expectations
Top trending discussions
I applied via Campus Placement and was interviewed before Mar 2023. There were 2 interview rounds.
Questions related to heat treatment
I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.
posted on 21 Jan 2025
I appeared for an interview in Dec 2024.
Welding is a fabrication process that joins materials, usually metals, by melting them together.
Welding involves applying heat to the materials being joined, often with the use of a filler material.
Common types of welding include arc welding, MIG welding, TIG welding, and spot welding.
Welding is used in various industries such as construction, automotive, aerospace, and manufacturing.
Examples of welded products include...
I currently manage a team of 10 production technicians.
I oversee a team of 10 production technicians
I am responsible for coordinating schedules and tasks for the team
I provide guidance and support to the team members
I handle performance evaluations and training for the team
posted on 18 Nov 2024
I applied via Referral and was interviewed before Nov 2023. There were 3 interview rounds.
Creating a CNC program based on a drawing
Understand the dimensions and features of the drawing
Identify the tool paths and cutting operations required
Translate the drawing into G-code instructions for the CNC machine
Setting a CNC machine tool involves preparing the machine for operation, taking offset measurements, and running the program.
Prepare the CNC machine by turning it on and ensuring all necessary tools and materials are ready
Set the workpiece securely in place on the machine bed
Take offset measurements to ensure the tool is properly aligned with the workpiece
Load the program into the machine's control unit and run the pro
I joined the company in January 2020.
Joined in January 2020
Transitioned from previous role smoothly
Excited to contribute to the team
The decision to force someone to immediately join a company should be carefully considered.
Consider the candidate's current commitments and availability
Discuss the reasons for the urgency in joining
Evaluate the impact on the candidate's work-life balance
Ensure the candidate has enough time to prepare for the new role
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 3 interview rounds.
Seeking new challenges and growth opportunities.
Looking for a more challenging role that aligns with my career goals.
Seeking a company with a better work-life balance.
Wanting to expand my skill set and learn new technologies.
Desire for career advancement and professional development.
Company restructuring or downsizing.
Relocation or commute issues.
Unsatisfactory work environment or culture.
Lack of recognition or appreci...
As a Production Engineer, I can handle a team of skilled manpower efficiently.
I have experience managing teams of up to 20 people in my previous role.
I am skilled in delegating tasks, setting priorities, and ensuring smooth workflow.
I believe in effective communication and fostering a positive work environment.
I can handle manpower by assessing their skills, assigning appropriate tasks, and providing necessary guidance...
Explanation of how to calculate OEE, 7 QC tools, TPM, JH steps, SPC
OEE = Availability x Performance x Quality
7 QC tools include Pareto chart, fishbone diagram, control chart, etc.
TPM involves total employee involvement in maintenance
JH steps include job analysis, job design, job instruction, etc.
SPC involves statistical analysis of process data
Tools that can be used in the given drawing for Production Engineer.
CAD software like AutoCAD, SolidWorks, etc. for designing and drafting
CAM software like Mastercam, EdgeCAM, etc. for creating toolpaths and generating G-code
CNC machines for cutting, drilling, and shaping the parts
Measuring tools like calipers, micrometers, etc. for quality control
Hand tools like wrenches, pliers, etc. for assembly and maintenance
posted on 27 May 2024
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There were 2 interview rounds.
Production related and other
posted on 1 Jul 2021
OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a manufacturing operation is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability measures the percentage of time that equipment is available for production.
Performance measures the speed at which the equipment operates compared to its designed speed.
Quality measures the percentage of good-quality pr...
Production planning in shopfloor involves creating a detailed plan for manufacturing processes to ensure efficient and timely production.
Production planning involves determining the sequence of operations, resources required, and estimated time for each task.
It includes creating a production schedule, allocating resources, and coordinating with different departments.
The goal is to optimize production, minimize downtime...
Productivity is the measure of efficiency and output in relation to the resources used.
Productivity is a measure of how efficiently resources are used to produce goods or services.
It is the ratio of output to input, indicating how much is produced per unit of input.
Higher productivity means achieving more output with the same or fewer resources.
For example, in manufacturing, productivity can be measured by the number o...
5S is a methodology used to organize and maintain a clean, efficient, and safe work environment.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order focuses on arranging necessary items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize establishes guidelines and procedures for maintain...
posted on 31 Aug 2022
I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.
posted on 16 Jan 2025
I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.
based on 2 reviews
Rating in categories
Quality Engineer
21
salaries
| ₹1.4 L/yr - ₹4.3 L/yr |
Design Manager
14
salaries
| ₹5 L/yr - ₹6 L/yr |
Production Engineer
12
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Design Engineer
7
salaries
| ₹2.5 L/yr - ₹4.8 L/yr |
Production Manager
7
salaries
| ₹4 L/yr - ₹10.3 L/yr |
Knorr-Bremse
Greaves Cotton
Sanden Vikas
Victora Auto Private Limited